98-2139. Trunkline Gas Company, Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 19 (Thursday, January 29, 1998)]
[Notices]
[Pages 4437-4438]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-2139]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-181-000]
Trunkline Gas Company, Notice of Request Under Blanket
Authorization
January 23, 1998.
Take notice that on January 13, 1998, Trunkline Gas Company
(Trunkline), P.O. Box 1642, Houston, Texas 77251-1642, filed in Docket
No. CP98-181-000 a request pursuant to Secs. 157.205 and 157.211 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205,
157.211) for authorization to construct, own and operate certain
facilities to be located in Harris County, Texas, under Trunkline's
blanket certificate issued in Docket No. CP83-84-000 pursuant to
Section 7 of the Natural Gas Act, all as more fully set forth in the
request that is on file with the Commission and open to public
inspection.
Trunkline proposes to install a 2'' hot tap, check valve,
insulating flange and associated facilities on its 24'' Line 100-1 in
Harris County at milepost 1.53, and install electronic gas measurement
equipment (EGM) to establish a delivery point to Cypress Public
Service, L.P. The new interconnect will have a design capacity up to
2,000 Mcf/d. The estimated cost of the proposed facilities is
approximately $38,820.
Trunkline states that the construction of the proposed facilities
will have no effect on its peak day and annual deliveries, that its
existing tariff does not prohibit additional facilities, that
deliveries will be accomplished without detriment or disadvantage to
its other customers and that the total volumes delivered will not
exceed total volumes authorized prior to this request.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
[[Page 4438]]
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-2139 Filed 1-28-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/29/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-2139
- Pages:
- 4437-4438 (2 pages)
- Docket Numbers:
- Docket No. CP98-181-000
- PDF File:
-
98-2139.pdf