98-2147. Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff
[Federal Register Volume 63, Number 19 (Thursday, January 29, 1998)]
[Notices]
[Pages 4436-4437]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-2147]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. TM98-5-29-000]
Transcontinental Gas Pipe Line Corporation; Notice of Proposed
Changes in FERC Gas Tariff
January 23, 1998.
Take notice that on January 8, 1998, Transcontinental Gas Pipe Line
Corporation tendered for filing as part of its FERC Gas Tariff, Third
Revised Volume No. 1, certain revised tariff sheets which are
enumerated in Appendix A to the filing.
Transco states that the purpose of the filing is to track rate and
fuel changes attributable to storage service purchased from Texas
Eastern Transmission Corporation (TETCO) under its Rate Schedule X-28,
the costs of which are included in the rates and charges payable under
Transco's Rate Schedule S-2 and transportation service purchased from
Texas Gas Transmission Corporation (Texas Gas) under its Rate Schedule
FT, the costs of which are included in the rates and charges payable
under Transco's Rate Schedule FT-NT.
Transco states that the filing is being made pursuant to tracking
provisions under Section 26 of the General Terms and Conditions of
Transco's Volume No. 1 Tariff and Section 4 of Transco's Rate Schedule
FT-NT.
Transco states that included in Appendices B and C attached to the
filing are explanations of the rate and fuel charges and details
regarding the computation of the revised Rate Schedule S-2 and FT-NT
rates.
Transco states that copies of the filing are being mailed to its
affected customers and interested State Commissions.
Any person desiring to be heard or to protest this filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Section 385.214 and Section 385.211 of the
Commission's Regulations. All such motions or protests must be filed in
accordance with Section 154.210 of the Commission's Regulations.
Protests will be considered by the Commission in
[[Page 4437]]
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Any person wishing to
become a party must file a motion to intervene. Copies of this filing
are on file with the Commission and are available for public inspection
in the Public Reference Room.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-2147 Filed 1-28-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/29/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-2147
- Pages:
- 4436-4437 (2 pages)
- Docket Numbers:
- Docket No. TM98-5-29-000
- PDF File:
-
98-2147.pdf