[Federal Register Volume 60, Number 1 (Tuesday, January 3, 1995)]
[Notices]
[Page 106]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-32316]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. FE C&E 94-16--Certification Notice--144]
Longview Fibre Company; Notice of Filing of Coal Capability
Powerplant and Industrial Fuel Use Act
AGENCY: Office of Fossil Energy, Department of Energy.
ACTION: Notice of filing.
-----------------------------------------------------------------------
SUMMARY: On December 16, 1994, Longview Fibre Company submitted a coal
capability self-certification pursuant to section 201 of the Powerplant
and Industrial Fuel Use Act of 1978, as amended.
ADDRESSES: Copies of self-certification filings are available for
public inspection, upon request, in the Office of Fuels Programs,
Fossil Energy, Room 3F-056, FE-52, Forrestal Building, 1000
Independence Avenue, SW., Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT: Ellen Russell at (202) 586-9624.
SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial
Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.),
provides that no new baseload electric powerplant may be constructed or
operated without the capability to use coal or another alternate fuel
as a primary energy source. In order to meet the requirement of coal
capability, the owner or operator of such facilities proposing to use
natural gas or petroleum as its primary energy source shall certify,
pursuant to FUA section 201(d), to the Secretary of Energy prior to
construction, or prior to operation as a base load powerplant, that
such powerplant has the capability to use coal or another alternate
fuel. Such certification establishes compliance with section 201(a) as
of the date filed with the Department of Energy. The Secretary is
required to publish a notice in the Federal Register that a
certification has been filed. The following owner/operator of a
proposed new baseload powerplant has filed a self-certification in
acccordance with section 201(d).
Owner: Longview Fibre Company
Longview, Washington.
Operator: Longview Fibre Company
Longview, Washington.
Location: Longview, Washington.
Plant Configuration: Combined cycle Cogeneration.
Capacity: 68 megawatts.
Fuel: Natural gas.
Purchasing Entities: No present contracts (expects to sell 50%
output in the future).
In-Service Date: May, 1995.
Issued in Washington, DC, December 28, 1994.
Anthony J. Como,
Director, Office of Coal & Electricity, Office of Fuels Programs,
Office of Fossil Energy.
[FR Doc. 94-32316 Filed 12-30-94; 8:45 am]
BILLING CODE 6450-01-P