[Federal Register Volume 65, Number 1 (Monday, January 3, 2000)]
[Notices]
[Pages 128-131]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-34012]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG00-52-000, et al.]
Frontera Generation Limited Partnership, et al.; Electric Rate
and Corporate Regulation Filings
December 23, 1999.
Take notice that the following filings have been made with the
Commission:
1. Frontera Generation Limited Partnership
[Docket No. EG00-52-000]
Take notice that on December 16, 1999, Frontera Generation Limited
Partnership, 1616 Woodall Rodgers Freeway, Dallas, Texas 75202, filed
with the Federal Energy Regulatory Commission an application for a new
determination of exempt wholesale generator status pursuant to Part 365
of the Commission's Regulations.
Comment date: January 23, 2000, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. AmerGen Energy Company, L.L.C.
[Docket No. EG00-53-000]
Take notice that on December 16, 1999, AmerGen Energy Company,
L.L.C., submitted an application for Exempt Wholesale Generator status
pursuant to Section 32 of the Public Utility Holding Company Act of
1935.
Comment date: January 13, 2000, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
3. San Joaquin CoGen Limited
[Docket Nos. EL00-29-000 and QF86-971-004]
Take notice that on December 16, 1999, San Joaquin CoGen Limited
(San Joaquin) filed an Application for Acceptance of Settlement and
Request for Regulatory Exemptions. San Joaquin requests Commission
approval of a settlement agreement between San Joaquin CoGen Limited
(and related parties) and seeks certain regulatory approvals.
Comment date: January 18, 2000, in accordance with Standard
Paragraph E at the end of this notice.
4. GDK Corp; Power Access Management
[Docket Nos. ER96-1735-013 and ER97-1084-008]
Take notice that on December 6, 1999, the above-mentioned power
marketers filed quarterly reports with the Commission in the above-
mentioned proceedings for information only.
5. Revelation Energy Resources Corporation
[Docket Nos. ER97-765-004 and ER97-765-005]
Take notice that on December 7, 1999, the above-mentioned power
marketer filed quarterly reports with the Commission in the above-
mentioned proceedings for information only.
6. Brownsville Power I, L.L.C.
[Docket No. ER00-826-000]
Take notice that on December 17, 1999, Brownsville Power I, L.L.C.
(Brownsville Power), tendered for filing Notice of Succession with the
Federal Energy Regulatory Commission indicating that the name of SCC-
L1, L.L.C. has been changed to Brownsville Power effective December 8,
1999. In accordance with Sections 35.16 and 131.51 of the Commission's
regulations, 18 CFR 35.16, 131.51, Brownsville Power adopted and
ratified all applicable rate schedules filed with the FERC by SCC-L1,
L.L.C.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
7. New Albany Power I, L.L.C.
[Docket No. ER00-827-000]
Take notice that on December 17, 1999, New Albany Power I, L.L.C.
(New Albany Power), tendered for filing Notice of Succession with the
Federal Energy Regulatory Commission indicating that the name of SCC-
L3, L.L.C. has been changed to New Albany Power effective December 8,
1999. In accordance with Sections 35.16 and 131.51 of the Commission's
regulations, 18 CFR 35.16, 131.51, New Albany Power adopted and
ratified all applicable rate schedules filed with the FERC by SCC-L3,
L.L.C.
[[Page 129]]
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
8. Caledonia Power I, L.L.C.
[Docket No. ER00-828-000]
Take notice that on December 17, 1999, Caledonia Power I, L.L.C.
(Caledonia Power), tendered for filing Notice of Succession with the
Federal Energy Regulatory Commission indicating that the name of SCC-
L2, L.L.C. has been changed to Caledonia Power effective December 8,
1999. In accordance with Sections 35.16 and 131.51 of the Commission's
regulations, 18 CFR 35.16, 131.51, Caledonia Power adopted and ratified
all applicable rate schedules filed with the FERC by SCC-L2, L.L.C.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
9. Reliant Energy Services, Inc.
[Docket No. ER00-829-000]
Take notice that on December 17, 1999, Reliant Energy Services,
Inc. (RES), tendered for filing in compliance with the Commission's
Order issued November 10, 1999 in California Indep. Sys. Operator
Corp., 89 FERC para. 61,153 (1999), and pursuant to Section 205 of the
Federal Power Act, 16 U.S.C. Sec. 824d (1994), and Part 35 of the
Commission's Regulations, 18 CFR part 35, a revised FERC Electric Rate
Schedule No. 1 providing for the resale of firm transmission rights
issued by the California Independent System Operator Corporation.
RES, an indirect, wholly-owned subsidiary of Reliant Energy,
Incorporated, is a power marketer authorized to sell electric energy
and capacity at wholesale at market-based rates.
RES requests waiver of the prior notice requirements of Section
35.3 of the Commission's regulations, 18 CFR 35.3, to permit its
revised FERC Electric Rate Schedule No. 1 to become effective as of
February 1, 2000.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
10. San Diego Gas & Electric Company
[Docket No. ER00-830-000]
Take notice that on December 17, 1999, San Diego Gas & Electric
(SDG&E), tendered for filing a change in rate for the Transmission
Revenue Balancing Account Adjustment set forth in its Transmission
Owner Tariff (TO Tariff). The effect of this rate change is to reduce
rates for jurisdictional transmission service utilizing that portion of
the California Independent System Operator-Controlled Grid owned by
SDG&E.
SDG&E requests that this rate change be made effective January 1,
2000.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
11. Allegheny Energy Service Corporation on behalf of Allegheny
Energy Supply Company, L.L.C.
[Docket No. ER00-831-000]
Take notice that on December 17, 1999, Allegheny Energy Service
Corporation on behalf of Allegheny Energy Supply Company, LLC
(Allegheny Energy Supply), tendered for filing Supplement No. 3 to add
one (1) new Customer to the Market Rate Tariff under which Allegheny
Energy Supply offers generation services.
Allegheny Energy Supply requests a waiver of notice requirements to
make service available as of December 16, 1999 to Baltimore Gas and
Electric Company.
Copies of the filing have been provided to the Public Utilities
Commission of Ohio, the Pennsylvania Public Utility Commission, the
Maryland Public Service Commission, the Virginia State Corporation
Commission, the West Virginia Public Service Commission, and all
parties of record.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
12. Allegheny Energy Service Corporation on behalf of Allegheny
Energy Supply Company L.L.C.
[Docket No. ER00-832-000]
Take notice that on December 17, 1999, Allegheny Energy Service
Corporation on behalf of Allegheny Energy Supply Company, LLC
(Allegheny Energy Supply), tendered for filing Supplement No. 4 to add
one (1) new Customer to the Market Rate Tariff under which Allegheny
Energy Supply offers generation services.
Allegheny Energy Supply requests a waiver of notice requirements to
make service available as of December 16, 1999 to UtiliCorp United,
Inc.
Copies of the filing have been provided to the Public Utilities
Commission of Ohio, the Pennsylvania Public Utility Commission, the
Maryland Public Service Commission, the Virginia State Corporation
Commission, the West Virginia Public Service Commission, and all
parties of record.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
13. Enron Power Marketing, Inc.
[Docket No. ER00-833-000]
Take notice that on December 17, 1999, Enron Power Marketing, Inc.
(EPMI), tendered for filing pursuant to Section 205 of the Federal
Power Act, its FERC Electric Rate Schedule No. 3 for the Sale,
Assignment or Transfer of Firm Transmission Rights (FTRs) to become
effective as of December 1, 1999, EPMI requests a waiver of the 60-day
notice requirement. The Rate Schedule authorizes EPMI to sell, assign
or transfer FTRs in California. EPMI states that Rate Schedule No. 3 is
filed in accordance with the Commission's order in California
Independent System Operator Corporation, 89 FERC para. 61,153 (1999).
This filing was sent to the California Independent System Operator
Corporation.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
14. Southwest Power Pool, Inc.
[Docket No. ER00-834-000]
Take notice that on December 17, 1999, Southwest Power Pool, Inc.
(SPP), tendered for filing 65 executed service agreements for loss
compensation service under the SPP Tariff.
SPP seeks an effective date of January 1, 2000, for each of these
agreements.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
15. Ameren Services Company
[Docket No. ER00-835-000]
Take notice that on December 17, 1999, Ameren Services Company
(AMS), as Agent for Central Illinois Public Service Company (CIPS),
tendered for filing Agreement and Third Amendment dated November 1,
1999, to the Power Supply and Transmission Services Agreement, dated
January 9, 1992 between Wabash Valley Power Association and Central
Illinois Public Service Company. AMS asserts that the purpose of the
Amendment is to facilitate assignment of the Agreement to a GENCO and
establish new pricing for capacity and energy.
AMS requests that these filings be permitted to become effective
November 1, 1999.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 130]]
16. Ameren Services Company
[Docket No. ER00-836-000]
Take notice that on December 17, 1999, Ameren Services Company
(ASC) tendered for filing Service Agreements for Firm Point-to-Point
Transmission Services between ASC and Ameren Services Company,
Minnesota Power, Inc. and Delmarva Power & Light (the parties). ASC
asserts that the purpose of the Agreements is to permit ASC to provide
transmission service to the parties pursuant to Ameren's Open Access
Transmission Tariff filed in Docket No. ER 96-677-004.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
17. Ameren Services Company
[Docket No. ER00-837-000]
Take notice that on December 17, 1999, Ameren Services Company
(ASC), tendered for filing Service Agreements for Non-Firm Point-to-
Point Transmission Services between ASC and Ameren Services Company,
Minnesota Power, Inc. and Delmarva Power & Light (the parties). ASC
asserts that the purpose of the Agreements is to permit ASC to provide
transmission service to the parties pursuant to Ameren's Open Access
Transmission Tariff filed in Docket No. ER96-677-004.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
18. PJM Interconnection, L.L.C.
[Docket No. ER00-838-000]
Take notice that on December 17, 1999, PJM Interconnection, L.L.C.
(PJM), tendered for filing three executed umbrella service agreements
with Commonwealth Energy Corporation d/b/a
electricAMERICATM. One agreement is for non-firm point-to-
point service. A second is an umbrella service agreement for short-term
firm point-to-point service. The third agreement is an umbrella service
agreement for network integration transmission service under state
required retail access programs.
Copies of this filing were served upon Commonwealth Energy
Corporation d/b/a electricAMERICATM.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
19. Southwest Power Pool, Inc.
[Docket No. ER00-839-000]
Take notice that on December 17, 1999, Southwest Power Pool, Inc.
(SPP), tendered for filing executed service agreements for firm point-
to-point and non-firm point-to-point transmission service under the SPP
Tariff with the City of Independence, Missouri (City), Coral Power,
L.L.C. (Coral), and with Southwestern Public Service Company (SPS).
Copies of this filing were served upon the City, Coral and SPS.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
20. Tenaska Alabama Partners, L.P.
[Docket No. ER00-840-000]
Take notice that on December 17, 1999, Tenaska Alabama Partners,
L.P., 1044 North 115th Street, Suite 400, Omaha, Nebraska 68154
(Tenaska Alabama), which will own and operate a natural gas-fired
electric generating facility to be constructed in Autauga County,
Alabama, submitted for filing with the Federal Energy Regulatory
Commission its initial FERC Electric Rate Schedule No. 1 which will
enable Tenaska Alabama to engage in the sale of electric energy and
capacity at market-based rates.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
21. Detroit Edison Company
[Docket No. ER00-841-000]
Take notice that on December 13, 1999, The Detroit Edison Company
(Detroit Edison), tendered for filing Service Agreement (the Service
Agreement) for Short-Term Firm and Non-Firm Point-to-Point Transmission
Service under the Open Access Transmission Tariff of Detroit Edison,
FERC Electric Tariff No. 1, between Detroit Edison and Nordic Electric,
dated as of (November 30, 1999). The parties have not engaged in any
transactions under the Service Agreements prior to thirty days to this
filing.
Detroit Edison requests that the Service Agreements be made
effective as rate schedules as of December 31, 1999.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
22. Virginia Electric and Power Company
[Docket No. ER00-843-000]
Take notice that on December 17, 1999, Virginia Electric and Power
Company (Virginia Power), tendered for filing (i) an Agreement for the
Purchase of Electricity for Resale from Virginia Electric and Power
Company; (ii) a service agreement providing for the Town of Enfield
(Enfield) to take Network Integration Transmission Service from
Virginia Power under the Company's open access transmission tariff
(OATT); and (iii) a network operating agreement between Virginia Power
and Enfield also under the OATT.
Virginia Power respectfully requests an effective date of January
1, 2000.
Copies of the filing were served upon Enfield, the Virginia State
Corporation Commission and the North Carolina Utilities Commission.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
23. MidAmerican Energy Company
[Docket No. OA00-2-000]
Take notice that on December 17, 1999, MidAmerican Energy Company
(MidAmerican) submitted revised standards of conduct under Order No.
889 et seq.\1\
---------------------------------------------------------------------------
\1\ Open Access Same-Time Information System (Formerly Real-Time
Information network) and Standards of Conduct, 61 FR 21737 (May 10,
1996), FERC Stats. & Regs., Regulations Preambles January 1991-1996
para. 31,035 (April 24, 1996), Order No. 889-A, order on rehearing,
62 FR 12484 (March 14, 1997), III FERC Stats. & Regs. para. 31,049
(March 4, 1997); Order No. 889-B, rehearing denied, 62 FR 64715
(December 9, 1997), III FERC Stats. & Regs. para. 31,253 (November
25, 1997).
---------------------------------------------------------------------------
MidAmerican states that it served copies of the filing on
representatives of all customers having a service agreement with
MidAmerican and to the Iowa Utilities Board, Illinois Commerce
Commission and the South Dakota Public Utilities Commission.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
24. Southern California Edison Company
[Docket No. ER00-845-000]
Take notice that on December 17, 1999, Southern California Edison
Company (SCE), tendered for filing a revision to its Transmission Owner
Tariff (TO Tariff). The revised TO Tariff will allow SCE to recover
costs billed to it by the California Independent System Operator (ISO)
for out-of-market dispatch calls due to locational reliability needs or
transmission outages from its TO Tariff customers through the
Transmission Revenue Balancing Account Adjustment (TRBAA) mechanism.
SCE proposes that such revision become effective on the date when
the ISO Tariff Amendment No. 23, filed in Docket No. ER00-555, is made
effective.
Copies of this filing were served upon the Public Utilities
Commission of the State of California, the California Independent
System Operator (ISO), Pacific Gas and Electric Company, San
[[Page 131]]
Diego Gas & Electric Company, and the California ISO-registered
Scheduling Coordinators.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
25. Cinergy Services, Inc.
[Docket No. ER00-846-000]
Take notice that on December 17, 1999, Cinergy Services, Inc., on
behalf of PSI Energy, Inc. (PSI Energy), tendered for filing for
approval a Facilities Agreement dated as of December 1, 1999 and
entered into by and between Indianapolis Power & Light Company (IPL)
and PSI Energy.
The Facilities Agreement will allow PSI Energy to loop IPL's 345 kV
transmission line into PSI Energy's proposed 150 MVA 345/69 kV
Hortonville Tap Substation.
Cinergy states that it has served a copy of its filing upon the
Indiana Utility Regulatory Commission.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
26. The Detroit Edison Company
[Docket No. ER00-847-000]
Take notice that on December 17, 1999, The Detroit Edison Company
(Detroit Edison), tendered for filing an updated market power analysis.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
27. Duke Energy Corporation
[Docket No. ER99-2285-003
Take notice that on December 17, 1999, Duke Energy Corporation
submitted a compliance filing in the above-referenced docket.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
28. Allegheny Energy Service Corporation, on behalf of Monongahela
Power Company, The Potomac Edison Company and West Penn Power
Company (Allegheny Power)
[Docket No. ER00-842-000]
Take notice that on December 17, 1999, Allegheny Energy Service
Corporation on behalf of Monongahela Power Company, The Potomac Edison
Company and West Penn Power Company (Allegheny Power), tendered for
filing a second amended, fully executed Network Integration
Transmission Service Agreement with the Town of Front Royal, Virginia.
Allegheny Power states that this executed agreement replaces the
previously filed agreement approved by the Commission on January 12,
1999 in Docket Nos. ER98-3926-000, ER98-4357-000 and ER99-895-000. The
second amended agreement adds a delivery point for the Town of Front
Royal and makes editorial and conforming changes to the agreement.
The proposed effective date under this amended service agreement is
April 1, 2000, or such other date as it is permitted to become
effective by the Commission.
Copies of the filing have been provided to the Public Utilities
Commission of Ohio, the Pennsylvania Public Utility Commission, the
Maryland Public Service Commission, the Virginia State Corporation
Commission, the West Virginia Public Service Commission, and all
parties of record.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
29. PJM Interconnection, L.L.C.
[Docket No. ER00-870-000]
Take notice that on December 17, 1999, PJM Interconnection, L.L.C.
(PJM) on behalf of a majority of the Reliability Committee, filed a
Petition of PJM Interconnection, L.L.C. To Amend the Reliability
Assurance Agreement Among Load Serving Entities in the PJM Control
Area.
Comment date: January 7, 2000, in accordance with Standard
Paragraph E at the end of this notice.
30. Mid-Continent Area Power Pool
[Docket Nos. OA97-163-008, ER97-1162-007 and OA97-658-008]
Take notice that on December 16, 1999, the Mid-Continent Area Power
Pool (MAPP) tendered for filing its refund report pursuant to the
Commission's order in Mid-Continent Area Power Pool, 88 FERC para.
61,157 (1999), regarding refunds required under MAPP's Schedule F.
Comment date: January 7, 2000, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest such filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of practice
and procedure (18 CFR 385.211 and 385.214). All such motions or
protests should be filed on or before the comment date. Protests will
be considered by the Commission in determining the appropriate action
to be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of these filings are on file with the Commission and
are available for public inspection. This filing may also be viewed on
the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208-
2222 for assistance).
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-34012 Filed 12-30-99; 8:45 am]
BILLING CODE 6717-01-P