95-2180. Koch Gateway Pipeline Company; Request Under Blanket Authorization
[Federal Register Volume 60, Number 19 (Monday, January 30, 1995)]
[Notices]
[Page 5676]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-2180]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-167-000]
Koch Gateway Pipeline Company; Request Under Blanket
Authorization
January 24, 1995.
Take notice that on January 19, 1995, Koch Gateway Pipeline Company
(Koch Gateway), Post Office Box 1478, Houston, Texas 77251-1478, filed
in Docket No. CP95-167-000 a request pursuant to Sections 157.205 and
157.211 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205 and 157.211) for authorization to install a two-inch tap to
enable Koch Gateway to transport natural gas to Prior Energy
Corporation (Prior Energy) under Koch Gateway's ITS Rate Schedule. Koch
Gateway makes such request, under its blanket certificate issued in
Docket No. CP82-430-000 pursuant to Section 7 of the Natural Gas Act,
all as more fully set forth in the request that is on file with the
Commission and open to public inspection.
Koch Gateway states that it currently provides interruptible
transportation service to Prior Energy pursuant to Koch Gateway's
blanket transportation certificate and the ITS agreement filed with the
Commission in Docket No. ST94-6295. Specifically, Koch Gateway (as the
shipper and agent for Bush Construction's Glendale Asphalt Plant (Bush
Construction) is proposing to install a two-inch delivery tap and
appurtenant meter and regulator station on Koch Gateway's transmission
pipeline in Forrest County, Mississippi at an estimated cost of
$29,500, to provide service to Bush Construction, on behalf of Prior
Energy. It is averred that Bush Construction will construct
approximately .25 mile of two-inch pipeline to connect the meter
station to its plant. Koch Gateway further states that the volumes
proposed to be delivered to Prior Energy, 250 MMBtu average daily
volume and 400 MMBtu peak day) will be within Prior Energy's currently
effective entitlements.
It is stated that the estimated project cost of $29,500 will be
reimbursed by Prior Energy.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-2180 Filed 1-27-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/30/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-2180
- Pages:
- 5676-5676 (1 pages)
- Docket Numbers:
- Docket No. CP95-167-000
- PDF File:
-
95-2180.pdf