95-2232. Availability of Revised Implementation Plan for the Tritium Supply and Recycling Programmatic Environmental Impact Statement  

  • [Federal Register Volume 60, Number 19 (Monday, January 30, 1995)]
    [Notices]
    [Page 5660]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-2232]
    
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF ENERGY
    
    Availability of Revised Implementation Plan for the Tritium 
    Supply and Recycling Programmatic Environmental Impact Statement
    
    AGENCY: Department of Energy.
    
    ACTION: Notice of Availability.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Department of Energy (DOE) announces the availability of 
    the revised Implementation Plan for the Tritium Supply and Recycling 
    Programmatic Environmental Impact Statement (PEIS). The Implementation 
    Plan provides guidance for the preparation of the PEIS, records the 
    issues identified as a result of the public scoping process, and 
    provides information regarding the alternatives and issues to be 
    analyzed in the PEIS.
    
    ADDRESSES AND FURTHER INFORMATION: A copy of the Implementation Plan or 
    its Executive Summary may be obtained upon request to:
    
    Office of Reconfiguration, DP-25, U.S. Department of Energy, P.O. Box 
    3417, Alexandria, Virginia 22302, Attn: Implementation Plan,(202) 586-
    1300
    
        Requests for further information on the Tritium Supply and 
    Recycling proposal may be directed to the same office.
    
    SUPPLEMENTARY INFORMATION: On October 28, 1994, DOE published in the 
    Federal Register an update notice on the proposed Reconfiguration 
    program, announcing its intention to separate the Reconfiguration PEIS 
    into two separate PEIS's: a Tritium Supply and Recycling PEIS, and a 
    Stockpile Stewardship and Management PEIS [59 FR 54176]. A 30-day 
    public comment period followed that notice. The Tritium Supply and 
    Recycling Implementation Plan takes the comments received into account, 
    along with the comments received during a prior public scoping period 
    (July-October 1993).
        The Implementation Plan describes the scope of the Tritium Supply 
    and Recycling PEIS, including the siting and technology alternatives 
    related to tritium supply and recycling. Four technologies for tritium 
    supply will be assessed in the PEIS: Heavy Water Reactor, Modular High-
    Temperature Gas-Cooled Reactor (MHTGR), Advanced Light Water Reactor 
    (ALWR), and Accelerator Production of Tritium. Five sites for new 
    tritium supply facilities and tritium recycling facilities will also be 
    assessed: Idaho National Engineering Laboratory (Idaho Falls, Idaho); 
    Nevada Test Site (Las Vegas, Nevada); Pantex Plant (Amarillo, Texas); 
    Savannah River Site (Aiken, South Carolina); and the Oak Ridge 
    Reservation (Oak Ridge, Tennessee). Additionally, the PEIS will include 
    an analysis of the environmental impacts of the MHTGR and ALWR 
    technologies for tritium production together with plutonium disposition 
    and steam/electricity production. The PEIS will also analyze an 
    existing commercial light water reactor that would be purchased for 
    tritium production and withdrawn from commercial electricity 
    production.
        The Draft Tritium Supply and Recycling PEIS, which will include the 
    Department's preferred alternative, will be completed no later than 
    March 1, 1995. Following the publication of the Draft Tritium Supply 
    and Recycling PEIS, public hearings will be held, and a Final Tritium 
    Supply and Recycling PEIS is expected to be completed by October 1995. 
    Information on the public hearing locations, dates, and format will be 
    published in the Federal Register at least 30 days prior to the first 
    hearing.
    
        Signed in Washington, DC, this 24th day of January, 1994.
    Everet Beckner,
    Acting Assistant Secretary for Defense Programs.
    [FR Doc. 95-2232 Filed 1-27-95; 8:45 am]
    BILLING CODE 6450-01-P
    
    

Document Information

Published:
01/30/1995
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of Availability.
Document Number:
95-2232
Pages:
5660-5660 (1 pages)
PDF File:
95-2232.pdf