-
Start Preamble
BNSF Railway Company (BNSF) pursuant to a written trackage rights agreement entered into between BNSF and Union Pacific Railroad Company (UP) has agreed to grant temporary overhead trackage rights to UP over BNSF's line of railroad between Hobart Tower, CA (milepost 146.0), and Riverside, CA (milepost 9.8), a distance of approximately 57.7 miles.[1]
The transaction was scheduled to be consummated on January 16, 2006, but consummation could lawfully occur no earlier than January 17, 2006, the effective date of the exemption (7 days after the exemption was filed). The temporary trackage rights will expire on or about March 22, 2006. The purpose of the temporary trackage rights is to facilitate maintenance work on UP lines.
As a condition to this exemption, any employee affected by the acquisition of the temporary trackage rights will be protected by the conditions imposed in Norfolk and Western Ry. Co.—Trackage Rights—BN, 354 I.C.C. 605 (1978), as modified in Mendocino Coast Ry., Inc.—Lease and Operate, 360 I.C.C. 653 (1980), and any employee affected by the discontinuance of those trackage rights will be protected by the conditions set out in Oregon Short Line R. Co.—Abandonment—Goshen, 360 I.C.C. 91 (1979).
This notice is filed under 49 CFR 1180.2(d)(8). If it contains false or misleading information, the exemption is void ab initio. Petitions to revoke the exemption under 49 U.S.C. 10502(d) may be filed at any time. The filing of a petition to revoke will not automatically stay the transaction.
An original and 10 copies of all pleadings, referring to STB Finance Docket No. 34820, must be filed with the Surface Transportation Board, 1925 K Street, NW., Washington, DC 20423-0001. In addition, a copy of each pleading must be served on Gabriel S. Meyer, Assistant General Attorney, 1400 Douglas Street, STOP 1580, Omaha, NE 68179.
Board decisions and notices are available on our Web site at http://www.stb.dot.gov.
Start SignatureDecided: January 23, 2006.
By the Board, David M. Konschnik, Director, Office of Proceedings.
Vernon A. Williams,
Secretary.
Footnotes
1. Total mileage does not correspond to the milepost designations of the endpoints because the trackage rights involve BNSF subdivisions with non-contiguous mileposts.
Back to Citation[FR Doc. 06-761 Filed 1-27-06; 8:45 am]
BILLING CODE 4915-01-P
Document Information
- Published:
- 01/30/2006
- Department:
- Surface Transportation Board
- Entry Type:
- Notice
- Document Number:
- 06-761
- Pages:
- 4967-4967 (1 pages)
- Docket Numbers:
- STB Finance Docket No. 34820
- PDF File:
- 06-761.pdf