2014-01871. Warm Springs Irrigation District: Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Application for New License for a Major Water Project 5 Megawatts (MW) or Less—Existing Dam.

    b. Project No.: 13570-002.

    c. Date filed: April 15, 2013.

    d. Applicant: Warm Springs Irrigation District.

    e. Name of Project: Warm Springs Dam Hydroelectric Project.

    f. Location: On the Malheur River, near the Town of Juntura, Malheur County, Oregon. The project would utilize the existing Warm Springs dam and reservoir, which is owned by the U.S. Bureau of Reclamation (Reclamation) and would occupy 13.5 acres of land administered by the U.S. Bureau of Land Management.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: Mr. Randy Kinney, Warmsprings Irrigation District, 334 Main Street North, Vale, OR 97918, (541) 473-3951.

    i. FERC Contact: Ken Wilcox, (202) 502-6835; kenneth.wilcox@ferc.gov.

    j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.

    The Commission strongly encourages electronic filing. Please file filing motions to intervene and protests using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P-13570-002.

    The Commission's Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. This application has been accepted for filing, but is not ready for environmental analysis at this time.

    l. The proposed project would utilize the existing Reclamation's Warm Springs Dam and reservoir, and would consist of the following new facilities: (1) A new steel liner fitted into one of the outlets; (2) new trashrack at the entrance to the existing outlet works; (3) a 3.5-foot-long, 6-to-8-foot-diameter steel increaser section attached to the liner to transition the outlet into an 8-foot-diameter steel penstock; (4) a 150-foot-long increaser/penstock assembly to convey water to the new powerhouse located in the stilling basin below the dam; (5) a new 4-foot-diameter fixed cone bypass valve upstream of the powerhouse; (6) a 150-foot-long, 8-foot-diameter steel penstock; (7) a powerhouse containing one 2.7-MW Francis or Kaplan turbine; (8) a 2.2-mile-long, 25-kilovolt transmission line; and (9) appurtenant facilities. The average annual generation is estimated to be 7.442 gigawatt-hours.

    m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.

    You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice.

    A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice.

    Anyone may submit a protest or a motion to intervene in accordance with Start Printed Page 4897the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.

    When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions.

    All filings must (1) bear in all capital letters the title “PROTEST” or “MOTION TO INTERVENE,” “NOTICE OF INTENT TO FILE COMPETING APPLICATION,” or “COMPETING APPLICATION;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.

    Start Signature

    Dated: January 24, 2014.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2014-01871 Filed 1-29-14; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
01/30/2014
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2014-01871
Pages:
4896-4897 (2 pages)
Docket Numbers:
Project No. 13570-002
PDF File:
2014-01871.pdf