2018-01788. Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
-
Start Preamble
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: Extension of time request.
b. Project No.: 2444-028.
c. Date Filed: December 8, 2017, and supplemented January 12, 2018.
d. Applicant: Northern States Power Company.
e. Name of Project: White River Hydroelectric Project.
f. Location: The project is located on the White River in Ashland County, Wisconsin.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. William P. Zawacki, Director of Hydro Plants, 1414 W. Hamilton Ave., P.O. Box 8, Eau Claire, WI 54702, (715) 737-1136.
i. FERC Contact: Steven Sachs, (202) 502-8666, Steven.Sachs@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-2444-028.
k. Description of Request: The applicant requests an extension until January 31, 2021 to continue operating the project under the temporarily amended Reservoir Operating Plan. The amended plan allows the applicant to operate the reservoir up to an elevation of 712.6 feet above mean sea level, or one foot above the normally required maximum elevation. The applicant has been allowed to operate with the higher reservoir elevation since August 1, 2016 due to a turbine failure, which limited operational flexibility. At the end of the extended period, the applicant would return to the previously required elevation or request that the temporary amendment be made permanent.
l. Locations of the Applications: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502-8371. The filing may also be viewed on the Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Motions to Intervene, or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, MOTION TO INTERVENE, or PROTEST as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the Start Printed Page 4193requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the temporary variance request. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Start SignatureDated: January 23, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-01788 Filed 1-29-18; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 01/30/2018
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2018-01788
- Pages:
- 4192-4193 (2 pages)
- Docket Numbers:
- P-2444-028
- PDF File:
- 2018-01788.pdf