E5-341. Notice of Application for Surrender of License and Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble January 19, 2005.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Application Type: Surrender of License.

    b. Project No.: 8535-039.

    c. Date filed: December 20, 2004.

    d. Licensee: Virginia Hydrogeneration and Historical Society, LC.

    e. Name of Project: Battersea Dam.

    f. Location: Located on the Appomattox River, in Chesterfield and Dinwiddie Counties, Virginia.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

    h. Licensee Contact: Paul V. Nolan, Esq., 5515 North 17th Street, Arlington, Virginia 22205, (703) 534-5509.

    i. FERC Contact: Regina Saizan, (202) 502-8765.

    j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, and recommendations for terms and conditions.

    k. Deadline for filing responsive documents: comments, motions to intervene, protests, and recommendations for terms and conditions concerning the application shall be filed with the Commission by February 22, 2005. All reply comments must be filed with the Commission by March 7, 2005.

    Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. The Commission strongly encourages electronic filings.

    The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, the intervenor must also serve a copy of the document on that resource agency.

    l. Description of Proposed Action: The licensee seeks to surrender the license because its lease of the project lands and facilities has been cancelled and it does not have the means or the intent to reacquire the project lands and to operate the project. The 500 kilowatt project is currently not operating.

    m. Locations of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number, here P-8535, in the docket number field to access the document. For assistance, call toll-free 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h. above.

    n. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    p. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “REPLY COMMENTS”, “RECOMMENDATIONS FOR TERMS AND CONDITIONS”, “PROTEST”, OR “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and eight copies to: Magalie Start Printed Page 4844R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to the Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

    q. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If any agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

    Start Signature

    Magalie R. Salas,

    Secretary.

    End Signature End Preamble

    [FR Doc. E5-341 Filed 1-28-05; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
01/31/2005
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
The licensee seeks to surrender the license because its lease of the project lands and facilities has been cancelled and it does not have the means or the intent to reacquire the project lands and to operate the project. The 500 kilowatt project is currently not operating.
Document Number:
E5-341
Pages:
4843-4844 (2 pages)
EOCitation:
of 2005-01-19
PDF File:
e5-341.pdf