-
Start Preamble
AGENCY:
Surface Transportation Board, DOT.
ACTION:
Proposed adoption of a Railroad Cost Recovery Procedures-productivity adjustment.
SUMMARY:
The Surface Transportation Board proposes to adopt 1.019 (1.9%) as the measure of average change in railroad productivity for the 2000-2004 (5-year) averaging period. This value is a decline of 1% from the current measure of 2.9% that was developed for the 1999-2003 period.
DATES:
Comments are due February 15, 2006.
Effective Date: The proposed productivity adjustment is effective March 1, 2006.
ADDRESSES:
Send comments (an original and 10 copies) referring to STB Ex Parte No. 290 (Sub-No. 4) to: Surface Transportation Board, 1925 K Street, NW., Washington, DC 20423-0001.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
H. Jeff Warren, (202) 565-1533. [Federal Information Relay Service (FIRS) for the hearing impaired: 1-800-877-8339.]
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Additional information is contained in the Board's decision, which is available on our Web site http://www.stb.dot.gov. To purchase a copy of the full decision, write to, e-mail or call the Board's contractor, ASAP Document Solutions; 9332 Annapolis Rd., Suite 103, Lanham, MD 20706; e-mail: asapdc@verizon.net; phone: (202) 306-4004. [Assistance for the hearing impaired is available through FIRS: 1-800-877-8339.]
This action will not significantly affect either the quality of the human environment or energy conservation.
Pursuant to 5 U.S.C. 605(b), we conclude that our action will not have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act.
Start SignatureDecided: January 23, 2006.
By the Board, Chairman Buttrey, and Vice Chairman Mulvey.
Vernon A. Williams,
Secretary.
[FR Doc. E6-1187 Filed 1-30-06; 8:45 am]
BILLING CODE 4915-01-P
Document Information
- Published:
- 01/31/2006
- Department:
- Surface Transportation Board
- Entry Type:
- Notice
- Action:
- Proposed adoption of a Railroad Cost Recovery Procedures- productivity adjustment.
- Document Number:
- E6-1187
- Dates:
- Comments are due February 15, 2006.
- Pages:
- 5117-5117 (1 pages)
- Docket Numbers:
- STB Ex Parte No. 290 (Sub-No. 4)
- PDF File:
- e6-1187.pdf