00-256. Drawbridge Operation Regulations: Passaic River, NJ  

  • [Federal Register Volume 65, Number 3 (Wednesday, January 5, 2000)]
    [Rules and Regulations]
    [Pages 353-354]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 00-256]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD01-99-206]
    
    
    Drawbridge Operation Regulations: Passaic River, NJ
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of temporary deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Commander, First Coast Guard District, has issued a 
    temporary deviation from the drawbridge operation regulations for the 
    NJTRO Newark-Harrison (Morristown Line) Bridge, mile 5.8, across the 
    Passaic River between Newark and Harrison, New Jersey. This deviation 
    from the regulations allows the bridge owner to keep the bridge in the 
    closed position from 2 a.m. on January 7, 2000, to 2 a.m. on January 9, 
    2000. This action is necessary to facilitate mechanical repairs at the 
    bridge.
    
    DATES: This deviation is effective January 7, 2000, through January 9, 
    2000.
    
    FOR FURTHER INFORMATION CONTACT: Judy Yee, Project Officer, First Coast 
    Guard District, at (212) 668-7165.
    
    SUPPLEMENTARY INFORMATION: The NJTRO Newark-Harrison (Morristown Line) 
    Bridge, mile 5.8, across the Passaic River between Newark and Harrison, 
    New Jersey, has a vertical clearance of 15 feet at mean high water, and 
    20 feet at mean low water in the closed position. The bridge owner, New 
    Jersey Transit, requested a temporary deviation from the operating 
    regulations to facilitate mechanical repairs at the bridge. The 
    existing operating regulations listed at 33 CFR 117. 739(g) require the 
    bridge to open on signal, if at least a one-hour advance notice is 
    given to the drawtender at the Upper Hack Bridge. An additional half-
    hour delay in opening is permitted if the drawtender is not at the 
    Upper Hack Bridge and at the Lower Hack Bridge. From 7:15 a.m. to 9 
    a.m. and from 4:30 p.m. to 6:50 p.m., Monday through Friday, except 
    federal holidays, the draw need not open for vessel traffic.
        This deviation to the operating regulations allows the owner of the 
    NJTRO Newark-Harrison (Morristown Line) Bridge to keep the bridge in 
    the closed position from 2 a.m. on January 7, 2000, through 2 a.m. on 
    January 9, 2000. Vessels that can pass under the bridge without an 
    opening may do so at all times.
        In accordance with 33 CFR 117.35(c), this work will be performed 
    with all due
    
    [[Page 354]]
    
    speed in order to return the bridge to normal operation as soon as 
    possible. This deviation from the operating regulations is authorized 
    under 33 CFR 117.35.
    
        Dated: December 17, 1999.
    R.M. Larrabee,
    Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
    [FR Doc. 00-256 Filed 1-3-00; 1:12 pm]
    BILLING CODE 4910-15-M
    
    
    

Document Information

Effective Date:
1/7/2000
Published:
01/05/2000
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
00-256
Dates:
This deviation is effective January 7, 2000, through January 9, 2000.
Pages:
353-354 (2 pages)
Docket Numbers:
CGD01-99-206
PDF File:
00-256.pdf
CFR: (1)
33 CFR 117