[Federal Register Volume 63, Number 3 (Tuesday, January 6, 1998)]
[Notices]
[Pages 560-561]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-243]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-5947-5]
Agency Information Collection Activities: Submission for OMB
Review; Comment Request; Notice of Intent for Storm Water Discharges
Associated With Construction Activity Under a NPDES General Permit
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501
et seq.), this notice announces that the following Information
Collection Request (ICR) has been forwarded to the Office of Management
and Budget (OMB) for review and approval: Notice of Intent for Storm
Water Discharges Associated with Construction Activity under a NPDES
General Permit. The ICR describes the nature of the information
collection and its expected burden and cost; where appropriate, it
includes the actual data collection instrument.
DATES: Comments must be submitted on or before February 5, 1998.
FOR FURTHER INFORMATION OR A COPY: Contact Sandy Farmer at EPA by phone
at (202) 260-2740, by email at farmer.sandy@epamail.epa.gov, or
download off the Internet at http://www.epa.gov/icr/icr.htm and refer
to EPA ICR No. 1842.01.
SUPPLEMENTARY INFORMATION:
Title: Notice of Intent for Storm Water Discharges Associated with
Construction Activity under a NPDES General Permit. This is a new
collection. (EPA ICR No. 1842.01).
Abstract: This Information Collection Request (ICR) calculates the
burden and costs associated with the preparation of the Notice of
Intent (NOI) for Storm Water Discharges Associated with Construction
Activity under a NPDES General Permit. EPA uses the data contained in
the NOIs to track facilities covered by the storm water general permit
and assess permit compliance. EPA has developed a format for
construction NOIs. The standardized one-page form is called: Notice of
Intent (NOI) for Storm Water Discharges Associated with Construction
Activity Under a NPDES General Permit. This form is a revision of an
existing form entitled, ``NOI for Storm Water Discharges Associated
with Industrial Activity Under a NPDES General Permit.'' The following
information is requested (the questions that are on the new NOI which
are not on the existing NOI are indicated by asterisks at the end of
the item):
Name, address, phone number of the facility.
Status of the owner/operator (whether federal, state,
public, or private).
Name and location of the project (City, State, ZIP,
Latitude, Longitude, County*).
Whether the facility is located on Indian Country Lands.
Whether a Storm Water Pollution Prevention Plan (SWPPP)
has been prepared*.
Optional: location for viewing SWPPP and telephone number
for scheduling viewing times: Address, City, State, ZIP*.
The name of the receiving water.
Estimated construction start date and completion date.
The estimated area to be disturbed (to nearest acre).
An estimate of the likelihood of a discharge*.
Whether any protected species or critical habitat in the
project area.
Which section of Part I.B.3.e.(2) of the permit through
which permit eligibility with regard to protection of endangered
species is satisfied.
Whether any historic properties in the project area.
Which section of Part I.B.3.f.(2) of the permit through
which permit eligibility with regard to protection of historic
properties is satisfied.
Responses are required to obtain coverage under the NPDES
General
[[Page 561]]
Permit for storm water discharges associated with construction
activities. An agency may not conduct or sponsor, and a person is not
required to respond to, a collection of information unless it displays
a currently valid OMB control number. The OMB control numbers for EPA's
regulations are listed in 40 CFR Part 9 and 48 CFR Chapter 15. The
Federal Register Notice required under 5 CFR 1320.8(d), soliciting
comments on this collection of information was published on June 2,
1997 (62 FR 29826); no comments were received.
Burden Statement: The annual public reporting and recordkeeping
burden for this collection of information is estimated to average 3.7
hours per response. Burden means the total time, effort, or financial
resources expended by persons to generate, maintain, retain, or
disclose or provide information to or for a Federal agency. This
includes the time needed to review instructions; develop, acquire,
install, and utilize technology and systems for the purposes of
collecting, validating, and verifying information, processing and
maintaining information, and disclosing and providing information;
adjust the existing ways to comply with any previously applicable
instructions and requirements; train personnel to be able to respond to
a collection of information; search data sources; complete and review
the collection of information; and transmit or otherwise disclose the
information.
Respondents/Affected Entities: Owners/Operators of construction
activities.
Estimated Number of Respondents: 13,632.
Frequency of Response: For each construction start.
Estimated Total Annual Hour Burden: 3.7 hours.
Estimated Total Annualized Cost Burden: $3,646,741.
Send comments on the Agency's need for this information, the
accuracy of the provided burden estimates, and any suggested methods
for minimizing respondent burden, including through the use of
automated collection techniques to the following addresses. Please
refer to EPA ICR No.1842.01 in any correspondence.
Ms. Sandy Farmer, U.S. Environmental Protection Agency, OPPE Regulatory
Information Division (2137), 401 M Street, SW, Washington, DC 20460.
and
Office of Information and Regulatory Affairs, Office of Management and
Budget, Attention: Desk Officer for EPA, 725 17th Street, NW,
Washington, DC 20503.
Dated: December 30, 1997.
Joseph Retzer,
Director, Regulatory Information Division.
[FR Doc. 98-243 Filed 1-5-98; 8:45 am]
BILLING CODE 6560-50-P