98-396. Alta Power Generation, L.L.C.; Notice of Application for Determination of Exempt Wholesale Generator Status  

  • [Federal Register Volume 63, Number 5 (Thursday, January 8, 1998)]
    [Notices]
    [Page 1101]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-396]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG98-26-000]
    
    
    Alta Power Generation, L.L.C.; Notice of Application for 
    Determination of Exempt Wholesale Generator Status
    
    January 2, 1998.
        Take notice that on December 23, 1997, Alta Power Generation, 
    L.L.C. (Alta Power), with its principal office at c/o Houston 
    Industries Power Generation, Inc., 1111 Louisiana, 16th Floor, Houston, 
    TX 77002, filed with the Federal Energy Regulatory Commission 
    (Commission) an application for determination of exempt wholesale 
    generator status pursuant to Part 365 of the Commission's Regulations. 
    Alta Power states that it is a wholly owned subsidiary of Houston 
    Industries Power Generation, Inc., and an indirect subsidiary of 
    Houston Industries Incorporated. Alta Power has acquired the Cool Water 
    Generating Station in Daggett, California at auction from Southern 
    California Edison. Alta Power states that it will be engaged directly, 
    or indirectly through one or more affiliates, as defined in Section 
    2(a)(11)(B) of PUHCA, and exclusively in the business of owning and/or 
    operating, an interest in an eligible facility and selling electric 
    energy at wholesale.
        Any person desiring to be heard concerning the application for 
    exempt wholesale generator status should file a motion to intervene or 
    comments with the Federal Energy Regulatory Commission, 888 First 
    Street, N.E., Washington, D.C. 20426, in accordance with Sections 
    385.211 and 385.214 of the Commission's Rules of Practice and 
    Procedure. The Commission will limit its consideration of comments to 
    those that concern the adequacy or accuracy of the application. All 
    such motions and comments should be filed on or before January 23, 
    1998, and must be served on Applicant. Any person wishing to become a 
    party must file a motion to intervene. Copies of this filing are on 
    file with the Commission and are available for public inspection.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-396 Filed 1-7-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/08/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-396
Pages:
1101-1101 (1 pages)
Docket Numbers:
Docket No. EG98-26-000
PDF File:
98-396.pdf