99-341. Steuben Gas Storage Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 64, Number 5 (Friday, January 8, 1999)]
[Notices]
[Pages 1191-1192]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-341]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-128-000]
Steuben Gas Storage Company; Notice of Request Under Blanket
Authorization
January 4, 1999.
Take notice that on December 21, 1998, Steuben Gas Storage Company
(Steuben), 500 Renaissance Center, Detroit, Michigan 48243, filed a
prior notice request with the Commission in Docket No. CP99-128-000
pursuant to Section 157.205 of the Commission's Regulations under the
Natural Gas Act (NGA) for authorization to increase the natural gas
volumes and increase the maximum stabilized reservoir pressure at the
Adrian gas storage field in Steuben County, New York, under Steuben's
blanket certificate issued in Docket No. CP96-119-000, et al., pursuant
to Section 7 of the NGA, all as more fully set forth in the request
which is open to the public for inspection.
Steuben proposes to increase the maximum volume of natural gas
authorized to be stored in the Adrian gas storage field from 8,200 MMcf
to 8,500 MMcf and to increase the maximum stabilized reservoir pressure
from 2,188 psia to 2,202 psia. Steuben states that it would not
construct any new facilities in this proposal. Steuben also states that
it is now apparent that
[[Page 1192]]
the Adrian gas storage field's pore volume, and thus, its storage
capacity is slightly greater than was previously estimated and
certificated by the Commission in docket No. CP89-1684-000. Steuben
further states that rounding up to a new maximum inventory of 8,500
MMcf would require a slight increase in the certificated maximum
pressure.
Any person or the Commission's staff may, within 45 days after the
commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the NGA (18 CFR 157.205) a protest to the request. If
no protest is filed within the allowed time, the proposed activity
shall be deemed to be authorized effective the day after the time
allowed for filing a protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant
request shall be treated as an application for authorization pursuant
to Section 7 of the NGA.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-341 Filed 1-7-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/08/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-341
- Pages:
- 1191-1192 (2 pages)
- Docket Numbers:
- Docket No. CP99-128-000
- PDF File:
-
99-341.pdf