99-341. Steuben Gas Storage Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 64, Number 5 (Friday, January 8, 1999)]
    [Notices]
    [Pages 1191-1192]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-341]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-128-000]
    
    
    Steuben Gas Storage Company; Notice of Request Under Blanket 
    Authorization
    
    January 4, 1999.
        Take notice that on December 21, 1998, Steuben Gas Storage Company 
    (Steuben), 500 Renaissance Center, Detroit, Michigan 48243, filed a 
    prior notice request with the Commission in Docket No. CP99-128-000 
    pursuant to Section 157.205 of the Commission's Regulations under the 
    Natural Gas Act (NGA) for authorization to increase the natural gas 
    volumes and increase the maximum stabilized reservoir pressure at the 
    Adrian gas storage field in Steuben County, New York, under Steuben's 
    blanket certificate issued in Docket No. CP96-119-000, et al., pursuant 
    to Section 7 of the NGA, all as more fully set forth in the request 
    which is open to the public for inspection.
        Steuben proposes to increase the maximum volume of natural gas 
    authorized to be stored in the Adrian gas storage field from 8,200 MMcf 
    to 8,500 MMcf and to increase the maximum stabilized reservoir pressure 
    from 2,188 psia to 2,202 psia. Steuben states that it would not 
    construct any new facilities in this proposal. Steuben also states that 
    it is now apparent that
    
    [[Page 1192]]
    
    the Adrian gas storage field's pore volume, and thus, its storage 
    capacity is slightly greater than was previously estimated and 
    certificated by the Commission in docket No. CP89-1684-000. Steuben 
    further states that rounding up to a new maximum inventory of 8,500 
    MMcf would require a slight increase in the certificated maximum 
    pressure.
        Any person or the Commission's staff may, within 45 days after the 
    commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-341 Filed 1-7-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/08/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-341
Pages:
1191-1192 (2 pages)
Docket Numbers:
Docket No. CP99-128-000
PDF File:
99-341.pdf