99-350. Panhandle Eastern Pipe Line Company; Notice of Proposed Changes in FERC Gas Tariff
[Federal Register Volume 64, Number 5 (Friday, January 8, 1999)]
[Notices]
[Page 1191]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-350]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP99-192-000]
Panhandle Eastern Pipe Line Company; Notice of Proposed Changes
in FERC Gas Tariff
January 4, 1999.
Take notice that on December 23, 1998, Panhandle Eastern Pipe Line
Company (Panhandle) tendered for filing as part of its FERC Gas Tariff,
First Revised Volume No. 1, the tariff sheets listed on Appendix A
attached to the filing, to be effective January 23, 1999.
Panhandle states that the purpose of this filing, made in
accordance with the provisions of Section 154.204 of the Commission's
Regulations, is to reduce the notice period from 15 days to 5 business
days for firm shippers to request changes in their primary points of
receipt and delivery and to make other housekeeping changes to reflect
clarifications or correct inadvertent omissions. Based on shipper
requests and Panhandle's improved administrative process, Panhandle is
able to reduce the processing time for firm shippers to request changes
in primary points of receipt and delivery. Shippers will be allowed to
request such changes twice in any thirty day period giving them
additional flexibility to manage their needs.
Panhandle further states that clarifications are needed in two rate
schedules. These clarifications do not change the characteristics of
the service or the current administration of the rate schedules. The
revised tariff sheets clarify Rate Schedule SCT to provide that the
transmission charge applies only up to shipper's MDCQ and modify Rate
Schedule FS to correct the date by which a shipper must reduce its
storage quantity to 20% of the Maximum Stored Quantity from April 1,
the end of the traditional withdrawal cycle, to the end of the
withdrawal period specified in the service agreement. The flexibility
of Rate Schedule FS allows shippers to select non-traditional injection
and withdrawal cycles. Further housekeeping changes revise Section
2.4(f) of the General Terms and Conditions to clarify the information
available on the electronic bulletin board relating to the current
posting requirements of Order 566 and to correct references.
Panhandle states that a copy of this filing is available for public
inspection during regular business hours at Panhandle's office at 5400
Westheimer Court, Houston, Texas 77056-5310. In addition, copies of
this filing are being served on all affected customers and applicable
state regulatory agencies.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or a protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Sections 385.214 or 385.211 of the Commission's Rules
and Regulations. All such motions or protests must be filed in
accordance with Section 154.210 of the Commission's Regulations.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceedings. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection in the Public
Reference Room.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-350 Filed 1-7-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/08/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-350
- Pages:
- 1191-1191 (1 pages)
- Docket Numbers:
- Docket No. RP99-192-000
- PDF File:
-
99-350.pdf