  • [Federal Register Volume 63, Number 6 (Friday, January 9, 1998)]
    [Notices]
    [Page 1449]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-507]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-164-000]
    
    
    Koch Gateway Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    January 5, 1998.
        Take notice that on December 29, 1997, Koch Gateway Pipeline 
    Company (KGPC), P.O. Box 1478, Houston, Texas 77251-1478, filed in 
    Docket No. CP98-164-000 a request pursuant to Sections 157.205 and 
    157.212 of the Commission's Regulations under the Natural Gas Act (18 
    CFR 157.205 and 157.212) for approval to modify an existing receipt 
    point meter station into a bi-directional point serving Riveria 
    Utilities, Inc. (Riveria), a local distribution company, under KGPC's 
    blanket certificate issued in Docket No. CP82-430-000, pursuant to 
    Section 7(c) of the Natural Gas Act (NGA), all as more fully set forth 
    in the request which is on file with the commission and open to public 
    inspection.
        KGPC states that it proposes to reverse one meter tube at an 
    existing dual four-inch meter station on KGPC's lateral line, 
    designated as Index 301-8 in Baldwin County, Alabama. KGPC asserts that 
    the volumes of natural gas proposed to be delivered to Riveria will 
    remain within its current certificated entitlement. KGPC further 
    asserts that the activities proposed herein will have no effect on 
    KGPC's ability to serve its other existing customers.
        Any person or the Commission's Staff may, within 45 days of the 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214), a motion to intervene and pursuant to Section 157.205 of the 
    regulations under the Natural Gas Act (18 CFR 157.205), a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activities shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn 30 days after the time allowed for filing a protest, 
    the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-507 Filed 1-8-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/09/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-507
Pages:
1449-1449 (1 pages)
Docket Numbers:
Docket No. CP98-164-000
PDF File:
98-507.pdf