98-507. Koch Gateway Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 6 (Friday, January 9, 1998)]
[Notices]
[Page 1449]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-507]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-164-000]
Koch Gateway Pipeline Company; Notice of Request Under Blanket
Authorization
January 5, 1998.
Take notice that on December 29, 1997, Koch Gateway Pipeline
Company (KGPC), P.O. Box 1478, Houston, Texas 77251-1478, filed in
Docket No. CP98-164-000 a request pursuant to Sections 157.205 and
157.212 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205 and 157.212) for approval to modify an existing receipt
point meter station into a bi-directional point serving Riveria
Utilities, Inc. (Riveria), a local distribution company, under KGPC's
blanket certificate issued in Docket No. CP82-430-000, pursuant to
Section 7(c) of the Natural Gas Act (NGA), all as more fully set forth
in the request which is on file with the commission and open to public
inspection.
KGPC states that it proposes to reverse one meter tube at an
existing dual four-inch meter station on KGPC's lateral line,
designated as Index 301-8 in Baldwin County, Alabama. KGPC asserts that
the volumes of natural gas proposed to be delivered to Riveria will
remain within its current certificated entitlement. KGPC further
asserts that the activities proposed herein will have no effect on
KGPC's ability to serve its other existing customers.
Any person or the Commission's Staff may, within 45 days of the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214), a motion to intervene and pursuant to Section 157.205 of the
regulations under the Natural Gas Act (18 CFR 157.205), a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activities shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-507 Filed 1-8-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/09/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-507
- Pages:
- 1449-1449 (1 pages)
- Docket Numbers:
- Docket No. CP98-164-000
- PDF File:
-
98-507.pdf