Start Preamble
AGENCY:
Coast Guard, DOT.
ACTION:
Temporary rule.
SUMMARY:
The Commander, Eighth Coast Guard District is temporarily changing the regulation governing the Illinois Central Railroad Drawbridge, Mile 579.9, Upper Mississippi River. From 12:01 a.m., December 27, 2001, until 9 a.m., March 11, 2002, the drawbridge shall open on signal if at least 24 hours advance notice is given. Start Printed Page 1096This change is necessary to perform annual maintenance and repair on the bridge.
DATES:
This rule is effective from 12:01 a.m. Central Standard Time on December 27, 2001, to 9 a.m. Central Standard Time on March 11, 2002.
ADDRESSES:
Documents indicated in this preamble as being available in the docket, are part of docket CGD08-01-045 and are available for inspection or copying at room 2.107f in the Robert A. Young Federal Building at Eighth Coast Guard District, Bridge Branch, 1222 Spruce Street, St. Louis, MO 63103-2832, between 7 a.m. and 4 p.m., Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Mr. Roger K. Wiebusch, Bridge Administrator, Eighth Coast Guard District, Bridge Branch at (314) 539-3900, extension 378.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Regulatory Information
We did not publish a notice of proposed rulemaking (NPRM) for this regulation. Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing an NPRM.
Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register. This rule is being promulgated without an NPRM due to the short time frame allowed between the submission of the request by the Canadian National/Illinois Central Railroad Company and the date of requested closure. The Coast Guard received the Canadian National/Illinois Central Railroad Company's request on 6 November 2001. Winter conditions on the Upper Mississippi River coupled with the closure of Army Corps of Engineer's Lock No. 24 (Mile 273.4 UMR) until March 2, 2002 and Lock No. 12 (Mile 556.7) until March 11, 2002, will preclude any significant navigation demands for the drawspan opening. This temporary change to the drawbridge's operation has been coordinated with the commercial waterway operators. No objections were raised.
Background and Purpose
On November 6, 2001, the Canadian National/Illinois Central Railroad Company requested a temporary change to the Operation of the Illinois Central Railroad swing bridge across the Upper Mississippi River, Mile 579.9 at Dubuque, Iowa. Canadian National/Illinois Central Railroad Company requested that navigation temporarily provide 24 hours advance notice for bridge operation to facilitate required bridge maintenance during the winter months.
The Illinois Central Railroad Drawbridge navigation span has a vertical clearance of 19.9 feet above normal pool in the closed-to-navigation position. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. Presently, the draw opens on signal for passage of river traffic. The Canadian National/Illinois Central Railroad Company requested the drawbridge be permitted to remain closed-to-navigation from 12:01 a.m., December 27, 2001, until 9 a.m., March 11, 2002 unless 24 hours advance notice is given of the need for it to open. Winter conditions on the Upper Mississippi River coupled with the closure of Army Corps of Engineer's Lock No. 24 (Mile 273.4 UMR) until March 2, 2002 and Lock No. 12 (Mile 556.7) until March 11, 2002, will preclude any significant navigation demands for the drawspan opening. The Illinois Central Railroad Drawbridge, Mile 579.9 Upper Mississippi River, is located upstream from Lock 24. Performing maintenance on the bridge during the winter, when the number of vessels likely to be impacted is minimal, is preferred to bridge closures or advance notification requirements during the commercial navigation season. This temporary change to the drawbridge's operation has been coordinated with the commercial waterway operators. No objections were raised.
Regulatory Evaluation
This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Transportation (DOT) (44 FR 11040, February 26, 1979).
The Coast Guard expects the economic impact of the temporary rule to be so minimal that a full Regulatory Evaluation under paragraph 10(e) of the regulatory policies and procedures of DOT is unnecessary. This is because river traffic will be extremely limited by lock closures and ice during this period.
Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.
The Coast Guard certifies under 5 U.S.C. 605 (b) that this rule will not have a significant economic impact on a substantial number of small entities.
Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L 104-121), we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process. Any individual that qualifies or, believes he or she qualifies as a small entity and requires assistance with the provisions of this rule, may contact Mr. Roger K. Wiebusch, Bridge Administrator, Eighth Coast Guard District, Bridge Branch, at (314) 539-3900, extension 378.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247).
Collection of Information
This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.
Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the Start Printed Page 1097aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
Taking of Private Property
This rule will not affect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.
Protection of Children
We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children.
Indian Tribal Governments
This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.
Energy Effects
We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. It has not been designated by the Administrator of the Office of Information and Regulatory Affairs as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.
Environment
We have considered the environmental impact of this rule and concluded that under figure 2-1, paragraph (32)(e), of Commandant Instruction M16475.1 (series), this rule is categorically excluded from further environmental documentation. Promulgation of changes to drawbridge regulations has been found not to have significant effect on the human environment. A “Categorical Exclusion Determination” is available in the docket for inspection or copying where indicated under ADDRESSES.
Start List of SubjectsList of Subjects in 33 CFR Part 117
- Bridges
For the reasons discussed in the preamble, the Coast Guard amends 33 CFR Part 117 as follows:
End Amendment Part Start PartPART 117—DRAWBRIDGE OPERATION REGULATIONS
End Part Start Amendment Part1. The authority citation for Part 117 continues to read as follows:
End Amendment Part Start Amendment Part2. From 12:01 a.m., December 27, 2001, through 9 a.m., March 11, 2002, § 117.T408 is added to read as follows:
End Amendment PartUpper Mississippi River.From 12:01 a.m., December 27, 2001 through 9 a.m., March 11, 2002, the drawspan of the Illinois Central Railroad Drawbridge, mile 579.9, requires 24 hours advance notice for bridge operation.
Dated: December 27, 2001.
Roy J. Casto,
Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District.
[FR Doc. 02-504 Filed 1-8-02; 8:45 am]
BILLING CODE 4910-15-P
Document Information
- Effective Date:
- 12/27/2001
- Published:
- 01/09/2002
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Temporary rule.
- Document Number:
- 02-504
- Dates:
- This rule is effective from 12:01 a.m. Central Standard Time on December 27, 2001, to 9 a.m. Central Standard Time on March 11, 2002.
- Pages:
- 1095-1097 (3 pages)
- Docket Numbers:
- CGD08-01-045
- RINs:
- 2115-AE47: Drawbridge Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/2115-AE47/drawbridge-regulations
- Topics:
- Bridges
- PDF File:
- 02-504.pdf
- CFR: (1)
- 33 CFR 117.T408