2012-23983. Approval and Promulgation of Air Quality Implementation Plans; Ohio; PBR and PTIO  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Proposed rule.

    SUMMARY:

    EPA is proposing to approve six Permit-by-Rule provisions, a Permit to Install and Operate program, two permanent exemptions from the Permit to Install requirement and a general permit program as additions to Ohio's State Implementation Plan under the Clean Air Act. The Ohio Environmental Protection Agency has requested these rule revisions to make its air pollution permit program more efficient. Approving these additions will make the Permits by Rule, Permits to Install and Operate and general permits federally enforceable. Because these rule revisions will make Ohio's air permit program more efficient while continuing to protect human health and the environment, EPA is taking direct final action to approve the revisions.

    DATES:

    Comments must be received on or before October 31, 2012.

    ADDRESSES:

    Submit your comments, identified by Docket ID No. EPA-R05-OAR-2007-1102; EPA-R05-OAR-2008-0782, by one of the following methods:

    1. www.regulations.gov: Follow the on-line instructions for submitting comments.

    2. Email: gupta.kaushal@epa.gov.

    3. Fax: (312) 697-2009.

    4. Mail: Kaushal Gupta, Environmental Engineer, Air Permits Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, 77 West Jackson Boulevard, Chicago, Illinois 60604.

    5. Hand Delivery: Kaushal Gupta, Environmental Engineer, Air Permits Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, 77 West Jackson Boulevard, Chicago, Illinois 60604. Such deliveries are only accepted during the Regional Office normal hours of operation, and special arrangements should be made for deliveries of boxed information. The Regional Office official hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m., excluding Federal holidays.

    Please see the direct final rule which is located in the Rules section of this Federal Register for detailed instructions on how to submit comments.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Kaushal Gupta, Environmental Engineer, Air Permits Section, Air Programs Branch (AR-18J), Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604, (312) 886-6803, gupta.kaushal@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this rule, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time. Please note that if EPA receives adverse comment on an amendment, paragraph, or section of this rule and if that provision may be severed from the remainder of the rule, EPA may adopt as final those provisions of the rule that are not the subject of an adverse comment. For additional information, see the direct final rule which is located in the Rules section of this Federal Register.

    Start Signature

    Dated: July 20, 2012.

    Susan Hedman,

    Regional Administrator, Region 5.

    End Signature End Supplemental Information

    [FR Doc. 2012-23983 Filed 9-28-12; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Comments Received:
0 Comments
Published:
10/01/2012
Department:
Environmental Protection Agency
Entry Type:
Proposed Rule
Action:
Proposed rule.
Document Number:
2012-23983
Dates:
Comments must be received on or before October 31, 2012.
Pages:
59879-59879 (1 pages)
Docket Numbers:
EPA-R05-OAR-2007-1102, EPA-R05-OAR-2008-0782, FRL-9714-6
PDF File:
2012-23983.pdf
Supporting Documents:
» Ohio PBR and PTIO 05/24/2012 e-mail
» Ohio PTIO 02/14/2012 submittal
» Ohio PBR and PTIO 12/1/2008 Additional Technical Support
» Ohio PTIO 07/18/2008 submittal
CFR: (1)
40 CFR 52