94-24994. Williston Basin Interstate Pipeline Company; Notice of Application  

  • [Federal Register Volume 59, Number 195 (Tuesday, October 11, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-24994]
    
    
    [[Page Unknown]]
    
    [Federal Register: October 11, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP94-823-000]
    
     
    
    Williston Basin Interstate Pipeline Company; Notice of 
    Application
    
    October 4, 1994.
        Take notice that on September 30, 1994, Williston Basin Interstate 
    Pipeline Company (Williston Basin), Suite 300, 200 North Third Street, 
    Bismarck, North Dakota 58501, filed an application with the Commission 
    in Docket No. CP94-823-000 pursuant to Section 7(c) of the Natural Gas 
    Act (NGA) for authorization to amend the authorization granted in 
    Docket No. CP91-1897-000\1\ by adding a new receipt point and 
    reassigning natural gas volumes delivered at various receipt points 
    used to transport gas for Northern States Power Company (NSP), all as 
    more fully set forth in the application which is open to the public for 
    inspection.
    ---------------------------------------------------------------------------
    
        \1\58 FERC 61,344 (1992).
    ---------------------------------------------------------------------------
    
        Williston Basin proposes to add the existing Bowdoin--KNE 
    Whitewater Exchange receipt point in Phillips County, Montana, to its 
    FERC Rate Schedule X-13 for service to NSP during the months of 
    November through March each year. Williston Basin would deliver gas 
    received at the Bowdoin--KNE Whitewater Exchange receipt point to NSP 
    at the existing Mapleton NSP delivery point in Cass County, North 
    Dakota.
        Williston Basin also proposes to reassign portions of the currently 
    effective transportation Maximum Daily Receipt Quantity (MDRQ) under 
    Rate Schedule X-13 from the Little Knife Plant in Billings, North 
    Dakota, and the Lignite Plant in Burke County, North Dakota, to the 
    Bowdoin--KNE Whitewater Exchange receipt point during the November-
    March winter heating season. Williston Basin would receive 500 
    dekatherms at the proposed Bowdoin--KNE Whitewater Exchange receipt 
    point during the heating season and zero during the April-October 
    summer season. Williston Basin would also receive 2,250 dekatherms 
    during the winter heating season and 2,500 dekatherms during the summer 
    season at the Little Knife Plant receipt point. During the winter 
    heating season, Williston Basin would receive 1,000 dekatherms at the 
    Lignite Plant receipt point and 1,250 during the summer season.
        Williston Basin would not construct and operate any new facilities 
    to implement this proposal.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before October 11, 1994, 
    file with the Federal Energy Regulatory Commission, Washington, D.C. 
    20426, a motion to intervene or a protest in accordance with the 
    requirements of the Commission's Rules of Practice and Procedure (18 
    CFR 385.211 or 385.214) and the Regulations under the NGA (18 CFR 
    157.10). All protest filed with the Commission will be considered by it 
    in determining the appropriate action to be taken but will not serve to 
    make the protestants parties to the proceeding. Any person wishing to 
    become a party to a proceeding or to participate as a party in any 
    hearing therein must file a motion to intervene in accordance with the 
    Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the NGA and the 
    Commission's Rules of Practice and Procedure, a hearing will be held 
    without further notice before the Commission or its designee on this 
    application if no motion to intervene is filed within the time required 
    herein, if the Commission on its own review of the matter finds that a 
    grant of the certificate is required by the public convenience and 
    necessity. If a motion for leave to intervene is timely filed, or if 
    the Commission on its own motion believes that a formal hearing is 
    required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Williston Basin to appear or be represented 
    at the hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-24994 Filed 10-7-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/11/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-24994
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: October 11, 1994, Docket No. CP94-823-000