96-25681. Environmental Impact Statement: Broome County, New York  

  • [Federal Register Volume 61, Number 199 (Friday, October 11, 1996)]
    [Notices]
    [Page 53483]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-25681]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    Federal Highway Administration
    
    
    Environmental Impact Statement: Broome County, New York
    
    AGENCY: Federal Highway Administration (FHWA), New York State 
    Department of Transportation (NYDOT).
    
    ACTION: Retract notice of intent to prepare an Environmental Impact 
    Statement (EIS), Susquehanna River Crossing.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The FHWA is issuing this notice to advise the public that an 
    EIS will not be prepared for a proposed bridge that crosses the 
    Susquehanna River connecting Route 17C with Route 17 and Route 434 in 
    eastern Tioga/western Broome Counties, New York as advertised in the 
    Federal Register.
    
    FOR FURTHER INFORMATION CONTACT: Harold J. Brown, Division 
    Administrator, Federal Highway Administration, New York Division, Leo 
    W. O'Brien Federal Building, 9th Floor, Clinton Avenue and North Pearl 
    Street, Albany, New York 12207, Telephone: (518) 431-4127; or Richard 
    R. Church, Regional Director, New York State Department of 
    Transportation, Binghamton State Office Building, 44 Hawley Street, 
    Binghamton, New York 13901-3200, Telephone (607) 721-8116.
    
    SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the NYSDOT, 
    has determined that an EIS will not be prepared for the proposal to 
    construct a bridge and associated approach roadway and interchange 
    ramps for a new crossing of the Susquehanna River. The NYSDOT evaluated 
    four corridors connecting NYS Route 17C with NYS Route 17 and NYS Route 
    17 and 434 located between Hiawatha Boulevard in the town of Owego, 
    Tioga County and NYS Route 26 in the town of Vestal and village of 
    Endicott, Broome County. NYSDOT initiated the preparation of a Draft 
    EIS. A public hearing was held in July 1996 to present the project 
    information to the public and solicit comments.
    
        Upon reevaluation of the project alternatives with regard to goals, 
    economics, environmental impacts and public input, it was determined 
    that Alternative ``A'' has a project objective different from the other 
    alternatives and will be pursued independently. This corridor spans the 
    Susquehanna River at the Route 17 (Exit 66) interchange connecting the 
    hamlets of Apalachin/Campville in the town of Owego, Tioga County. The 
    existing bridges span Route 17 carrying the Exit 66 on and off ramps. 
    They are identified as BINs 1054771 and 1054772. This alternative meets 
    the requirements for a Categorical Exclusion with FHWA concurrence. A 
    Final Design Report will be prepared that evaluates two locations for 
    Alternative ``A'' crossing and the no action alternative.
        The benefits with Alternative ``A'' include the potential for 
    increased economic development, increased access between Routes 17C, 
    434 and 17 in the project area, and improved delivery of public 
    services in the town of Owego which is split by the Susquehanna River.
        The environmental impacts associated with Alternative ``A'' are 
    minor and include: noise impacts at nine locations, disturbance of 
    approximately a 0.3 acre wetland and/or stream in the project area, and 
    a 3% increase in energy consumption.
    
        Issued on: September 30, 1996.
    Harold J. Brown,
    Division Administrator, Federal Highway Administration, Albany, New 
    York.
    [FR Doc. 96-25681 Filed 10-10-96; 8:45 am]
    BILLING CODE 4910-22-M
    
    
    

Document Information

Published:
10/11/1996
Department:
Federal Highway Administration
Entry Type:
Notice
Action:
Retract notice of intent to prepare an Environmental Impact Statement (EIS), Susquehanna River Crossing.
Document Number:
96-25681
Pages:
53483-53483 (1 pages)
PDF File:
96-25681.pdf