96-26123. CNG Transmission Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 199 (Friday, October 11, 1996)]
    [Notices]
    [Pages 53367-53368]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-26123]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. CP97-9-000]
    
    
    CNG Transmission Corporation; Notice of Request Under Blanket 
    Authorization
    
    October 7, 1996.
        Take notice that on October 2, 1996, CNG Transmission Corporation 
    (CNG), P.O. Box 445 West Main Street, Clarksburg, West Virginia 26301, 
    filed in Docket No. CP97-9-000 a request pursuant Sections 157.205(b) 
    and 157.212 of the Commission's Regulations under the Natural Gas Act 
    (18 CFR 157.205(b) and 157.212) for authorization to construct and 
    operate three new delivery points in Gilmer County, West Virginia, to 
    serve Hope Gas, Inc. (Hope), a local distribution company, under CNG's 
    blanket certificate issued in Docket No. CP82-537-000 pursuant to 
    Section 7 of the Natural Gas Act, all as more fully set forth in the 
    request which is on file with the Commission and open to public 
    inspection.
        CNG states that Hope would be providing natural gas services to 
    Hope's existing customers. CNG further states that it would transport 
    quantities of natural gas to Hope under existing, certificated 
    transportation arrangements with Hope.
        CNG also states that Hope needs to construct only minimal 
    facilities. In order to make deliveries to Hope, CNG states that it 
    must construct two four-inch connnections and valves on the TL-297 
    pipeline and one two-inch connection and valve on the TL-264 pipeline.
        It is also stated that Hope would install meter and regulation 
    facilities adjacent to CNG's facilities at the site. The maximum design 
    capacity of the connections and the meter and regulation facilities is 
    5,000 Mcf per day.
        CNG states that the total cost of CNG's construction would be 
    reimbursed by Hope.
        Additionally, CNG states that it has sufficient system delivery 
    capability to deliver these quantities without disadvantaging its 
    existing customers. CNG states that its existing tariff does not 
    prohibit the addition of the new delivery point.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section
    
    [[Page 53368]]
    
    157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a 
    protest to the request. If no protest is filed within the time allowed 
    therefor, the proposed activity shall be deemed to be authorized 
    effective the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for authorization pursuant to Section 7 of the Natural 
    Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-26123 Filed 10-10-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/11/1996
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
96-26123
Pages:
53367-53368 (2 pages)
Docket Numbers:
Docket No. CP97-9-000
PDF File:
96-26123.pdf