2013-24440. Commission Information Collection Activities (FERC-919); Comment Request; Extension  

  • Start Preamble Start Printed Page 62006

    AGENCY:

    Federal Energy Regulatory Commission.

    ACTION:

    Notice of information collection and request for comments.

    SUMMARY:

    In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-919 (Market Based Rates for Wholesale Sales of Electric Energy).

    DATES:

    Comments on the collection of information are due December 10, 2013.

    ADDRESSES:

    You may submit comments (identified by Docket No. IC14-2-000) by either of the following methods:

    Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/​help/​submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.

    Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/​docs-filing/​docs-filing.asp.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title: Market Based Rates for Wholesale Sales of Electric Energy.

    OMB Control No.: 1902-0234.

    Type of Request: Three-year extension of the FERC-919 information collection requirements with no changes to the current reporting requirements.

    Abstract: The FERC-919 is necessary to ensure that market-based rates charged by public utilities are just and reasonable as mandated by Federal Power Act (FPA) sections 205 and 206. Section 205 of the FPA requires just and reasonable rates and charges. Section 206 allows the Commission to revoke a seller's market-based rate authorization if it determines that the seller may have gained market power since it was originally granted market-based rate authorization by the Commission.

    In 18 Code of Federal Regulations (CFR) Part 35, Subpart H,[1] the Commission codifies market-based rate standards for generating electric utilities for use in the Commission's determination of whether a wholesale seller of electric energy, capacity, or ancillary services qualify for market-based rate authority. Subpart H mandates that sellers submit market power analyses and related filings.

    Horizontal Market Power Analysis

    Market power analyses must address both horizontal and vertical market power. To demonstrate lack of horizontal market power, the Commission requires two indicative market power screens:The uncommitted pivotal supplier screen (which is based on the annual peak demand of the relevant market) and the uncommitted market share screen applied on a seasonal basis. The Commission presumes sellers that fail either screen to have market power and such sellers may submit a delivered price test analysis to rebut the presumption of horizontal market power. If a seller fails to rebut the presumption of horizontal market power, the Commission sets the just and reasonable rate at the default cost-based rate unless it approves different mitigation based on case-specific circumstances. When submitting horizontal market power analyses, a seller must use the form provided in Appendix A of Subpart H and include all materials referenced.

    Vertical Market Power Analysis

    To demonstrate a lack of vertical market power to the extent that a public utility with market-based rates, or any of its affiliates, owns, operates or controls transmission facilities, it must:

    • Have on file a Commission-approved Open Access Transmission Tariff [2]
    • Demonstrate that neither it nor its affiliates can erect other barriers to entry
    • Submit a description of its ownership or control of, or affiliation with an entity that owns or controls:

    ○ Intrastate natural gas transportation, intrastate natural gas storage or distribution facilities

    ○ Sites for generation capacity development; and physical coal supply sources and ownership or control over who may access transportation of coal supplies

    • Make an affirmative statement that it has not erected and will not erect barriers to entry into the relevant market

    Asset Appendix

    In addition to the market power analyses, a seller must submit an asset appendix with its initial application for market-based rate authorization or updated market power analysis, and all relevant change in status filings. The asset appendix must:

    • List, among other things, all affiliates that have market-based rate authority and identify any generation assets owned or controlled by the seller and any such affiliate
    • List all generation assets owned (clearly identifying which affiliate owns which asset) or controlled (clearly identifying which affiliate controls which asset) by the corporate family by balancing authority area, and by geographic region, and provide the in-service date and nameplate and/or seasonal ratings by unitStart Printed Page 62007
    • Must reflect all electric transmission and natural gas intrastate pipelines and/or gas storage facilities owned or controlled by the corporate family and the location of such facilities [3]

    Triennial Market Power Analysis Update

    Sellers that own or control more than 500 megawatts of generation and/or that own, operate or control transmission facilities, are affiliated with any entity that owns, operates or controls transmission facilities in the same region as the seller's generation assets, or with a franchised public utility in the same region as the seller's generation assets are required to file updated market power analyses every three years. The updated market power analyses must demonstrate that a seller does not possess horizontal market power.

    Change in Status Filings

    Concerning change of status filings, the Commission requires that sellers file notices of such changes no later than 30 days after the change in status occurs. The Commission also requires that each seller include an appendix identifying specified assets with each pertinent change in status notification filed. Entities must submit a notification of change in status to report the acquisition of control of a site or sites for new generation capacity (described in the Quarterly Land Acquisition section below).

    Exemptions From Submitting Updated Market Power Analyses

    Wholesale power marketers and wholesale power producers that are not affiliated with franchised public utilities or transmission owners, that do not own transmission, and that do not, together with all of their affiliates, own or control more than 500 MW of generation in the relevant region are not required to submit updated market power analyses. The Commission determines which sellers are in this category through information filed by the utility either when the seller files its initial application for market-based rate authorization or through a separate filing made to request such a determination.

    Quarterly Land Acquisition Reports

    FERC also requires that all entities with market-based rate authorization to report on a quarterly basis,[4] the acquisition of control of a site or sites for new generation capacity development for which site control has been demonstrated in the interconnection process and for which the potential number of megawatts that are reasonably commercially feasible on the site or sites for which new generation capacity development is equal to 100 megawatts or more.

    The market power analyses help to inform the Commission as to whether entities have market power and whether market-based rate authority yields rates that are just and reasonable.

    Type of Respondents: Public utilities, wholesale electricity sellers

    Estimate of Annual Burden:[5] The Commission estimates the total Public Reporting Burden for this information collection as:

    FERC-919—Market Based Rates for Wholesale Sales of Electric Energy

    RequirementsNumber of respondentsNumber of responses per respondentTotal number of responsesAverage burden hours per responseEstimated total annual burden
    (A)(B)(A)×(B)=(C)(D)(C)×(D)
    Market Power Analysis in New Applications for Market-based Rates [18 CFR 35.37(a)]213121325053,250
    Triennial market power analysis in seller updates [18 CFR 35.37(a)]8318325020,750
    Quarterly land acquisition reports [18 CFR 35.42(d)]3732.1580243,208
    Appendix B addition to change in status reports [18 CFR 35.42(a)]237123734.758,236
    Total85,444

    The total estimated annual cost burden to respondents is $7,268,721 [85,444 hours * $85.07) [6] = $7,268,721].

    Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

    Start Signature

    Dated: October 4, 2013.

    Kimberly D. Bose,

    Secretary.

    End Signature End Supplemental Information

    Footnotes

    1.  Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities, Order No. 697, 72 FR 39904 (Jul. 20, 2007), FERC Stats. & Regs. ¶ 31,252 (2007) (Final Rule).

    Back to Citation

    2.  Burden reported separately in information collections FERC-516 (OMB Control Number: 1902-0096) and FERC-917 (OMB Control Number: 1902-0233).

    Back to Citation

    3.  See Subpart H, Appendix B for standard form.

    Back to Citation

    4.  All other change in status reports must be filed no later than 30 days after the change in status occurs. (18 CFR 35.42)

    Back to Citation

    5.  The Commission defines burden as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 CFR 1320.3.

    Back to Citation

    6.  The Commission staff calculated this figure using an average of salaries (including benefits: http://www.bls.gov/​news.release/​ecec.nr0.htm) between three occupational categories (http://bls.gov/​oes/​current/​naics2_​22.htm):

    Economist: $67.57/hour

    Electrical Engineer: $59.62/hour

    Lawyer: $128.02/hour

    ($67.57 + $59.62 + $128.02) ÷ 3 = $85.07/hour

    Back to Citation

    [FR Doc. 2013-24440 Filed 10-10-13; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
10/11/2013
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice of information collection and request for comments.
Document Number:
2013-24440
Dates:
Comments on the collection of information are due December 10, 2013.
Pages:
62006-62007 (2 pages)
Docket Numbers:
Docket No. IC14-2-000
PDF File:
2013-24440.pdf