[Federal Register Volume 59, Number 197 (Thursday, October 13, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-25324]
[[Page Unknown]]
[Federal Register: October 13, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG94-105-000, et al.]
The New World Power Company (Dyffryn Brodyn) Limited, et al.;
Electric Rate and Corporate Regulation Filings
October 5, 1994.
Take notice that the following filings have been made with the
Commission:
1. The New World Power Company (Dyffryn Brodyn) Limited
[Docket No. EG94-105-000]
On September 30, 1994, The New World Power Company (Dyffryn Brodyn)
Limited filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's regulations. The New World
Power Company (Dyffryn Brodyn) Limited is a wholly owned subsidiary of
The New World Power Company Limited, a developer of projects in
countries other than the United States that generate electricity from
renewable resources. The New World Power Company (Dyffryn Brodyn)
Limited will be engaged directly and exclusively in the business of
owning and operating a 5.6 MW wind farm located near Whitland, Dyfed,
Wales, and selling electricity at wholesale.
Comment date: October 20, 1994, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. The New World Power Company (4 Burrows) Limited
[Docket No. EG94-106-000]
On September 30, 1994, The New World Power Company (4 Burrows)
Limited, filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's regulations. The New World
Power Company (4 Burrows) Limited, is a wholly owned subsidiary of The
New World Power Company Limited, a developer of projects that generate
electricity from renewable resources in countries other than the United
States. The New World Power Company (4 Burrows) Limited, will be
engaged directly and exclusively in the business of owning and
operating a 4.5 MW wind farm at 4 Burrows, near Truro, Cornwall,
England and selling electricity at wholesale.
Comment date: October 20, 1994, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
3. The New World Power Company Limited
[Docket No. EG94-107-000]
On September 30, 1994, The New World Power Company Limited, filed
with the Federal Energy Regulatory Commission an application for
determination of exempt wholesale generator status pursuant to Part 365
of the Commission's regulations. The New World Power Company Limited
will be engaged, directly or indirectly through one or more affiliates,
exclusively in the business of owning and/or operating one or more
eligible facilities as defined in Section 32 of the Public Utility
Holding Company Act of 1935 and selling electricity at wholesale.
Comment date: October 20, 1994, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
4. The New World Power Company (Caton Moor) Limited
[Docket No. EG94-108-000]
On September 30, 1994, The New World Power Company (Caton Moor)
Limited filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's regulations. The New World
Power Company (Caton Moor) Limited is a wholly owned subsidiary of The
New World Power Company Limited, a developer of projects that generate
electricity from renewable resources in countries other than the United
States. The New World Power Company (Caton Moor) Limited will be
engaged directly and exclusively in the business of owning and
operating a 3 MW wind farm located at Caton Moor, Caton-with
Littledale, Lancashire, England, and selling electricity at wholesale.
Comment date: October 20, 1994, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
5. Midwest Power Systems Inc.
[Docket No. ER94-985-000]
Take notice that on October 4, 1994, Midwest Power Systems Inc.
(MPSI) tendered for filing Amendment No. 2 to the filing of an Electric
Interchange and Interconnection Agreement (Agreement) dated January 24,
1994 between Indianola Waterworks and Electric Light & Power Board of
Trustees (Indianola) and MPSI. The Agreement, which replaces a 1989
Electric Interchange Agreement, establishes the rights and obligations
of the parties with respect to their interconnecting facilities and the
coordinated operation of their systems.
Amendment No. 2 contains additional support data and information.
The Agreement is effective upon acceptance by the Commission and
remains in effect for an initial ten (10) years.
MPSI states that copies of this filing were served on Indianola and
the Iowa Utilities Board.
Comment date: October 17, 1994, in accordance with Standard
Paragraph E at the end of this notice.
6. PSI Energy, Inc.
[Docket No. ER94-1401-000]
Take notice that PSI Energy, Inc. (PSI), on September 30, 1994,
tendered for filing a Certificate of Concurrence between PSI and Louis
Dreyfus Electric Inc. (Dreyfus).
Copies of the filing were served on Louis Dreyfus Electric Power
Inc., Connecticut Department of Public Utility Control and the Indiana
Utility Regulatory Commission.
Comment date: October 17, 1994, in accordance with Standard
Paragraph E at the end of this notice.
7. Southern California Edison Company
[Docket No. ER94-1421-001]
Take notice that on September 14, 1994, Southern California Edison
Company submitted supplemental information regarding its filing in the
above captioned docket in accordance with Ordering Paragraph C of the
Commission's August 30, 1994, Order Asserting Jurisdiction, Noting
Interventions, Granting Waiver, Suspending Filing and Establishing
Hearing Procedures.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
Comment date: October 19, 1994, in accordance with Standard
Paragraph E at the end of this notice.
8. Arizona Public Service Company
[Docket No. ER94-1461-000]
Take notice that on August 10, 1994, Tucson Electric Power Company
tendered for filing a Certificate of Concurrence in the above-
referenced docket.
Comment date: October 19, 1994, in accordance with Standard
Paragraph E at the end of this notice.
9. Arizona Public Service Company
[Docket No. ER94-1461-000]
Take notice that on August 17, 1994, Nevada Power Company tendered
for filing a Certificate of Concurrence in the above-referenced docket.
Comment date: October 19, 1994, in accordance with Standard
Paragraph E at the end of this notice.
10. Northern States Power Company (Minnesota Company)
[Docket No. ER94-1622-000]
Take notice that on September 29, 1994, Northern States Power
Company (Minnesota) [NSP-MN] tendered for filing an amendment to its
original filing of the Interconnection and Interchange Agreement dated
September 17, 1993, between NSP-MN, Northern States Power Company
(Wisconsin) [NSP-WI], and Upper Peninsula Power Company [UPP]. As with
the original filing, NSP-MN files this amendment to filing on behalf of
NSP-WI, UPPI, and itself.
The Interconnection and Interchange Agreement provides for the
interchange of electrical power and energy between the parties as well
as for possible future interconnected electrical operation between the
parties' systems. In the original filing the Commission was requested
to accept the agreement for filing effective November 1, 1994. This
amendment to filing changes the requested effective date to October 1,
1994.
Comment date: October 19, 1994, in accordance with Standard
Paragraph E at the end of this notice.
11. Virginia Electric and Power Company
[Docket No. ER94-1647-000]
Take notice that on September 14, 1994, Virginia Electric and Power
Company (Virginia Power) tendered for filing a Service Agreement
between Wabash Valley Power Association and Virginia Power, dated
August 15, 1994, under the Power Sales Tariff to Eligible Purchasers
dated May 27, 1994. Under the tendered Service Agreement Virginia Power
agrees to provide services to Wabash Valley Power Association under the
rates, terms and conditions of the Power Sales Tariff as agreed by the
parties pursuant to the terms of the applicable Service Schedules
included in the Power Sales Tariff.
Copies of the filing were served upon the Virginia State
Corporation Commission and the North Carolina Utilities Commission.
Comment date: October 19, 1994, in accordance with Standard
Paragraph E at the end of this notice.
12. Oklahoma Gas and Electric Company
[Docket No. ES94-44-000]
Take notice that on September 30, 1994, Oklahoma Gas and Electric
Company filed an application under Sec. 204 of the Federal Power Act
seeking authorization to issue not more than $400 million of short-term
debt securities from time to time through December 31, 1996, with a
final maturity date no later than December 31, 1997.
Comment date: October 31, 1994, in accordance with Standard
Paragraph E at the end of this notice.
13. U.S. Department of the Navy
[Docket Nos. QF85-287-001 and EL94-70-000]
On September 2, 1994, the U.S. Department of the Navy (Navy)
tendered for filing an amendment to its filing in these dockets.
The amendment pertains to information relating to Navy's Petition
For Temporary Waiver of the Commission's Regulations under the Public
Utility Regulatory Policies Act of 1978 (PURPA).
Comment date: October 24, 1994, in accordance with Standard
Paragraph E at the end of this notice.
14. University Cogeneration, Inc.
[Docket Nos. QF86-529-003 and EL94-76-000]
On September 28, 1994, University Cogeneration, Inc. (Applicant),
tendered for filing an amendment to its filing in this docket.
The amendment provides additional information pertaining to the
natural gas and electric energy rates associated with the operation of
Applicant's cogeneration facility
Comment date: October 24, 1994, in accordance with Standard
Paragraph E at the end of this notice.
15. Newark Bay Cogeneration Partnership, L.P.
[Docket Nos. QF86-1014-006 and EL94-27-000]
On September 30, 1994, Newark Bay Cogeneration Partnership, L.P.
(Newark Bay) tendered for filing an amendment to its filing in these
dockets.
The amendment pertains to information relating to Newark Bay's
Petition For Temporary Waiver of the Commission's Regulations under the
Public Utility Regulatory Policies Act of 1978 (PURPA).
Comment date: October 24, 1994, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-25324 Filed 10-12-94; 8:45 am]