95-25396. Northeast Nuclear Energy Company; Notice of Withdrawal of Application for Amendment to Facility Operating License  

  • [Federal Register Volume 60, Number 198 (Friday, October 13, 1995)]
    [Notices]
    [Page 53439]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-25396]
    
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket No. 50-245]
    
    
    Northeast Nuclear Energy Company; Notice of Withdrawal of 
    Application for Amendment to Facility Operating License
    
        The U.S. Nuclear Regulatory Commission (the Commission) has granted 
    the request of Northeast Nuclear Energy Company (the licensee) to 
    withdraw its May 26, 1995, application for proposed amendment to 
    Facility Operating License No. DPR-21 for Millstone Nuclear Power 
    Station, Unit 1, located in New London County, Connecticut.
        The proposed amendment would have deleted the existing limiting 
    conditions for operation (LCOs) and surveillance requirements and added 
    new LCOs, surveillance requirements, and bases for loss of normal power 
    instrumentation.
        The Commission had previously issued a Notice of Consideration of 
    Issuance of Amendment published in the Federal Register on June 21, 
    1995, (60 FR 32371). However, by letter dated October 3, 1995, the 
    licensee withdrew the proposed change.
        For further details with respect to this action, see the 
    application for amendment dated May 26, 1995, and the licensee's letter 
    dated October 3, 1995, which withdrew the application for license 
    amendment. The above documents are available for public inspection at 
    the Commission's Public Document Room, the Gelman Building, 2120 L 
    Street, NW., Washington, DC, and at the local public document room 
    located at the Learning Resource Center, Three Rivers Community-
    Technical College, 574 New London Turnpike, Norwich, CT 06360.
    
    
        Dated at Rockville, Maryland, this 5th day of October, 1995.
    
        For the Nuclear Regulatory Commission.
    
    James W. Andersen,
    Project Manager, Project Directorate I-3, Division of Reactor Projects-
    I/II, Office of Nuclear Reactor Regulation.
    [FR Doc. 95-25396 Filed 10-12-95; 8:45 am]
    BILLING CODE 7590-01-P
    
    

Document Information

Published:
10/13/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-25396
Pages:
53439-53439 (1 pages)
Docket Numbers:
Docket No. 50-245
PDF File:
95-25396.pdf