[Federal Register Volume 60, Number 198 (Friday, October 13, 1995)]
[Notices]
[Pages 53372-53373]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-25455]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5229-6]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 260-5076 OR (202) 260-5075. Weekly receipt of
Environmental Impact Statements Filed October 02, 1995 Through October
06, 1995 Pursuant to 40 CFR 1506.9.
EIS No. 950453, Draft EIS, AFS, AK, 1995 Mendenhall Glacier Recreation
Area Management Plan, Implementation, Tongass National Forest, Juneau
Ranger District, Chatham Area, AK, Due: November 27, 1995, Contact:
Joni Packard (907) 586-8800.
EIS No. 950454, Draft Supplement, FHW, UT, I-15/State Street Corridor
Highway and Transit Improvements, Updated Information, Construction
between 10800 South Street to 500 North Street, Funding, NPDES and COE
404 Permits, Salt Lake County, UT, Due: December 01, 1995, Contact:
William R. Gedris (801) 963-0183.
EIS No. 950455, Final EIS, BOP, LA, Pollock US Penitentiary and Federal
Prison Camp (FPC), Construction and Operation and Site Selection of a
former World War II Military Installation, Grant Parish, LA, Due:
November 13, 1995, Contact: David J. Dorworth (202) 514-6470.
EIS No. 950456, Final EIS, FAA, CA, Burbank-Glendale-Pasadena Airport,
Replacement Passenger Terminal Construction, Approval, Los Angeles
County, CA, Due: November 13, 1985, Contact: David B. Kessler (310)
725-3615.
EIS No. 950457, Draft EIS, COE, MN, Northwestern Minnesota Basin Flood
Control Impoundments, Construction and Operation, Flood Damage
Reduction, Red River, St. Paul District, MN, Due: November 27, 1995,
Contact: Robert J. Whiting (612) 290-5264.
EIS No. 950458, Draft Supplement, COE, CA, Richmond Harbor Deep Draft
Navigation Improvements, Updated and Additional Information, Improve
Navigation Efficiency into the Potrero Reach Channel, San Francisco
Bay, Contra Costa County, CA, Due: November 28, 1995, Contact: Linda
Ngim (415) 744-3345.
EIS No. 950459, Final EIS, BLM, CT, Weir Farm National Historic Site,
Implementation, General Management Plan, Possible COE Section 404
Permit, Towns of Ridgefield and Walton, Fairfield County, CT, Due:
November 13, 1995, Contact: Bob Fox (203) 544-9829.
EIS No. 950460, Final EIS, FHW, WI, US 151/WI 41 Waupun to Fond du Lac
Project, Construction, Funding and Possible COE Section 404 Permit,
Fond du Lac County, WI, Due: November 13, 1995, Contact: James Zavoral
(608) 264-5944.
[[Page 53373]]
Amended Notices
EIS No. 950382, Draft EIS, AFS, MT, Castle Mountains Allotment
Management Plan, Implementation, Lewis and Clark National Forest,
Musselshell and King Hill Ranger Districts, White Sulphur Springs,
Meagher County, MT, Due: November 30, 1995, Contact: Dave Wanderaas
(406) 566-2292.
Published FR 08-18-95--Review period extended.
Dated: October 10, 1995.
William D. Dickerson,
Director, NEPA Compliance Division Office of Federal Activities.
[FR Doc. 95-25455 Filed 10-12-95; 8:45 am]
BILLING CODE 6560-50-U