[Federal Register Volume 64, Number 197 (Wednesday, October 13, 1999)]
[Notices]
[Pages 55469-55471]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-26645]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG00-1-000, et al.]
PP&L Colstrip, II LLC, et al.; Electric Rate and Corporate
Regulation Filings
October 5, 1999.
Take notice that the following filings have been made with the
Commission:
1. PP&L Colstrip, II LLC
[Docket No. EG00-1-000]
Take notice that on October 1, 1999, PP&L Colstrip II LLC
(Applicant), 11350 Random Hills Road, Fairfax, Virginia, 22030-6044,
filed with the Federal Energy Regulatory Commission (Commission), an
application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's regulations.
Applicant, a limited liability company organized under the laws of
the State of Delaware, is acquiring interests held by Portland General
Electric Company in Units 3 and 4 of the Colstrip Generation Station
located in Montana. The facilities will be used to make sales of
electric energy exclusively at wholesale.
Copies of the application have been served upon the Montana Public
Service Commission, the Public Utility Commission of Oregon, and the
Securities and Exchange Commission.
Comment date: October 26, 1999, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. New England Power Pool
[Docket No. ER99-4572-000]
Take notice that on September 30, 1999, the New England Power Pool
Participants Committee tendered for filing for acceptance five
signature pages to the New England Power Pool (NEPOOL) Agreement dated
September 1, 1971, as amended, signed by Middletown Power LLC
(Middletown Power), Montville Power LLC (Montville Power), Norwalk
Power LLC (Norwalk Power), Devon Power LLC (Devon Power) and
Connecticut Jet Power LLC (Connecticut Jet Power). The NEPOOL Agreement
has been designated NEPOOL FPC No. 2.
The Participants Committee states that the Commission's acceptance
of the signature pages of Middletown Power, Montville Power, Norwalk
Power, Devon Power and Connecticut Jet Power (the NRG Subsidiaries)
would permit NEPOOL to expand its membership to
[[Page 55470]]
include the NRG Subsidiaries. The Participants Committee further states
that the filed signature page does not change the NEPOOL Agreement in
any manner, other than to make the NRG Subsidiaries a member in NEPOOL.
The Participants Committee requests an effective date of October 1,
1999, for commencement of participation in NEPOOL by the NRG
Subsidiaries.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
3. Wolverine Power Supply Cooperative, Inc.
[Docket No. ER99-4588-000]
Take notice that on September 30, 1999, Wolverine Power Supply
Cooperative, Inc., tendered for filing an executed Service Agreement
for Point-to-Point Transmission Service with Great Lakes Energy under
its Open Access Transmission Tariff.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
4. Barton Villages, Inc., Village of Enosburg Falls Water & Light
Department, Village of Orleans, and Village of Swanton, Vermont v.
Citizens Utilities Company
[Docket No. EL92-33-007]
Take notice that on October 1, 1999, Citizens Utilities Company
(Citizens), tendered for filing in the above-referenced proceeding a
supplement to its September 2, 1999, compliance filing containing
Incremental Power Supply Cost Data for the period of 1963-1975.
Comment date: October 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
5. New England Power Pool
[Docket No. ER99-4573-000]
Take notice that on September 30, 1999, the New England Power Pool
Participants Committee filed for acceptance a signature page to the New
England Power Pool (NEPOOL) Agreement dated September 1, 1971, as
amended, signed by Lowell Cogeneration Company Limited Partnership
(Lowell Cogeneration Company). The NEPOOL Agreement has been designated
NEPOOL FPC No. 2.
The Participants Committee states that the Commission's acceptance
of Lowell Cogeneration Company's signature page would permit NEPOOL to
expand its membership to include Lowell Cogeneration Company. The
Participants Committee further states that the filed signature page
does not change the NEPOOL Agreement in any manner, other than to make
Lowell Cogeneration Company a member in NEPOOL.
The Participants Committee requests an effective date of October 1,
1999, for commencement of participation in NEPOOL by Lowell
Cogeneration Company.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
6. New England Power Pool
[Docket No. ER99-4574-000]
Take notice that on September 30, 1999, the New England Power Pool
Participants Committee tendered for filing for acceptance a signature
page to the New England Power Pool (NEPOOL) Agreement dated September
1, 1971, as amended, signed by Utility.com, Inc. (Utility.com). The
NEPOOL Agreement has been designated NEPOOL FPC. No. 2.
The Participants Committee states that the Commission's acceptance
of Utility.com's signature page would permit NEPOOL to expand its
membership to include Utility.com. The Participants Committee further
states that the filed signature page does not change the NEPOOL
Agreement in any manner, other than to make Utility.com a member in
NEPOOL.
The Participants Committee requests an effective date of November
1, 1999, for commencement of participation in NEPOOL by Utility.com.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
7. New England Power Pool
[Docket No. ER99-4575-000]
Take notice that on September 30, 1999, the New England Power Pool
Participants Committee filed for acceptance a signature page to the New
England Power Pool (NEPOOL) Agreement dated September 1, 1971, as
amended, signed by New York Power Authority (NYPA). The NEPOOL
Agreement has been designated NEPOOL FPC No. 2.
The Participants Committee states that the Commission's acceptance
of NYPA's signature page would permit NEPOOL to expand its membership
to include NYPA. The Participants Committee further states that the
filed signature page does not change the NEPOOL Agreement in any
manner, other than to make NYPA a member in NEPOOL.
The Participants Committee requests an effective date of October 1,
1999, for the commencement of participation in NEPOOL by NYPA.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
8. Illinois Power Company
[Docket No. ER99-4576-000]
Take notice that on September 30, 1999, Illinois Power Company
(Illinois Power) tendered for filing a Rate Schedule for Sale,
Assignment, or Transfer of Transmission Rights (Rate Schedule). The
Rate Schedule will allow Illinois Power to resell transmission rights
in accordance with Order Nos. 888 and 888-A.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
9. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4579-000]
Take notice that on September 30, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to New York Power Authority (NYPA).
Con Edison states that a copy of this filing has been served by
mail upon NYPA.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
10. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4580-000]
Take notice that on September 30, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to New York Power Authority (NYPA).
Con Edison states that a copy of this filing has been served by
mail upon NYPA.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
11. Wisconsin Public Service Corporation
[Docket No. ER99-4581-000]
Take notice that on September 30, 1999, Wisconsin Public Service
Corporation (WPSC), tendered for filing an executed Service Agreement
with Aquila Energy providing for firm point-to-point transmission
service under FERC Electric Tariff, Volume No. 1.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 55471]]
12. Wisconsin Public Service Corporation
[Docket No. ER99-4582-000]
Take notice that on September 30, 1999, Wisconsin Public Service
Corporation (WPSC), tendered for filing an executed Service Agreement
with Aquila Energy providing for transmission service under FERC
Electric Tariff, Volume No. 1.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
13. New England Power Company
[Docket No. ER99-4583-000]
Take notice that on September 30, 1999, New England Power Company
(NEP), tendered for filing its Network Operating Agreement and Service
Agreement for Network Integration Transmission Service (Agreements)
with Western Massachusetts Electric Company. These Agreements were
filed pursuant to the New England Power Pool's Offer of Settlement
filed on April 7, 1999 in Docket Nos. OA97-237-000, et. al., which was
approved by the Commission on July 30, 1999.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
14. Nevada Power Company
[Docket No. ER99-4584-000]
Take notice that on September 30, 1999, Nevada Power Company (NPC),
tendered for filing a Service Agreement to provide Firm Point-to-Point
Transmission Service under NPC's (Transmission Provider) Open Access
Transmission Tariff with Dynegy Marketing and Trade, Inc. (Dynegy)
(Transmission Customer).
A copy of this filing has been served on Dynergy (Transmission
Customer) and the Nevada Public Service Commission.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
15. Central Vermont Public Service Corporation
[Docket No. ER99-4585-000]
Take notice that on September 30, 1999, Central Vermont Public
Service Corporation (Central Vermont), tendered for filing an
unexecuted umbrella service agreement with Public Service Electric and
Gas Company under Central Vermont's market-based rates tariff, FERC
Electric Tariff, Second Revised Volume No. 8.
Central Vermont requests that the service agreement become
effective on September 1, 1999, the date service commenced under the
tariff.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
16. New England Power Company
[Docket No. ER99-4586-000]
Take notice that on September 30, 1999, New England Power Company
tendered for filing a Design Support, Review, and Testing Agreement
with American National Power, Inc., in connection with the ANP
Bellingham Energy project in Bellingham, Massachusetts.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
17. Wolverine Power Supply Cooperative, Inc.
[Docket No. ER99-4587-000]
Take notice that on September 30, 1999, Wolverine Power Supply
Cooperative, Inc., tendered for filing an executed Service Agreement
for Firm Point-to-Point Transmission Service with Great Lakes Energy
under its Open Access Transmission Tariff.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
18. Louisville Gas and Electric Company/Kentucky Utilities Company
[Docket No. ER99-4589-000]
Take notice that on September 30, 1999, Louisville Gas and Electric
Company (LG&E)/Kentucky Utilities (KU) (Companies), tendered for filing
an unexecuted unilateral Service Agreement between the Companies and
Tenaska Power Services Company under the Companies Rate Schedule MBSS.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
19. Louisville Gas and Electric Company/Kentucky Utilities Company
[Docket No. ER99-4590-000]
Take notice that on September 30, 1999, Louisville Gas and Electric
Company (LG&E)/Kentucky Utilities (KU) (Companies), tendered for filing
the cancellation of the bilateral Market-Based Sales Service Agreement
between the Companies and Tenaska Power Services Company.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
20. New England Power Pool
[Docket No. ER99-4591-000]
Take notice that on September 30, 1999, the New England Power Pool
Participants Committee tendered for filing an extension of NEPOOL
Market Rule and Procedure 15.
Additionally, NEPOOL has requested a waiver of the Commission's
notice requirements to permit the extension of Market Rule 15 to become
effective on October 1, 1999.
The NEPOOL Participants Committee states that copies of these
materials were sent to the New England state governors and regulatory
commissions and the Participants in the New England Power Pool.
Comment date: October 20, 1999, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest such filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). All such motions
or protests should be filed on or before the comment date. Protests
will be considered by the Commission in determining the appropriate
action to be taken, but will not serve to make protestants parties to
the proceeding. Any person wishing to become a party must file a motion
to intervene. Copies of these filings are on file with the Commission
and are available for public inspection. This filing may also be viewed
on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-
208-2222 for assistance).
David P. Boergers,
Secretary.
[FR Doc. 99-26645 Filed 10-12-99; 8:45 am]
BILLING CODE 6717-01-P