2016-24729. Blackstone Hydro Associates; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process  

  • Start Preamble

    a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process.

    b. Project No.: 3063-020.

    c. Date Filed: July 29, 2016.

    d. Submitted By: Blackstone Hydro Associates.

    e. Name of Project: Central Falls Hydroelectric Project.

    f. Location: On the Blackstone River, in Providence County, Rhode Island. No federal lands are occupied by the project works or located within the project boundary.

    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.

    h. Potential Applicant Contact: Simeon Bruner, Blackstone Hydro Associates, 130 Prospect Street, Cambridge, MA 02139; phone: (617) 492-8400.

    i. FERC Contact: Michael Watts at (202) 502-6123; or email at michael.watts@ferc.gov.

    j. Blackstone Hydro Associates (Blackstone Hydro) filed its request to use the Traditional Licensing Process on July 29, 2016. Blackstone Hydro provided public notice of its request on August 3, 2016. In a letter issued on September 15, 2016, the Director of the Division of Hydropower Licensing approved Blackstone Hydro's request to use the Traditional Licensing Process.

    k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Rhode Island State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2.

    l. Blackstone Hydro filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.

    m. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site (http://www.ferc.gov), using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h.

    n. The licensee states its unequivocal intent to submit an application for a new license for Project No. 3063. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by July 31, 2019.

    o. Register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    Start Signature

    Dated: October 6, 2016.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2016-24729 Filed 10-12-16; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
10/13/2016
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2016-24729
Pages:
70671-70671 (1 pages)
Docket Numbers:
Project No. 3063-020
PDF File:
2016-24729.pdf