2021-22238. BNSF Railway's Request for Testing Approval on Its Certified Positive Train Control System  

  • Start Preamble

    AGENCY:

    Federal Railroad Administration (FRA), U.S. Department of Transportation (DOT).

    ACTION:

    Notice of availability and request for comments.

    SUMMARY:

    This document provides the public with notice that on August 2, 2021, BNSF Railway (BNSF) submitted its Onboard Movement Authority with the Virtual Block System (OMA VBS) Afton Pilot Test Plan, Version 1.2a, dated August 3, 2021, to FRA via the Secure Information Repository. BNSF asks FRA to approve its Test Plan, which includes changes to operating rules and procedures and dispatch processes, to test its OMA VBS on track that has been equipped with positive train control (PTC).

    DATES:

    FRA will consider comments received by December 13, 2021 before taking final action on the Testing Plan. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.

    ADDRESSES:

    All comments concerning this proceeding should identify the agency name and Docket Number FRA-2010-0056, and may be submitted on https://www.regulations.gov. Follow the online instructions for submitting comments. For convenience, all active PTC dockets are hyperlinked on FRA's website at https://railroads.dot.gov/​train-control/​ptc/​ptc-annual-and-quarterly-reports. All comments received will be posted without change to https://www.regulations.gov;​; this includes any personal information.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Gabe Neal, Staff Director, Signal, Train Control, and Crossings Division, telephone: 816-516-7168, email: Gabe.Neal@dot.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    On April 29, 2021, FRA certified BNSF's Interoperable Electronic Train Management System (I-ETMS) PTC system per Title 49 Code of Federal Regulations (CFR) Section 236.1015. Pursuant to 49 CFR 236.1035, BNSF must request FRA-approval of any regression testing of a certified PTC system that is conducted on the general rail system. BNSF's Test Plan describes the level of testing of its OMA VBS required to confirm that software changes comply with the documented requirements outlined in the I-ETMS Onboard Segment Requirements Specifications.

    BNSF's Test Plan and accompanying request for approval are available for review online at www.regulations.gov (Docket Number FRA-2010-0056). Interested parties are invited to comment on the Test Plan by submitting written comments or data. During its review of the Test Plan, FRA will consider any comments or data submitted. 49 CFR 236.1011(e). However, FRA may elect not to respond to any particular comment and, under 49 CFR 236.1009(d)(3), FRA maintains the authority to approve or disapprove the Test Plan at its sole discretion.

    Privacy Act Notice

    In accordance with 49 CFR 211.3, FRA solicits comments from the public to better inform its decisions. DOT posts these comments, without edit, including any personal information the commenter provides, to https://www.regulations.gov,, as described in the system of records notice (DOT/ALL-14 FDMS), which can be reviewed at https://www.transportation.gov/​privacy. See https://www.regulations.gov/​privacy-notice for the privacy notice of regulations.gov . To facilitate comment tracking, we encourage commenters to provide their name, or the name of their organization; however, submission of names is completely optional. If you wish to provide comments containing proprietary or confidential information, please contact FRA for alternate submission instructions.

    Start Signature

    Issued in Washington, DC.

    Carolyn R. Hayward-Williams,

    Director, Office of Railroad Systems and Technology.

    End Signature End Supplemental Information

    [FR Doc. 2021-22238 Filed 10-12-21; 8:45 am]

    BILLING CODE 4910-06-P

Document Information

Published:
10/13/2021
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Notice of availability and request for comments.
Document Number:
2021-22238
Dates:
FRA will consider comments received by December 13, 2021 before taking final action on the Testing Plan. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.
Pages:
56999-56999 (1 pages)
Docket Numbers:
Docket No. FRA-2010-0056
PDF File:
2021-22238.pdf
Supporting Documents:
» BNSF Q3 2018 PTC Progress Report
» BNSF 2017 Annual PTC Progress Report
» BNSF Railway Interoperable Electronic Train Management System (I-ETMS) Positive Train Control Safety Plan (PTCSP)
» BNSF Q2 2017 PTC Progress Report
» BNSF Railway (BNSF) PTC Implementation Plan (PTCIP) Version 1.9 Appendices
» I-ETMS_PTC_Track_Database_Avard_V_V_Test_Report_V10-11_v1_0_REDACTED
» I-ETMS_Onboard_6.3.8.26_Test_Plan_v1.0_REDACTED
» I-ETMS Stockton PTC Track Database V V Test Report V35-38 v1.0_REDACTED
» I-ETMS_SD70ACE_Locomotive Class Testing_Test Plan_Book1_v1.0_REDACTED
» I-ETMS_Onboard_6.3.11_2_Regression_Test Plan_Book_1_v1.0_REDACTED