98-27611. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 199 (Thursday, October 15, 1998)]
    [Notices]
    [Page 55380]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-27611]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-2-000]
    
    
    NorAm Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    October 8, 1998.
        Take notice that on October 1, 1998, NorAm Gas Transmission Company 
    (NGT), 1111 Louisiana, Houston, Texas 77002-5231, filed in Docket No. 
    CP99-2-000 a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.211) for authorization to construct and operate certain facilities 
    in Arkansas under NGT's blanket certificate issued in Docket No. CP82-
    384-000 and CP82-384-001 pursuant to Section 7 of the Natural Gas Act, 
    all as more fully set forth in the request that is on file with the 
    Commission and open to public inspection.
        NGT specifically proposes to construct and operate a 2-inch 
    delivery tap and first-cut regulator to serve ARKLA, a division of 
    NorAm Energy Corp. (ARKLA). The tap will be installed on NGT's Line K-
    north in Section 1, Township 14 South, Range 17 West, Ouachita County, 
    Arkansas. The estimated volumes to be delivered to this tap are 
    approximately 91,000 MMBtu annually and 720 MMBtu on a peak day. The 
    tap and first-cut regulator are to be constructed at an estimated cost 
    of $7,753 and ARKLA will reimburse NGT the construction costs. ARKLA 
    will, at its cost, construct a 2-inch U-shape meter station and convey 
    ownership to NGT. NGT will own and operate the tap and meter station.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefore, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 20 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Waston, Jr.,
    Acting Secretary.
    [FR Doc. 98-27611 Filed 10-14-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/15/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-27611
Pages:
55380-55380 (1 pages)
Docket Numbers:
Docket No. CP99-2-000
PDF File:
98-27611.pdf