E9-24749. Job Corps: Preliminary Finding of No Significant Impact (FONSI) for the Installation of a Small Wind Turbine at the North Texas Job Corps Center Located at 1701 North Church Street, McKinney, TX  

  • Start Preamble

    AGENCY:

    Office of the Secretary, Department of Labor.

    RECOVERY:

    This project will be wholly funded under the American Recovery and Reconstruction Act of 2009.

    ACTION:

    Preliminary Finding of No Significant Impact (FONSI) for a Small Wind Turbine Installation to be located at the North Texas Job Corps Center, Start Printed Page 529791701 North Church Street, McKinney, Texas.

    SUMMARY:

    Pursuant to the Council on Environmental Quality Regulations (40 CFR part 1500-08) implementing procedural provisions of the National Environmental Policy Act (NEPA), the Department of Labor, Office of the Secretary (OSEC) in accordance with 29 CFR 11.11(d), gives notice that an Environmental Assessment (EA) has been prepared for a proposed Wind Turbine Installation to be located at the North Texas Job Corps Center, 1701 North Church Street, McKinney, Texas, and that the proposed plan for the construction of a wind turbine at the North Texas Job Corps Center will have no significant environmental impact. This Preliminary Finding of No Significant Impact (FONSI) will be made available for public review and comment for a period of 30 days.

    DATES:

    Comments must be submitted by November 16, 2009.

    ADDRESSES:

    Any comment(s) are to be submitted to William A Dakshaw, P.E., Division of Facilities and Asset Management, Department of Labor, 200 Constitution Avenue, NW., Room N-4460, Washington, DC 20210, (202) 693-2867 (this is not a toll-free number).

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Copies of the EA are available to interested parties by contacting William A Dakshaw, P.E., Division of Facilities and Asset Management, Department of Labor, 200 Constitution Avenue, NW., Room N-4460, Washington, DC 20210, (202) 693-2867 (this is not a toll-free number).

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    This EA summary addresses the proposed construction of a single 50 kW rated wind turbine at the North Texas Job Corps Center.

    The wind turbine will be installed on self-supporting towers approximately 120′ above the ground. The wind turbine will produce clean energy for the North Texas Job Corps center, demonstrate renewable energy capabilities to Job Corps Students and help the program meet federal requirements in Executive Order 13423 for renewable energy production.

    This project is not expected to have a negative impact on population demographics, the surrounding area, environmental quality, or natural systems and heritage.

    Based on the information gathered during the preparation of the EA, the construction of the Wind Turbine Installation at the North Texas Job Corps Center, 1701 North Church Street, McKinney, Texas will not create any significant adverse impacts on the environment.

    Start Signature

    Dated: October 7, 2009.

    Lynn Intrepidi,

    Interim National Director of Job Corps.

    End Signature End Supplemental Information

    [FR Doc. E9-24749 Filed 10-14-09; 8:45 am]

    BILLING CODE 4510-23-P

Document Information

Published:
10/15/2009
Department:
Labor Department
Entry Type:
Notice
Action:
Preliminary Finding of No Significant Impact (FONSI) for a Small Wind Turbine Installation to be located at the North Texas Job Corps Center, 1701 North Church Street, McKinney, Texas.
Document Number:
E9-24749
Dates:
Comments must be submitted by November 16, 2009.
Pages:
52978-52979 (2 pages)
PDF File:
e9-24749.pdf