95-25533. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 199 (Monday, October 16, 1995)]
    [Notices]
    [Page 53607]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-25533]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-6-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    October 10, 1995.
        Take notice that on October 4, 1995, ANR Pipeline Company (ANR), 
    500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. 
    CP96-6-000 a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
    157.211) for authorization to modify and operate an existing 
    interconnection between ANR and Continental Natural Gas, Inc. (CNG) in 
    Beaver County, Oklahoma for delivery of natural gas to CNG under ANR's 
    blanket certificate issued in Docket No. CP82-480-000 pursuant to 
    Section 7 of the Natural Gas Act, all as more fully set forth in the 
    request that is on file with the Commission and open to public 
    inspection.
        ANR proposes to modify an existing interconnection (CNG ``A'' 
    Station) in Beaver County, Oklahoma and to operate this interconnection 
    under Section 7(c) of the Natural Gas Act. Currently, ANR receives gas 
    at the CNG ``A'' Station. ANR's proposed modification would change the 
    direction of the gas flow and allow ANR to deliver natural gas at this 
    station. The proposed modification to CNG ``A'' station would consist 
    of a new valve, an electronic measurement system, a gas sampler and 
    appurtenant facilities. ANR states that the cost of the proposed 
    facilities is approximately $25,000.
        ANR would provide CNG with deliveries at the CNG ``A'' Station 
    under Rate Schedule IT of its FERC Gas Tariff, Second Revised Volume 
    No. 1. The maximum capacity of the CNG ``A'' Station would be 6,000 Mcf 
    per day. ANR states that the volumes to be delivered will be within the 
    certificated entitlements of the customer.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-25533 Filed 10-13-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
10/16/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-25533
Pages:
53607-53607 (1 pages)