E7-20289. Georgia Power Company; Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble October 4, 2007.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Application Type: Non-Project Use of Project Lands and Waters.

    b. Project No.: 2413-094.

    c. Date Filed: August 23, 2007.

    d. Applicant: Georgia Power Company.

    e. Name and Location of Project: Wallace Dam Project is located on the Lake Oconee in Greene County, Georgia. The proposed project does not occupy federal lands.

    f. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

    g. Applicant Contact: Lee Glenn, Georgia Power Company, 125 Wallace Dam Road, NE., Eatonton, GA 31024, (706) 485-8704.

    h. FERC Contact: Gina Krump, Telephone (202) 502-6704, or by e-mail at gina.krump@ferc.gov.

    i. Deadline for filing comments, protests, and motions to intervene: November 5, 2007.

    All documents (original and eight copies) should be filed with Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

    The Commission's Rules of Practice and Procedure require all intervenors filing a document with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the documents on that resource agency.

    j. Description of Application: The licensee is seeking Commission approval to issue a permit to Heron Cove Properties, LLC for the construction of five docks, totaling 42 slips, a 985-foot seawall, and a boat ramp on approximately 0.13 acre of project land. The proposal is for the use of residents at a condominium development. All proposed work is consistent with the current permitting limitations.

    k. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “e-Library” link. Enter the project number excluding the last three digits (P-2413-094) in the docket number field to access the document. For online assistance, contact FERCOnlineSupport@ferc.gov or call toll-free (866) 208-3676, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the addresses in item g.

    l. Individual desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    m. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    n. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “PROTESTS”, OR “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

    o. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filling comments, it will be assumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. E7-20289 Filed 10-15-07; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
10/16/2007
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E7-20289
Pages:
58657-58657 (1 pages)
Docket Numbers:
Project No. 2413-094
EOCitation:
of 2007-10-04
PDF File:
e7-20289.pdf