    Notice of Wetland Involvement for the Site Integrated Parking 
    Area/Access Road Project at the Fernald Environmental Management 
    Project (FEMP)
    
    AGENCY: U.S. Department of Energy.
    
    ACTION: Notice Of Wetland Involvement.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The U.S. Department of Energy (DOE) proposes to construct a 
    570-meter (1870-foot) long and 8-meter (26-foot) wide gravel road 
    within the non-radiologically contaminated area of the Fernald site 
    located approximately 29 kilometers (18 miles) northwest of downtown 
    Cincinnati, Ohio. The road will support site activities and provide 
    access to the proposed parking area providing a capacity for 280 
    vehicles.
        Construction of the proposed access road includes placement of a 
    121-centimeter (48-inch) corrugated metal pipe in a .01 hectare (.04 
    acre) section of an emergent wetland. The area will be backfilled with 
    152 cubic meters (200 cubic yards) of clean soil to the proposed road 
    elevation of 575 feet mean sea level (MSL). The maximum linear extent 
    of the proposed fill within the wetland would extend 15 meters (50 
    feet). Appropriate, erosion control devices (i.e., silt fences and 
    straw bales) will be implemented to mitigate the potential impacts to 
    wetland areas and other natural resources outside the project boundary.
    
    DATES: Comments are due to the address below November 2, 1994.
    
    ADDRESSES: Mail comments and requests for maps or further information 
    about this project to: Mr. Wally Quaider, Acting Associate Director, 
    Office of Safety, Operations and Technical Support, DOE Fernald Area 
    Office, P.O. Box 538705, Cincinnati, Ohio 45253-8705, Fax: (513) 648-
    3077.
    
    FOR FURTHER INFORMATION CONTACT: Ms. Carol Borgstrom, Director, Office 
    of NEPA Oversight, EH-25, U.S. Department of Energy, 1000 Independence 
    Avenue, SW., Washington, D.C. 20585, (202) 586-4600 or (800) 472-2756.
    
    SUPPLEMENTARY INFORMATION: The proposed action will provide access to a 
    new 91-meter (300-foot) by 131-meter (430-foot) gravel parking area 
    supporting Operable Unit 1 activities, the Operable Unit 4 
    Vitrification Pilot Plant Project, and future remedial activities for 
    the Operable Unit 2 Lime Sludge Ponds. The access road and parking area 
    will be equipped with fencing, lighting, and proper drainage devices. 
    In addition, a security guard post will be installed equipped with 
    accountability badge scanners.
        The proposed action will impact 0.01 hectares (0.04 acres) of a 
    larger emergent wetland [0.25 hectares (0.62 acres)] associated with an 
    unnamed tributary to Paddys Run Stream. The proposed road crossing has 
    been designed to minimize the restriction of normal and expected high 
    flows within the wetland channel. Impacts to the wetland area and other 
    natural resources outside the boundary of the project will be minimized 
    through the implementation of administrative and engineering controls 
    (i.e., erosion and siltation prevention devices). Consequently, impacts 
    resulting from the proposed action will be minimal.
        The wetland delineation for the project area was made during a 1993 
    wetland delineation report for the entire Fernald site. The delineation 
    was conducted using the Routine On-site Methodology, established in the 
    U.S. Army Corp of Engineers (ACOE) 1987 Wetland Delineation Manual and 
    was subsequently approved by the ACOE in August 1993. All drainage 
    ditches delineated as wetlands, within the FEMP site boundaries, occur 
    in Fincastle or Henshaw soils and exhibit soil colors and chromas 
    indicative of hydric situations. Furthermore, onsite drainage ditches 
    and swales support shrub and/or emergent vegetation. Broad-leaf cattail 
    (Tyoha latifolia) is the most common species found within site wetland 
    areas. Other species include yellow nutgrass (Cyperus esculentus), 
    green bulrush (Scirpus atrovirens), and swamp milkweed (Asclepias 
    incarnata).
        In accordance with DOE wetlands review requirements (10 CFR part 
    1022), DOE will prepare a wetlands assessment for this project.
    
        Issued this 30th day of September, 1994.
    Jack R. Craig,
    Acting Director, Fernald Area Office.
    [FR Doc. 94-25753 Filed 10-17-94; 8:45 am]
    BILLING CODE 6450-01-P
    
    
    

Document Information

Published:
10/18/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Action:
Notice Of Wetland Involvement.
Document Number:
94-25753
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: October 18, 1994