2011-26847. Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization  

  • Start Preamble

    Take notice that on October 3, 2011 Williston Basin Interstate Pipeline Company (Williston Basin), 1250 West Century Avenue, Bismarck, North Dakota 58503, filed in Docket No. CP12-2-000, a Prior Notice request pursuant to Sections 157.205 and 157.208 of the Commission's Regulations under the Natural Gas Act for authorization to abandon certain natural gas transmission facilities located in Dawson County, Montana. Specifically, Williston Basin proposes to abandon a 10.325 mile looped portion of its 12-inch diameter Cabin Creek to Williston line. Williston Basin intends to pig, purge, cap at each end and abandon the pipeline in-place and asserts that the abandonment of the pipeline and facilities is necessary due to the poor condition of the pipeline, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, (202) 502-8659.

    Any questions regarding this Application should be directed to Keith A. Tiggelar, Director of Regulatory Affairs, Williston Basin Interstate Pipeline Company, 1250 West Century Avenue, Bismark, North Dakota 58503, or call (701) 530-1560 or by e-mail keith.tiggelaar@wbip.com.

    Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission's staff may, pursuant to section 157.205 of the Commission's Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter's will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with he Commission's environmental review process. Environmental commenter's will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and ill not have the right to seek court review of the Commission's final order.

    The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “e-Filing” link.

    Start Signature

    Dated: October 11, 2011.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2011-26847 Filed 10-17-11; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
10/18/2011
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2011-26847
Pages:
64343-64343 (1 pages)
Docket Numbers:
Docket No. CP12-2-000
PDF File:
2011-26847.pdf