2011-26983. Sunshine Act Meeting Notice  

  • Start Preamble October 13, 2011.

    The following notice of meeting is published pursuant to section 3(a) of the Start Printed Page 64342government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C. 552b:

    AGENCY HOLDING MEETING:

    Federal Energy Regulatory Commission.

    DATE AND TIME:

    October 20, 2011, 10 a.m.

    PLACE:

    Room 2C, 888 First Street, NE., Washington, DC 20426.

    STATUS:

    Open.

    MATTERS TO BE CONSIDERED:

    Agenda.

    * NOTE—Items listed on the agenda may be deleted without further notice.

    CONTACT PERSON FOR MORE INFORMATION:

    Kimberly D. Bose, Secretary, Telephone (202) 502-8400.

    For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.

    974th—Meeting, Regular Meeting, October 20, 2011, 10 a.m.

    Item No.Docket No.Company
    ADMINISTRATIVE
    A-1AD02-1-000Agency Business Matters.
    A-2AD02-7-000Customer Matters, Reliability, Security and Market Operations.
    A-3AD05-9-001Winter 2011-12 Market Reliability Assessment.
    ELECTRIC
    E-1RM11-17-000Enhancement of Electricity Market Surveillance and Analysis through Ongoing Electronic Delivery of Data from Regional Transmission Organizations and Independent System Operators.
    E-2RM11-18-000Transmission Planning Reliability Standards.
    E-3RM11-20-000Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards.
    E-4RR11-7-000North American Electric Reliability Corporation.
    E-5OMITTED
    E-6RD11-9-000North American Electric Reliability Coporation.
    E-7RD11-8-000North American Electric Reliability Corporation.
    E-8NP10-160-001North American Electric Reliability Corporation.
    E-9EL05-121-006PJM Interconnection, L.L.C.
    E-10ER10-1401-001, ER10-2191-001, ER11-2705-000 ER11-2705-001California Independent System Operator Corporation
    EL10-76-001Green Energy Express LLC and 21st Century Transmission Holdings, LLC.
    E-11ER10-1791-001, ER10-1791-002Midwest Independent Transmission System Operator, Inc.
    E-12ER10-1069-001Southwest Power Pool, Inc.
    E-13ER11-3627-000Southwest Power Pool, Inc.
    E-14ER11-4358-000Southern California Edison Company.
    ER11-4512-000California Independent System Operator Corporation.
    E-15ER11-4375-000City of Pasadena, California.
    E-16ER11-3735-000Puget Sound Energy, Inc.
    E-17ER11-3881-000, ER11-3881-001New York Independent System Operator, Inc.
    E-18ER11-3891-000ISO New England Inc.
    E-19ER09-1050-006, ER09-1192-005, ER11-121-000Southwest Power Pool, Inc.
    E-20EL11-54-000Buckeye Power, Inc. v. American Transmission Systems, Incorporated.
    E-21ER11-2895-000, ER11-2895-001, ER11-3585-000Duke Energy Carolinas, LLC.
    E-22EL11-30-000E.ON Climate & Renewables North America, LLC v. Midwest Independent Transmission System Operator, Inc.
    E-23ER10-1706-001, ER10-1706-002California Independent System Operator Corporation.
    E-24ER03-563-067Devon Power LLC.
    E-25EL01-88-007Louisiana Public Service Commission v. Entergy Services, Inc.
    E-26EL01-88-008Louisiana Public Service Commission v. Entergy Services, Inc.
    E-27EL09-50-000Louisiana Public Service Commission v. Entergy Corporation, Entergy Services, Inc., Entergy Louisiana, L.L.C., Entergy Arkansas, Inc., Entergy Mississippi, Inc., and Entergy New Orleans, Inc.
    E-28RM11-7-000, AD10-11-000Frequency Regulation Compensation in the Organized Wholesale Power Markets.
    GAS
    G-1AC10-22-004, AC10-22-000, AC10-22-001, AC10-22-003Colorado Interstate Gas Company.
    G-2RP11-60-002, RP11-60-003Southern Natural Gas Company.
    G-3RP11-1538-001Natural Gas Supply Association, American Forest and Paper Association, American Public Gas Association, Independent Petroleum Association of America, and Process Gas Consumers Group.
    HYDRO
    H-1P-12626-003, P-12717-003Northern Illinois Hydropower, LLC.
    H-2P-2677-020City of Kaukauna, Wisconsin.
    Start Printed Page 64343
    H-3P-14105-000Kahawai Power 4, LLC.
    P-14203-000Kekaha Ditch Hydro, LLC.
    H-4P-9202-177Upper Yampa Water Conservancy District.
    H-5P-2210-212Appalachian Power Company.
    CERTIFICATES
    C-1CP11-128-000, CP11-133-000National Fuel Gas Supply Corporation Tennessee Gas Pipeline Company.
    C-2CP11-1-001, RP11-2201-000Pine Prairie Energy Center, LLC.
    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature

    A free webcast of this event is available through http://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to http://www.ferc.gov' s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.

    Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

    End Preamble

    [FR Doc. 2011-26983 Filed 10-14-11; 11:15 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
10/18/2011
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2011-26983
Pages:
64341-64343 (3 pages)
EOCitation:
of 2011-10-13
PDF File:
2011-26983.pdf