2021-22529. Notice of Final State Agency Actions Under 23 U.S.C. 327 on the North-South Corridor U.S. Route 60 to Interstate 10 in Pinal County, AZ
-
Start Preamble
AGENCY:
Federal Highway Administration (FHWA), Department of Transportation (DOT).
ACTION:
Notice.
SUMMARY:
The FHWA, on behalf of the Arizona Department of Transportation (ADOT), is issuing this notice to announce actions taken by ADOT and other relevant Federal agencies that are final. The actions relate to the Tier 1 Final Environmental Impact Statement (FEIS) and Record of Decision (ROD)—for the proposed project North-South Corridor U.S. Route 60 to Interstate 10 in Pinal County, AZ. The actions grant licenses, permits, and approvals for the project.
DATES:
By this notice, FHWA, on behalf of ADOT, is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions with authority on the highway project will be barred unless the claim is filed on or before March 17, 2022. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Mr. Steven Olmsted, NEPA Assignment Manager, Environment Planning, Arizona Department of Transportation, 205 S 17th Avenue, MD EM02, Phoenix, Arizona 85007; telephone: (480) 202-6050, email: solmsted@azdot.gov. The Arizona Department of Transportation normal business hours are 8:00 a.m. to 4:30 p.m. (Mountain Standard Time).
You may also contact: Mr. Paul O'Brien, Environmental Planning Administrator, Arizona Department of Transportation, 205 S 17th Avenue, MD EM02, Phoenix, Arizona 85007; telephone: (480) 356-2893, email: POBrien@azdot.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Effective April 16, 2019, the FHWA assigned and Start Printed Page 57734 ADOT assumed environmental responsibilities for this project pursuant to 23 U.S.C. 327 and a Memorandum of Understanding executed by FHWA and ADOT.
Notice is hereby given that ADOT and other relevant Federal agencies have taken final agency actions by issuing licenses, permits, and approvals for the following project in the State of Arizona—North-South Corridor U.S. Route 60 to Interstate 10 in Pinal County, AZ. The actions by ADOT and other relevant Federal agencies and the laws under which such actions were taken, are described in the Tier 1 Draft EIS approved on September 6, 2019, Tier 1 FEIS approved within the ROD issued on August 6, 2021, and in other documents in the administrative record. The FEIS, ROD, and other project records are available by contacting ADOT at the addresses provided above. Project information is also available online at: https://azdot.gov/planning/transportation-studies/north-south-corridor-study-proposed-new-transportation-route-pinal .
This notice applies to all ADOT and other relevant Federal agency decisions as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to:
1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109].
2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)].
3. Land: Section 4(f) of the US Department of Transportation Act of 1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers) [23 U.S.C. 319].
4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and Section 1536], Marine Mammal Protection Act [16 U.S.C. 1361], Fish and Wildlife Coordination Act [16 U.S.C. 661-667(d)], Migratory Bird Treaty Act [16 U.S.C. 703-712].
5. Historic and Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended [16 U.S.C. 470(f) et seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C. 470(aa)-11]; Archeological and Historic Preservation Act [16 U.S.C. 469-469(c)]; Native American Grave Protection and Repatriation Act (NAGPRA) [25 U.S.C. 3001-3013].
6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000(d)-2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].
7. Wetlands and Water Resources: Land and Water Conservation Fund (LWCF) [16 U.S.C. 4601-4604]; Safe Drinking Water Act (SDWA) [42 U.S.C. 300(f)-300(j)(6)]; Rivers and Harbors Act of 1899 [33 U.S.C. 401-406]; Wild and Scenic Rivers Act [16 U.S.C. 1271-1287]; Emergency Wetlands Resources Act [16 U.S.C. 3921, 3931]; Flood Disaster Protection Act [42 U.S.C. 4001-4128].
8. Water: Clean Water Act 33 U.S.C. 1251-1387.
9. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America; E.O. 13175 Consultation and Coordination with Indian Tribal Governments; E.O. 11514 Protection and Enhancement of Environmental Quality; E.O. 13112 Invasive Species.
(Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction.)
Authority: 23 U.S.C. 139(l)(1).
Start SignatureIssued on: October 12, 2021.
Karla S. Petty,
Arizona Division Administrator, Phoenix, Arizona.
[FR Doc. 2021-22529 Filed 10-15-21; 8:45 am]
BILLING CODE P
Document Information
- Published:
- 10/18/2021
- Department:
- Federal Highway Administration
- Entry Type:
- Notice
- Action:
- Notice.
- Document Number:
- 2021-22529
- Dates:
- By this notice, FHWA, on behalf of ADOT, is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions with authority on the highway project will be barred unless the claim is filed on or before March 17, 2022. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.
- Pages:
- 57733-57734 (2 pages)
- PDF File:
- 2021-22529.pdf
- Supporting Documents:
- » Final Federal Agency Actions: Proposed Highway in California
- » Final Federal Agency Actions: Proposed Highway Projects in Texas
- » Transfer and Sanction Programs
- » Experimental Project To Evaluate Proposals for Delegation of Certain Program-Wide FHWA Responsibilities to States
- » Environmental Impact Statements; Availability, etc.: Multiple Counties in Alabama; Rescission
- » Federal Agency Actions: SH 205 From North of John King (Rockwall County Line) to SH 78 in Collin County, TX
- » Federal Agency Actions: Interstate 95 in City of Fredericksburg and Counties of Spotsylvania, Stafford, Prince William, and Fairfax, VA
- » Environmental Impact Statements; Availability, etc.: I-495 and I-270 Managed Lanes Study, Montgomery and Prince George's Counties, MD and Fairfax County, VA
- » Federal Agency Actions: Proposed Highway in California
- » Federal Agency Actions: California; Proposed Highway