Central Rivers Power NH, LLC Project No. 2287–053. Great Lakes Hydro America, LLC Project No. 2300–052. Project No. 2311–067. Project No. 2326–054. Project No. 2327–047. Project No. 2422–058. Project No. 2423–031. On July 29, 2022, Central Rivers Power, NH LLC filed applications for new major licenses for the 15-megawatt (MW) J. Brodie Smith Hydroelectric Project and the 2.2–MW Gorham Hydroelectric Project. On August 1, 2022, Great Lakes Hydro America, LLC filed applications for new major licenses for the 3.7–MW Shelburne Hydroelectric Project, the 4.8–MW Upper Gorham Hydroelectric Project, the 3.2–MW Cross Power Hydroelectric Project, the 7.9–MW Cascade Hydroelectric Project, the 3.2–MW Sawmill Hydroelectric Project, and the 7.9–MW Riverside Hydroelectric Project. The projects are located on the Androscoggin River in Coos County, New Hampshire. No Federal or Tribal lands occur within or adjacent to the project boundaries.
In accordance with the Commission's regulations, on July 26, 2023, Commission staff issued a notice that the projects were ready for environmental analysis (REA Notice). Based on the information in the record, including comments filed on the REA Notice, staff does not anticipate that licensing the projects would constitute a major Federal action significantly affecting the quality of the human environment. Therefore, staff will prepare a draft and final Environmental Assessment (EA) for each of the eight projects.
The EAs will be issued and circulated for review by all interested parties. All comments filed on the EAs will be analyzed by staff and considered in the Commission's final licensing decision. Start Printed Page 71851
The applications will be processed according to the following schedule. Revisions to the schedule may be made as appropriate.
Milestone Target date Commission issues draft EAs February 2024. Comments on draft EAs April 2024. Commission issues final EAs September 2024.1 Any questions regarding this notice may be directed to Ryan Hansen at (202) 502–8074 or ryan.hansen@ferc.gov.
Start SignatureDated: October 12, 2023.
Kimberly D. Bose,
Secretary.
Footnotes
1. The Council on Environmental Quality's (CEQ) regulations under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 year of the Federal action agency's decision to prepare an EA. This notice establishes the Commission's intent to prepare a draft and final EA for each of the eight projects. Therefore, in accordance with CEQ's regulations, the final EAs must be issued within 1 year of the issuance date of this notice.
Back to Citation[FR Doc. 2023–22981 Filed 10–17–23; 8:45 am]
BILLING CODE 6717–01–P
Document Information
- Published:
- 10/18/2023
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2023-22981
- Pages:
- 71850-71851 (2 pages)
- PDF File:
- 2023-22981.pdf