2024-23948. Large Loads Co-Located at Generating Facilities; Third Supplemental Notice of Commissioner-Led Technical Conference  

  • PJM Interconnection, L.L.C Docket Nos. ER24-2172-000; ER24-2172-001.
    Atlantic City Electric Company Docket No. ER24-2888-000.
    Baltimore Gas and Electric Company Docket No. ER24-2889-000.
    Commonwealth Edison Company Docket No. ER24-2890-000.
    Delmarva Power & Light Company Docket No. ER24-2891-000.
    PECO Energy Company Docket No. ER24-2893-000.
    Potomac Electric Power Company Docket No. ER24-2894-000.
    PJM Interconnection, L.L.C Docket Nos. ER24-2447-000; ER24-2447-001.
    Baltimore Gas & Electric Company; PECO Energy Company Docket No. EL24-149-000.

Document Information

Published:
10/18/2024
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2024-23948
Pages:
83877-83878 (2 pages)
Docket Numbers:
Docket No. AD24-11-000
PDF File:
2024-23948.pdf