[Federal Register Volume 64, Number 201 (Tuesday, October 19, 1999)]
[Notices]
[Pages 56334-56335]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-27249]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket Nos. FE C&E 99-22, C&E 99-23, C&E 99-24 & C&E 99-25,
Certification Notice--180]
Office of Fossil Energy; Notice of Filings of Coal Capability of
Calpine Construction Finance Co., L.P., Powerplant and Industrial Fuel
Use Act
AGENCY: Office of Fossil Energy, Department of Energy.
ACTION: Notice of filing.
-----------------------------------------------------------------------
SUMMARY: Calpine Construction Finance Co., L.P., has submitted four
coal capability self-certifications pursuant to
[[Page 56335]]
section 201 of the Powerplant and Industrial Fuel Use Act of 1978, as
amended.
ADDRESSES: Copies of self-certification filings are available for
public inspection, upon request, in the Office of Coal & Power Im/Ex,
Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000
Independence Avenue, SW, Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT: Ellen Russell at (202) 586-9624.
SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial
Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.),
provides that no new baseload electric powerplant may be constructed or
operated without the capability to use coal or another alternate fuel
as a primary energy source. In order to meet the requirement of coal
capability, the owner or operator of such facilities proposing to use
natural gas or petroleum as its primary energy source shall certify,
pursuant to FUA section 201(d), to the Secretary of Energy prior to
construction, or prior to operation as a base load powerplant, that
such powerplant has the capability to use coal or another alternate
fuel. Such certification establishes compliance with section 201(a) as
of the date filed with the Department of Energy. The Secretary is
required to publish a notice in the Federal Register that a
certification has been filed. The following owners/operators of the
proposed new baseload powerplants have filed a self-certification in
acccordance with section 201(d).
Owner: Calpine Construction Finance Company, L.P. (C&E 99-22).
Operator: Calpine Corporation.
Location: Mohave Valley, AZ.
Plant Configuration: Gas-fired, combined-cycle.
Capacity: 545 MW.
Fuel: Natural gas.
Purchasing Entities: To be determined.
In-Service Date: May 1, 2001.
Owner: Calpine Construction Finance Company, L.P. (C&E 99-23).
Operator: Calpine Eastern Corporation.
Location: Westbrook, ME.
Plant Configuration: Gas-fired, combined-cycle.
Capacity: 545 MW.
Fuel: Natural gas.
Purchasing Entities: To be determined.
In-Service Date: January 1, 2001.
Owner: Calpine Construction Finance Company, L.P. (C&E 99-24).
Operator: Calpine Corporation.
Location: Yuba City, CA.
Plant Configuration: Gas-fired, combined-cycle.
Capacity: 545 MW.
Fuel: Natural gas.
Purchasing Entities: To be determined.
In-Service Date: April 1, 2001.
Owner: Calpine Construction Finance Company, L.P. (C&E 99-25).
Operator: Calpine Central, L.P.
Location: Edinburg, Hidalgo County, TX.
Plant Configuration: Gas-fired, combined-cycle.
Capacity: 730 MW.
Fuel: Natural gas.
Purchasing Entities: 250-400 MW will be sold to Magic Valley
Electric Cooperative, Inc. Sale of balance of output to be determined.
In-Service Date: April 1, 2001.
Issued in Washington, DC, October 5, 1999.
Anthony J. Como,
Deputy Director, Electric Power Regulation, Office of Coal & Power Im/
Ex, Office of Coal & Power Systems, Office of Fossil Energy.
[FR Doc. 99-27249 Filed 10-18-99; 8:45 am]
BILLING CODE 6450-01-P