95-24407. Northeast Nuclear Energy Company; Notice of Withdrawal of Application for Amendment to Facility Operating License  

  • [Federal Register Volume 60, Number 190 (Monday, October 2, 1995)]
    [Notices]
    [Pages 51504-51505]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-24407]
    
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket No. 50-336]
    
    
    Northeast Nuclear Energy Company; Notice of Withdrawal of 
    Application for Amendment to Facility Operating License
    
        The U.S. Nuclear Regulatory Commission (the Commission) has granted 
    the request of Northeast Nuclear Energy Company (the licensee) to 
    withdraw its December 16, 1994, application for proposed amendment to 
    Facility Operating License No. DPR-65 for the Millstone Nuclear Power 
    Station, Unit No. 2 located in New London County, Connecticut.
        The proposed amendment would have revised the Technical 
    Specifications to require the wind direction and wind speed sensors at 
    the 142 foot elevation to identify the data to determine action 
    required to preclude flood damage to the Service Water Pumps. Also the 
    proposed change would have corrected a typographical error in the 
    location of the sensors at the 374 foot elevation.
        The Commission had previously issued a Notice of Consideration of 
    Issuance of Amendment published in the Federal Register on February 1, 
    1995 (60 FR 6303). However, by letter dated September 18, 1995, the 
    licensee withdrew the proposed change.
        For further details with respect to this action, see the 
    application for amendment dated December 16, 1994, and the licensee's 
    letter dated September 18, 1995, which withdrew the application for 
    license amendment. The above documents are available for public 
    inspection at the Commission's Public Document Room, the Gelman 
    Building, 2120 L Street, NW., Washington, DC, and at the local public 
    document room located at the Learning Resource Center, Three Rivers 
    Community-Technical College, Thames 
    
    [[Page 51505]]
    Valley Campus, 574 New London Turnpike, Norwich, CT 06360.
    
        Dated at Rockville, Maryland, this 25th day of September 1995.
    
        For the Nuclear Regulatory Commission.
    Guy S. Vissing,
    Senior Project Manager, Project Directorate I-3, Division of Reactor 
    Projects--I/II, Office of Nuclear Reactor Regulation.
    [FR Doc. 95-24407 Filed 9-29-95; 8:45 am]
    BILLING CODE 7590-01-P
    
    

Document Information

Published:
10/02/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-24407
Pages:
51504-51505 (2 pages)
Docket Numbers:
Docket No. 50-336
PDF File:
95-24407.pdf