95-24459. Northeast Utilities Service Company, et al. Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 190 (Monday, October 2, 1995)]
    [Notices]
    [Pages 51461-51463]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-24459]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. ER92-766-004, et al.]
    
    
    Northeast Utilities Service Company, et al. Electric Rate and 
    Corporate Regulation Filings
    
    September 22, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Northeast Utilities Service Company
    
    Docket No. ER92-766-004
    
        Take notice that on August 31, 1995, Northeast Utilities Company 
    (NU) tendered for filing a Notice of Termination of NU's Transmission 
    Service Tariff No. 4.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. PowerNet Corporation
    
    [Docket No. ER94-931-005]
    
        Take notice that on September 6, 1995, PowerNet Corporation 
    (PowerNet) filed certain information as required by the Commission's 
    April 22, 1994, order in Docket No. ER94-931-000. Copies of PowerNet's 
    informational filing are on file with he Commission and are available 
    for public inspection.
    
    3. Iowa-Illinois Gas and Electric Company
    
    [Docket No. ER95-490-000]
    
        Take notice that MidAmerican Energy Company (MidAmerican), One 
    River Center Place 106 East Second Street, P.O. Box 4350, Davenport, 
    Iowa 52808, as successor in interest by merger to Iowa-Illinois Gas and 
    Electric Company (Iowa-Illinois) on September 8, 1935, tendered for 
    filing, pursuant to Section 205 of the Federal Power Act and Sections 
    2.25, 35.13 and 35.23 of the Commission's Rules and Regulations, an 
    amended abbreviated filing consisting allowances in coordination rates 
    as authorized by the Commission's Policy statement and Interim Rule 
    issued on December 15, 1994 in Docket No. PL95-1-000.
        MidAmerican states that it is submitting this amended filing for 
    the purpose of conforming the recovery mechanism previously filed by 
    Iowa-Illinois in this proceeding to the recovery mechanism accepted for 
    filing in Docket ER95-486-001 for MidAmerican's other predecessor by 
    merger, Midwest Power Systems, Inc. MidAmerican states that the revised 
    recovery mechanism will provide consistency in the application of the 
    mechanism in all of MidAmerican's coordination rates. 
    
    [[Page 51462]]
    
        MidAmerican states that this rate schedule change applies to 
    various coordination agreements entered into by Iowa-Illinois with 
    Commonwealth Edison Company, Illinois Power Company, Union Electric 
    Company, City of Geneseo (Illinois), Illinois Municipal Electric 
    Agency, Wisconsin Power & Light Company, Waverly Municipal Electric 
    Utility, City of Tipton (Iowa), City of Pella (Iowa), Eldrige Electric 
    and Water Utility Board and the members of the Mid-Continent Area Power 
    Pool.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Entergy Power Inc.
    
    [Docket No. ER95-1336-000]
    
        Take notice that Entergy Power, Inc. (EPI) on September 11, 1995, 
    tendered for filing Amendment to an Interchange Agreement with East 
    Texas Electric Cooperative, Inc.
        EPI requests an effective date for the Amendment that is one (1) 
    day after the date of filing of the Interchange Agreement, and 
    respectfully requests waiver of the notice requirements specified in 
    Section 35.11 of the Commission's regulations.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Central Illinois Public Service Company
    
    [Docket No. ER95-1350-000]
    
        Take notice that on September 5, 1995 Central Illinois Public 
    Service Company tendered for filing an amendment in the above-
    referenced docket.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Portland General Electric Company
    
    [Docket No. ER95-1692-000]
    
        Take notice that Portland General Electric Company (PGE) on 
    September 5, 1995, tendered for filing a Revision No. 4 to Exhibit C of 
    the General Transfer Agreement for Integration of Resources between the 
    Bonneville Power Administration and PGE, Contract No. DE-MS79-
    89BP92273, (Portland General Electric Rate Schedule FERC No. 185).
        The BPA and PGE mutually agreed to revise Exhibit C to the General 
    Transfer Agreement for Integration of Resources to accommodate service 
    the Eugene Water and Electric Board under PGE's FERC Electric Tariff, 
    1st Revised Volume No. 2 at the Alvey Substation and revise the Use-of-
    Facility Charge for the Forest Grove Substation Point of Delivery.
        Copies of the filing have been served on the parties included in 
    the filing letter.
        PGE respectfully requests that the Commission grant waiver of the 
    notice requirements to allow Revision No. 4 to Exhibit C of the General 
    Transfer Agreement for Integration of Resources to become effective as 
    of August 1, 1995.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Consolidated Edison Company of New York, Inc.
    
    Docket No. ER95-1694-000
    
        Take notice that on September 5, 1995, Consolidated Edison Company 
    of New York, Inc. (Con Edison) tendered for filing a Supplement to its 
    Rate Schedule, Con Edison Rate Schedule FERC No. 2, a facilities 
    agreement with Central Hudson Gas and Electric Corporation (CH). The 
    Supplement provides for a decrease in the monthly carrying charges. Con 
    Edison has requested that this decrease take effect as of August 1, 
    1995.
        Con Edison states that a copy of this filing has been served by 
    mail upon CH.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Central Illinois Public Service Company
    
    [Docket No. ER95-1736-000]
    
        Take notice that on September 12, 1995, Central Illinois Public 
    Service Company (CIPS) submitted a Service Agreement, dated September 
    1, 1995, establishing Engelhard Power Marketing, Inc. (Engelhard) as a 
    customer under the terms of CIPS' Coordination Sales Tariff CST-1 (CST-
    1 Tariff).
        CIPS requests an effective date of September 1, 1995, for the 
    service agreement with Engelhard. Accordingly, CIPS requests waiver of 
    the Commission's notice requirements. Copies of this filing were served 
    upon Engelhard and the Illinois Commerce Commission.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Maine Public Service Company
    
    [Docket No. ER95-1737-000]
    
        Take notice that on September 12, 1995, Maine Public Service 
    Company submitted an agreement under its Umbrella Power Sales tariff.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Cogentrix Energy Power Marketing, Inc.
    
    [Docket No. ER95-1739-000]
    
        Take notice that on September 11, 1995, Cogentrix Energy Power 
    Marketing, Inc. (CEPM), a North Carolina corporation, petitioned the 
    Commission for acceptance of CEPM's Rate Schedule FERC No. 1, providing 
    for the sale of electricity at market-based rates; the granting of 
    certain blanket approvals; and the waiver of certain Commission 
    regulations. CEPM is a wholly-owned indirect subsidiary of Cogentrix 
    Energy, Inc., a developer, owner, and operator of Independent power 
    facilities.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Equitable Power Services Company
    
    [Docket No. ER95-1740-000]
    
        Take notice that on September 12, 1995, Equitable Power Service 
    Company (EPSC), tendered for filing a letter from the Executive 
    Committee of the Western Systems Power Pool (WSPP) indicating that EPSC 
    had completed all the steps for pool membership. EPSC requests that the 
    Commission amend the WSPP Agreement to include it as a member.
        EPSC requests an effective date of September 13, 1995 for the 
    proposed amendment. Accordingly, EPSC requests waiver of the 
    Commission's notice of requirements for good cause shown.
        Copies of the filing were served upon the WSPP Executive Committee.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Entergy Services, Inc.
    
    [Docket No. ER95-1741-000]
    
        Take notice that on September 12, 1995, Entergy Services, Inc. 
    (ESI), acting as agent for Arkansas Power & Light Company (AP&L), Gulf 
    States Utilities Company (GSU), Louisiana Power & Light Company (LP&L), 
    Mississippi Power & Light Company (MP&L), New Orleans Public Service 
    Inc. (NOPSI) (collectively the Entergy Operating Companies) tendered 
    for filing an Interchange Agreement between Byng Public Works Authority 
    and the Entergy Operating Companies, pursuant to which the Parties 
    propose to provide each other with mutual support services, including 
    General Purpose Energy. Entergy Services requests an effective date of 
    no later than November 10, 1995.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice. 
    
    [[Page 51463]]
    
    
    13. Minnesota Power & Light Company
    
    [Docket No. ER95-1651-000]
    
        Take notice that on August 28, 1995, Minnesota Power & Light 
    Company tendered for filing signed Service Agreements with Citizens 
    Lehman Power Sales, ENRON Power Marketing Inc., Grand River Dam 
    Authority, InterCoast Power Marketing, and Utility 2000 Energy 
    Corporation, under its Wholesale Coordination Sales Tariff to satisfy 
    its filing requirements under this tariff.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Jersey Central Power & Light Company, Metropolitan Edison 
    Company, and Pennsylvania Electric Company
    
    [Docket No. ER95-1693-000]
    
        Take notice that on September 5, 1995, GPU Service Corporation 
    (GPU), on behalf of Jersey Central Power & Light Company, (jointly 
    refereed to as the ``GPU Operating Companies''), filed an executed 
    Service Agreement between GPU and Phibro Inc. (PHI), dated August 23, 
    1995. This Service Agreement specifies that PHI has agreed to the 
    rates, terms and conditions of the GPU Operating Companies' Operating 
    Capacity and/or Energy Sales Tariff (``Sales Tariff'') designated as 
    FERC Electric Tariff, Original Volume No. 1. The sales Tariff was 
    accepted by the Commission by letter order issued on February 10, 1995 
    in Jersey Central Power & Light Co., Metropolitan Edison Co. and 
    Pennsylvania Electric Co., [Docket No. ER95-276-000 and allows GPU and 
    PHI to enter into separately scheduled transactions under which the GPU 
    Operating Companies will make available for sale, surplus operating 
    capacity and/or energy at negotiated rates that are no higher than the 
    GPU Operating Companies' cost of service.
        GPU requests a waiver of the Commission's notice requirements for 
    good cause shown and an effective date of August 23, 1995 for the 
    Service Agreement.
        GPU has served copies of the filing on regulatory agencies in New 
    Jersey and Pennsylvania.
        Comment date: October 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-24459 Filed 9-29-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
10/02/1995
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
95-24459
Dates:
October 6, 1995, in accordance with Standard Paragraph E at the end of this notice.
Pages:
51461-51463 (3 pages)
Docket Numbers:
Docket No. ER92-766-004, et al.
PDF File:
95-24459.pdf