[Federal Register Volume 60, Number 190 (Monday, October 2, 1995)]
[Notices]
[Pages 51461-51463]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-24459]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER92-766-004, et al.]
Northeast Utilities Service Company, et al. Electric Rate and
Corporate Regulation Filings
September 22, 1995.
Take notice that the following filings have been made with the
Commission:
1. Northeast Utilities Service Company
Docket No. ER92-766-004
Take notice that on August 31, 1995, Northeast Utilities Company
(NU) tendered for filing a Notice of Termination of NU's Transmission
Service Tariff No. 4.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
2. PowerNet Corporation
[Docket No. ER94-931-005]
Take notice that on September 6, 1995, PowerNet Corporation
(PowerNet) filed certain information as required by the Commission's
April 22, 1994, order in Docket No. ER94-931-000. Copies of PowerNet's
informational filing are on file with he Commission and are available
for public inspection.
3. Iowa-Illinois Gas and Electric Company
[Docket No. ER95-490-000]
Take notice that MidAmerican Energy Company (MidAmerican), One
River Center Place 106 East Second Street, P.O. Box 4350, Davenport,
Iowa 52808, as successor in interest by merger to Iowa-Illinois Gas and
Electric Company (Iowa-Illinois) on September 8, 1935, tendered for
filing, pursuant to Section 205 of the Federal Power Act and Sections
2.25, 35.13 and 35.23 of the Commission's Rules and Regulations, an
amended abbreviated filing consisting allowances in coordination rates
as authorized by the Commission's Policy statement and Interim Rule
issued on December 15, 1994 in Docket No. PL95-1-000.
MidAmerican states that it is submitting this amended filing for
the purpose of conforming the recovery mechanism previously filed by
Iowa-Illinois in this proceeding to the recovery mechanism accepted for
filing in Docket ER95-486-001 for MidAmerican's other predecessor by
merger, Midwest Power Systems, Inc. MidAmerican states that the revised
recovery mechanism will provide consistency in the application of the
mechanism in all of MidAmerican's coordination rates.
[[Page 51462]]
MidAmerican states that this rate schedule change applies to
various coordination agreements entered into by Iowa-Illinois with
Commonwealth Edison Company, Illinois Power Company, Union Electric
Company, City of Geneseo (Illinois), Illinois Municipal Electric
Agency, Wisconsin Power & Light Company, Waverly Municipal Electric
Utility, City of Tipton (Iowa), City of Pella (Iowa), Eldrige Electric
and Water Utility Board and the members of the Mid-Continent Area Power
Pool.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
4. Entergy Power Inc.
[Docket No. ER95-1336-000]
Take notice that Entergy Power, Inc. (EPI) on September 11, 1995,
tendered for filing Amendment to an Interchange Agreement with East
Texas Electric Cooperative, Inc.
EPI requests an effective date for the Amendment that is one (1)
day after the date of filing of the Interchange Agreement, and
respectfully requests waiver of the notice requirements specified in
Section 35.11 of the Commission's regulations.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
5. Central Illinois Public Service Company
[Docket No. ER95-1350-000]
Take notice that on September 5, 1995 Central Illinois Public
Service Company tendered for filing an amendment in the above-
referenced docket.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
6. Portland General Electric Company
[Docket No. ER95-1692-000]
Take notice that Portland General Electric Company (PGE) on
September 5, 1995, tendered for filing a Revision No. 4 to Exhibit C of
the General Transfer Agreement for Integration of Resources between the
Bonneville Power Administration and PGE, Contract No. DE-MS79-
89BP92273, (Portland General Electric Rate Schedule FERC No. 185).
The BPA and PGE mutually agreed to revise Exhibit C to the General
Transfer Agreement for Integration of Resources to accommodate service
the Eugene Water and Electric Board under PGE's FERC Electric Tariff,
1st Revised Volume No. 2 at the Alvey Substation and revise the Use-of-
Facility Charge for the Forest Grove Substation Point of Delivery.
Copies of the filing have been served on the parties included in
the filing letter.
PGE respectfully requests that the Commission grant waiver of the
notice requirements to allow Revision No. 4 to Exhibit C of the General
Transfer Agreement for Integration of Resources to become effective as
of August 1, 1995.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
7. Consolidated Edison Company of New York, Inc.
Docket No. ER95-1694-000
Take notice that on September 5, 1995, Consolidated Edison Company
of New York, Inc. (Con Edison) tendered for filing a Supplement to its
Rate Schedule, Con Edison Rate Schedule FERC No. 2, a facilities
agreement with Central Hudson Gas and Electric Corporation (CH). The
Supplement provides for a decrease in the monthly carrying charges. Con
Edison has requested that this decrease take effect as of August 1,
1995.
Con Edison states that a copy of this filing has been served by
mail upon CH.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
8. Central Illinois Public Service Company
[Docket No. ER95-1736-000]
Take notice that on September 12, 1995, Central Illinois Public
Service Company (CIPS) submitted a Service Agreement, dated September
1, 1995, establishing Engelhard Power Marketing, Inc. (Engelhard) as a
customer under the terms of CIPS' Coordination Sales Tariff CST-1 (CST-
1 Tariff).
CIPS requests an effective date of September 1, 1995, for the
service agreement with Engelhard. Accordingly, CIPS requests waiver of
the Commission's notice requirements. Copies of this filing were served
upon Engelhard and the Illinois Commerce Commission.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
9. Maine Public Service Company
[Docket No. ER95-1737-000]
Take notice that on September 12, 1995, Maine Public Service
Company submitted an agreement under its Umbrella Power Sales tariff.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
10. Cogentrix Energy Power Marketing, Inc.
[Docket No. ER95-1739-000]
Take notice that on September 11, 1995, Cogentrix Energy Power
Marketing, Inc. (CEPM), a North Carolina corporation, petitioned the
Commission for acceptance of CEPM's Rate Schedule FERC No. 1, providing
for the sale of electricity at market-based rates; the granting of
certain blanket approvals; and the waiver of certain Commission
regulations. CEPM is a wholly-owned indirect subsidiary of Cogentrix
Energy, Inc., a developer, owner, and operator of Independent power
facilities.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
11. Equitable Power Services Company
[Docket No. ER95-1740-000]
Take notice that on September 12, 1995, Equitable Power Service
Company (EPSC), tendered for filing a letter from the Executive
Committee of the Western Systems Power Pool (WSPP) indicating that EPSC
had completed all the steps for pool membership. EPSC requests that the
Commission amend the WSPP Agreement to include it as a member.
EPSC requests an effective date of September 13, 1995 for the
proposed amendment. Accordingly, EPSC requests waiver of the
Commission's notice of requirements for good cause shown.
Copies of the filing were served upon the WSPP Executive Committee.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
12. Entergy Services, Inc.
[Docket No. ER95-1741-000]
Take notice that on September 12, 1995, Entergy Services, Inc.
(ESI), acting as agent for Arkansas Power & Light Company (AP&L), Gulf
States Utilities Company (GSU), Louisiana Power & Light Company (LP&L),
Mississippi Power & Light Company (MP&L), New Orleans Public Service
Inc. (NOPSI) (collectively the Entergy Operating Companies) tendered
for filing an Interchange Agreement between Byng Public Works Authority
and the Entergy Operating Companies, pursuant to which the Parties
propose to provide each other with mutual support services, including
General Purpose Energy. Entergy Services requests an effective date of
no later than November 10, 1995.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 51463]]
13. Minnesota Power & Light Company
[Docket No. ER95-1651-000]
Take notice that on August 28, 1995, Minnesota Power & Light
Company tendered for filing signed Service Agreements with Citizens
Lehman Power Sales, ENRON Power Marketing Inc., Grand River Dam
Authority, InterCoast Power Marketing, and Utility 2000 Energy
Corporation, under its Wholesale Coordination Sales Tariff to satisfy
its filing requirements under this tariff.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
14. Jersey Central Power & Light Company, Metropolitan Edison
Company, and Pennsylvania Electric Company
[Docket No. ER95-1693-000]
Take notice that on September 5, 1995, GPU Service Corporation
(GPU), on behalf of Jersey Central Power & Light Company, (jointly
refereed to as the ``GPU Operating Companies''), filed an executed
Service Agreement between GPU and Phibro Inc. (PHI), dated August 23,
1995. This Service Agreement specifies that PHI has agreed to the
rates, terms and conditions of the GPU Operating Companies' Operating
Capacity and/or Energy Sales Tariff (``Sales Tariff'') designated as
FERC Electric Tariff, Original Volume No. 1. The sales Tariff was
accepted by the Commission by letter order issued on February 10, 1995
in Jersey Central Power & Light Co., Metropolitan Edison Co. and
Pennsylvania Electric Co., [Docket No. ER95-276-000 and allows GPU and
PHI to enter into separately scheduled transactions under which the GPU
Operating Companies will make available for sale, surplus operating
capacity and/or energy at negotiated rates that are no higher than the
GPU Operating Companies' cost of service.
GPU requests a waiver of the Commission's notice requirements for
good cause shown and an effective date of August 23, 1995 for the
Service Agreement.
GPU has served copies of the filing on regulatory agencies in New
Jersey and Pennsylvania.
Comment date: October 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-24459 Filed 9-29-95; 8:45 am]
BILLING CODE 6717-01-P