E8-23230. Robert D. Willis Hydropower Rate Schedules  

  • Start Preamble

    AGENCY:

    Southwestern Power Administration, DOE.

    ACTION:

    Notice of rate order.

    SUMMARY:

    Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001.00C, effective January 31, 2007, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-59, which increases the power rate for the Robert Douglas Willis Hydropower Project (Willis) pursuant to the following Willis Rate Schedule:

    Rate Schedule RDW-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Municipal Power Agency (Contract No. DE-PM75-85SW00117)

    DATES:

    The effective period for the rate schedule specified in Rate Order No. SWPA-59 is October 1, 2008, through September 30, 2012.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. James K. McDonald, Assistant Administrator, Office of Corporate Operations, Southwestern Power Administration, Department of Energy, One West Third Street, Tulsa, Oklahoma 74103, (918) 595-6690, jim.mcdonald@swpa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The existing hydroelectric power rate for the Robert Douglas Willis project is $815,580 per year. The Federal Energy Regulatory Commission approved this rate on a final basis on February 23, 2007, in Docket EF-07-4081-000 for the period January 1, 2007, through September 30, 2010 (see 118 FERC ¶ 62150). The 2008 Willis Power Repayment Studies indicate the need for an increase in the annual rate by $113,808 or 14.0 percent beginning October 1, 2008.

    The Administrator, Southwestern Power Administration (Southwestern) has followed Title 10, Part 903 Subpart A, of the Code of Federal Regulations, “Procedures for Public Participation in Power and Transmission Rate Adjustments and Extensions” in connection with the proposed rate schedule. On August 5, 2008, Southwestern published notice in the Federal Register (73 FR 45435), of a 30-day comment period, together with a combined Public Information and Comment Forum, to provide an opportunity for customers and other interested members of the public to review and comment on a proposed rate increase for the Willis project. The public forum was canceled when no one expressed an intention to participate. Written comments were accepted through September 4, 2008. One comment was received from Gillis & Angley, Counsellors at Law, on behalf of Sam Rayburn Municipal Power Agency, Sam Rayburn Dam Electric Cooperative, and the Vinton Public Power Authority, which stated that they had no objection to the proposed rate adjustment.

    Information regarding this rate proposal, including studies and other supporting material, is available for public review and comment in the offices of Southwestern Power Administration, One West Third Street, Tulsa, Oklahoma 74103.

    Following review of Southwestern's proposal within the Department of Energy, I approved Rate Order No. SWPA-59, on an interim basis, which increases the existing Robert D. Willis rate to $929,388, per year, for the period October 1, 2008, through September 30, 2012.

    Start Signature

    Dated: September 25, 2008.

    Jeffrey Kupfer,

    Deputy Secretary.

    End Signature

    Deputy Secretary of Energy

    In the matter of: Southwestern Power Administration, Robert D. Willis Hydropower Project Rate; Order Confirming, Approving and Placing Increased Power Rate Schedule In Effect On an Interim Basis

    Pursuant to Sections 302(a) and 301(b) of the Department of Energy Organization Act, Public Law 95-91, the functions of the Secretary of the Interior and the Federal Power Commission under Section 5 of the Flood Control Act of 1944, 16 U.S.C. 825s, relating to the Southwestern Power Administration (Southwestern) were transferred to and vested in the Secretary of Energy. By Delegation Order No. 0204-108, effective December 14, 1983, the Secretary of Energy delegated to the Administrator of Southwestern the authority to develop power and transmission rates, delegated to the Deputy Secretary of the Department of Energy the authority to confirm, approve, and place in effect such rates on an interim basis and delegated to the Federal Energy Regulatory Commission (FERC) the authority to confirm and approve on a final basis or to disapprove rates developed by the Administrator under the delegation. Delegation Order No. 0204-108, as amended, was rescinded and subsequently replaced by Delegation Orders 00-037.00 (December 6, 2001) and 00-001-00C (January 23, 2007). The Deputy Secretary issued this rate order pursuant to said delegations.

    Background

    Dam B (Town Bluff Dam), located on the Neches River in eastern Texas downstream from the Sam Rayburn Dam, was originally constructed in 1951 by the U.S. Army Corps of Engineers (Corps) and provides streamflow regulation of releases from the Sam Rayburn Dam. The Lower Neches Valley Authority contributed funds toward construction of both projects and makes established annual payments for the right to withdraw up to 2000 cubic feet of water per second from Town Bluff Dam for its own use. Power was legislatively authorized at the project, but installation of hydroelectric facilities was deferred until justified by economic conditions. A determination of feasibility was made in a 1982 Corps study. In 1983, the Sam Rayburn Municipal Power Agency (SRMPA) proposed to sponsor and finance the development at Town Bluff Dam in return for the output of the project to be delivered to its member municipalities and participating member cooperatives of the Sam Rayburn Dam Electric Cooperative. Since the hydroelectric facilities at the Town Bluff Dam have been completed, the facilities have been renamed the Robert Douglas Willis Hydropower Project (Willis).

    The Willis rate is unique in that it excludes the costs associated with the hydropower design and construction performed by the Corps, because all funds for these costs were provided by SRMPA. Under the Southwestern/SRMPA power sales Contract No. DE-PM75-85SW00117, SRMPA will continue to pay all annual operating and marketing costs, as well as expected capital replacement costs, through the rate paid to Southwestern, and will receive all power and energy produced at the project for a period of 50 years.

    In the FERC Docket No. EF07-4081-000, issued February 23, 2007, for the period January 1, 2007, through September 30, 2010, the FERC confirmed and approved the current annual Willis rate of $815,580.

    Discussion

    Southwestern's Current PRS indicates that the existing annual power rate of Start Printed Page 57352$815,580 is insufficient to produce the annual revenues necessary to accomplish repayment as required by Section 5 of the Flood Control Act of 1944 and Department of Energy (DOE) Order No. RA 6120.2. The increased revenue requirement is due to an increase in the U.S. Army Corps of Engineers (Corps) projected operations and maintenance costs. The Revised PRS indicates that an increase in annual revenues of $113,808 beginning October 1, 2008, is sufficient to accomplish repayment of the Federal investment in the required number of years. Accordingly, Southwestern developed a proposed rate schedule based on that increased revenue requirement.

    Title 10, Part 903, Subpart A of the Code of Federal Regulations, “Procedures for Public Participation in Power and Transmission Rate Adjustments and Extensions,” has been followed in connection with the proposed rate adjustment. More specifically, opportunities for public review and comment during a 30-day period on the proposed Willis power rate were announced by a Federal Register (73 FR 45435) notice published on August 5, 2008. The combined Public Information and Comment Forum scheduled for August 13, 2008, in Tulsa, Oklahoma was canceled as no one expressed an intent to participate. Written comments were due by September 4, 2008. Southwestern provided the Federal Register notice, together with requested supporting data, to the customer and interested parties for review and comment during the formal period of public participation. In addition, prior to the formal 30-day public participation process, Southwestern discussed with the customer representatives the preliminary information on the proposed rate adjustment. Only one formal comment was received during the public process. That comment, on behalf of SRMPA, Sam Rayburn Dam Electric Cooperative, and the Vinton Public Power Authority, expressed no objection to the final proposed rate.

    Upon conclusion of the comment period in September 2008, Southwestern finalized the PRS and rate schedule for the proposed annual rate of $929,388 which is the lowest possible rate needed to satisfy repayment criteria. This rate represents an annual increase of 14.0 percent.

    Availability of Information

    Information regarding this rate increase, including studies and other supporting material, is available for public review and comment in the offices of Southwestern Power Administration, One West Third Street, Tulsa, Oklahoma 74103.

    Comments and Responses

    Southwestern received one written comment in which the customer representative expressed no objection to the proposed rate adjustment.

    Other Issues

    There were no other issues raised during the informal discussions or during the formal public participation period.

    Administrator's Certification

    The 2008 Revised Willis PRS indicates that the annual power rate of $929,388 will repay all costs of the project, including amortization of the power investment consistent with provisions of the Department of Energy (DOE) Order No. RA 6120.2. In accordance with Delegation Order Nos. 00-037.00 (December 6, 2001) and 00-001.00C (January 31, 2007), and Section 5 of the Flood Control Act of 1944, the Administrator has determined that the proposed Willis power rate is consistent with applicable law and the lowest possible rate consistent with sound business principles.

    Environment

    The environmental impact of the rate increase proposal was evaluated in consideration of DOE's guidelines for implementing the procedural provisions of the National Environmental Policy Act, 10 CFR 1021, and was determined to fall within the class of actions that are categorically excluded from the requirements of preparing either an Environmental Impact Statement or an Environmental Assessment.

    Order

    In view of the foregoing and pursuant to the authority delegated to me, I hereby confirm, approve and place in effect on an interim basis, for the period October 1, 2008, through September 30, 2012, the annual Robert Douglas Willis Hydropower Rate of $929,388 for the sale of power and energy from Robert Douglas Willis project to the Sam Rayburn Municipal Power Agency, under Contract No. DE-PM75-85SW00117, as amended. This rate shall remain in effect on an interim basis through September 30, 2012, or until the FERC confirms and approves the rate on a final basis.

    Start Signature

    Dated: September 25, 2008.

    Jeffrey Kupfer,

    Deputy Secretary.

    End Signature End Supplemental Information

    [FR Doc. E8-23230 Filed 10-1-08; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Comments Received:
0 Comments
Effective Date:
10/1/2008
Published:
10/02/2008
Department:
Southwestern Power Administration
Entry Type:
Notice
Action:
Notice of rate order.
Document Number:
E8-23230
Dates:
The effective period for the rate schedule specified in Rate Order No. SWPA-59 is October 1, 2008, through September 30, 2012.
Pages:
57351-57352 (2 pages)
Docket Numbers:
Rate Order No. SWPA-59
PDF File:
e8-23230.pdf
Supporting Documents:
» Integrated System Rate Schedules
» 2021 Continuation of Temporary Power Sales Program
» Rate Schedules: Integrated System, Sam Rayburn Dam, and Robert D. Willis
» Continuation of Temporary Power Sales Program
» Integrated System Rate Schedules
» Sam Rayburn Dam Rate Schedule
» Integrated System Power Rates
» Integrated System Rate Schedules
» Integrated System Rate Schedules
» Sam Rayburn Dam Project Power Rate,