97-27662. Florida Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 202 (Monday, October 20, 1997)]
[Notices]
[Pages 54448-54449]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-27662]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-12-000]
Florida Gas Transmission Company; Notice of Request Under Blanket
Authorization
October 14, 1997.
Take notice that on October 9, 1997, Florida Gas Transmission
Company (FGT), 1400 Smith Street, P.O. Box 1188, Houston, Texas 77251-
1188, filed in Docket No. CP98-12-000 a request pursuant to
Secs. 157.205 and 157.216 of the Commission's Regulations under the
Natural Gas Act (18 CFR 157.205, 157.216) for authorization to abandon
by sale certain facilities to Peoples Gas
[[Page 54449]]
System (PGS), under FGT's blanket certificate issued in Docket No.
CP82-553-000 pursuant to Section 7 of the Natural Gas Act, all as more
fully set forth in the request that is on file with the Commission and
open to public inspection.
FGT proposes to abandon by sale to PGS the following facilities:
(1) 1.7 miles of the 6-inch Miami Lateral from the outlet of M&R
Station-POI No. 16119 to the terminus, (2) 6.1 miles of 4-inch Green
Covet Springs Lateral and meter station site starting from the
connection on the Jacksonville Lateral to the terminus of the Lateral,
(3) the Sarasota PGS Lateral that consists of 5.7 miles of the 8-inch
Sarasota lateral downstream or South of FGT's Lateral Line Valve 25-6
through and including LLV25-7 at the terminus of the 8-inch lateral,
and the 633 feet of 3-inch lateral line from the 8-inch Sarasota
Lateral at MP 90.3 to the Sarasota M&R Station, and (4) the Sarasota
M&R Station, (with the exception of the EFM equipment that will be
removed and placed in FGT's inventory for future use).
FGT states that the abandonment will not result in any disruption
or disadvantage any of FGT's customers.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-27662 Filed 10-17-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 10/20/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-27662
- Pages:
- 54448-54449 (2 pages)
- Docket Numbers:
- Docket No. CP98-12-000
- PDF File:
-
97-27662.pdf