[Federal Register Volume 64, Number 202 (Wednesday, October 20, 1999)]
[Proposed Rules]
[Page 56476]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-27360]
========================================================================
Proposed Rules
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains notices to the public of
the proposed issuance of rules and regulations. The purpose of these
notices is to give interested persons an opportunity to participate in
the rule making prior to the adoption of the final rules.
========================================================================
Federal Register / Vol. 64, No. 202 / Wednesday, October 20, 1999 /
Proposed Rules
[[Page 56476]]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
10 CFR Part 50
[Docket No. PRM-50-61]
Nuclear Energy Institute; Withdrawal of Petition for Rulemaking
AGENCY: Nuclear Regulatory Commission.
ACTION: Withdrawal of petition for rulemaking.
-----------------------------------------------------------------------
SUMMARY: The Nuclear Regulatory Commission (NRC) has determined that a
petition for rulemaking submitted by the Nuclear Energy Institute (NEI)
(PRM-50-61), in which the petitioner requested that the NRC amend its
fire protection regulations, has effectively been withdrawn by NEI. In
subsequent correspondence with the NRC, the petitioner expressed a
change of position that obviated the need for a proposed rulemaking
requested by the petition. Specifically, the petitioner requested that
the NRC cancel the proposed fire protection rulemaking instead of
deferring it. As an alternative to the rulemaking requested in the
petition, the NRC, in cooperation with the National Fire Protection
Association (NFPA) and stakeholders, is pursuing the development of a
risk-informed, performance-based consensus standard for fire protection
at nuclear power plants. If the consensus standard is successfully
developed, the NRC may adopt it in a future rulemaking as an
alternative method of meeting the NRC fire protection requirements.
Accordingly, the NRC is not taking any further action on the petition
since it has, in effect, been withdrawn by the petitioner.
ADDRESSES: Copies of the petition for rulemaking, the public comments
received, and the NRC's letter to the petitioner are available for
public inspection in the NRC Public Document Room, 2120 L Street NW.
(Lower Level), Washington, DC 20012-7082, telephone: (202) 634-3273.
FOR FURTHER INFORMATION CONTACT: Daniele Oudinot, Division of Systems
Safety and Analysis, Office of Nuclear Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001,Telephone: (301) 415-
3731, e-mail dho@nrc.gov.
SUPPLEMENTARY INFORMATION: On June 6, 1995 (60 FR 29784), the NRC
published a notice of receipt of a petition for rulemaking filed by
NEI. The petitioner requested that the NRC revise 10 CFR 50.48 and add
an Appendix S to 10 CFR part 50. In a letter dated February 2, 1995, to
John C. Hoyle, then-Acting Secretary of the NRC, William H. Rasin,
then-president of NEI, submitted a Petition for Rulemaking (PRM-50-61).
In the petition, NEI requested that the NRC amend 10 CFR 50.48 and add
an Appendix S to 10 CFR part 50 providing for an alternative to the
current regulation in Appendix R to 10 CFR part 50, ``Fire Protection
Program for Nuclear Power Facilities Operating Prior to January 1,
1979.'' In its petition, NEI stated that the rulemaking would make the
fire protection regulations less prescriptive and more performance
oriented and risk based.
In a letter dated December 11, 1997, from Ralph Beedle, Senior Vice
President and Chief Nuclear Officer, NEI, to L. Joseph Callan, formerly
NRC Executive Director for Operations, Mr. Beedle presented the results
of a survey of all chief nuclear officers of operating reactors
concerning the fire protection rulemaking. As expressed in that survey,
industry's position was that a new fire protection rule was neither
desired nor considered necessary to ensure or improve safety. In his
letter, Mr. Beedle acknowledged that this represented, on the part of
the industry, a change of position from that previously communicated in
NEI's petition for rulemaking of February 2, 1995.
On March 26, 1998, the NRC staff submitted SECY-98-058,
``Development of a Risk-Informed, Performance-Based Regulation for Fire
Protection at Nuclear Power Plants,'' to the Commission. In SECY-98-
058, the staff recommended that the fire protection rulemaking be
deferred and that the NRC, in cooperation with the NFPA and the
stakeholders, develop a performance-based and risk-informed consensus
standard for fire protection for nuclear power plants. The NRC staff
proposed that if the standard were successfully developed, the NRC
could adopt it in a future rulemaking as an alternate way of meeting
NRC fire protection requirements specified in 10 CFR 50.48 and Appendix
R to 10 CFR part 50. The Commission approved the NRC staff's proposal
in a staff requirements memorandum on SECY-99-058 dated June 30, 1998.
NEI reiterated its approval and support for the development of the
NFPA standard instead of the proposed Appendix S in a letter of May 5,
1998, from Mr. Beedle to the former NRC Chairman Shirley Jackson. In
that letter, Mr. Beedle stated: ``The industry sees no safety benefit
in replacing 10 CFR 50.48 and Appendix R with a new fire protection
rule * * *. It is essential that the industry participate extensively
in the development and review of any guidance to ensure that licensees
and NRC staff have a common understanding * * *. The NRC staff should
continue to support, as does industry, the National Fire Protection
Association (NFPA) process to develop NFPA 805 * * *. The fire
protection rulemaking should be canceled rather than deferred.''
The NRC sent a letter to the petitioner on August 20, 1999, stating
that, on the basis of NEI's letters of December 11, 1997, and May 5,
1998, the NRC concluded that NEI has, in effect, withdrawn its petition
for rulemaking regarding nuclear power plant fire protection. The NRC
also stated that, unless NEI disagreed with this conclusion and
responded in writing within 14 days of the August 20, 1999, letter, the
NRC would publish a notice of withdrawal of the petition in the Federal
Register. NEI did not respond to NRC's August 20, 1999 letter.
Therefore, NRC deems the NEI petition of February 2, 1995 (PRM-50-61)
to be withdrawn.
Dated at Rockville, Maryland, this 14th day of October, 1999.
For the Nuclear Regulatory Commission.
Annette Vietti-Cook,
Secretary of the Commission.
[FR Doc. 99-27360 Filed 10-19-99; 8:45 am]