94-26090. Licensing Policies and Procedures, Satellite Communications; Final Rule FEDERAL COMMUNICATIONS COMMISSION  

  • [Federal Register Volume 59, Number 203 (Friday, October 21, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-26090]
    
    
    [[Page Unknown]]
    
    [Federal Register: October 21, 1994]
    
    
    _______________________________________________________________________
    
    Part V
    
    
    
    
    
    Federal Communications Commission
    
    
    
    
    
    _______________________________________________________________________
    
    
    
    47 CFR Parts 25 and 94
    
    
    
    
    Licensing Policies and Procedures, Satellite Communications; Final Rule
    FEDERAL COMMUNICATIONS COMMISSION
    
    47 CFR Parts 25 and 94
    
    [CC Docket No. 92-166; FCC No. 94-261]
    
     
    Licensing Policies and Procedures, Satellite Communications
    
    AGENCY: Federal Communications Commission.
    
    ACTION: Final Rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: In this final rule, the Commission publishes rules to govern 
    the licensing and regulation of low-Earth orbit (LEO) mobile-satellite 
    systems operating in the 1610-1626.5/2483.5-2500 MHz frequency bands. 
    This rule follows a notice of proposed rulemaking published in the 
    Federal Register on March 14, 1994 [59 FR 11746]. The qualification 
    requirements and technical rules are intended to permit licensing of 
    these systems and the provision of new domestic and international 
    satellite services.
    
    EFFECTIVE DATE: November 21, 1994.
    
    ADDRESSES: Federal Communications Commission, 1919 M Street, NW., 
    Washington, DC 20554.
    
    FOR FURTHER INFORMATION CONTACT:
    Fern Jarmulnek, International Bureau, (202) 634-1682; Kathleen 
    Campbell, International Bureau, (202) 634-1952.
    
    SUPPLEMENTARY INFORMATION: 
    
    I. Introduction
    
        1. By this Report and Order, the Commission takes the next step in 
    the process of licensing the world's first commercial low-Earth orbit 
    (LEO) satellites capable of providing both voice and data mobile 
    satellite services (MSS) on a global basis. The satellites are to 
    operate in the 1610-1626.5/2483.5-2500 MHz bands that were recently 
    allocated both internationally and domestically to MSS.\1\ This new 
    mobile satellite service--the ``MSS Above 1 GHz'' or ``Big LEO'' 
    satellite service--has the potential to provide not only a variety of 
    new services to users in the United States, but to provide integrated 
    communication services to all parts of the world, including those that 
    are now grossly underserved. In a Notice of Proposed Rulemaking 
    (Notice), adopted in January 1994,\2\ the Commission proposed rules and 
    policies to govern the service. Thirty-three parties filed comments in 
    response to the Notice and 18 parties filed reply comments.\3\ Since 
    the pleading cycle closed, four of the applicants filed a Joint 
    Proposal and Supplemental Comments (Joint Proposal).\4\ A fifth 
    applicant sent a letter to the Chairman (FCC) on September 14, 1994 
    regarding the Joint Proposal.\5\ In this Report and Order, we adopt 
    many of the proposals in the Notice, adopt others with modification, 
    and defer action on several issues where a decision is premature. We 
    also adopt many, but not all, of the terms of the Joint Proposal. We 
    believe our decision will promote participation by the greatest number 
    of applicants in an expeditious time frame.\6\ It will create a new 
    industry providing enormous economic benefit to the United States, and 
    any other country that chooses to participate in the service.
    ---------------------------------------------------------------------------
    
        \1\International Telecommunication Union, Final Acts of the 
    World Administrative Radio Conference (WARC-92), Malaga-Torremolinos 
    (1992); Report and Order, ET Docket No. 92-28, 9 FCC Rcd 536 (1994) 
    (Allocation Order).
        \2\Amendment of the Commission's Rules to Establish Rules and 
    Policies Pertaining to a Mobile Satellite Service in the 1610-
    1626.5/2483.5-2500 MHz Frequency Bands, 9 FCC 2d 1094 (1994).
        \3\A list of commenters is attached as Appendix A.
        \4\See Note 23, infra.
        \5\See Note 23, infra.
        \6\See S.R. 103-309 (July 14, 1994).
    ---------------------------------------------------------------------------
    
        2. All six applicants who filed applications by the cut-off date, 
    as detailed below, will be provided with an opportunity to file amended 
    applications that conform with the rules adopted today. Given the 
    importance of proceeding quickly with licensing systems in this 
    revolutionary service, amended applications must be filed by November 
    16, 1994 in order to receive continued consideration. As is our usual 
    practice in the satellite area, each applicant must request 
    construction, launch and operating authority to retain its status in 
    this processing group. All amendments must be accompanied by the 
    appropriate fee for applications for launch and operating authority for 
    LEO satellite systems, if that fee has not yet been submitted. 
    Applicants will be provided until January 31, 1996, at their option, in 
    which to make a complete financial showing.\7\
    ---------------------------------------------------------------------------
    
        \7\See para. 40, Infra.
    ---------------------------------------------------------------------------
    
        3. As described in the Notice, the Big LEO service can offer an 
    almost limitless number of services, including ubiquitous voice and 
    date mobile services position location services, search and rescue 
    communications, disaster management communications, environmental 
    monitoring, paging services, facsimile transmission services, cargo 
    tracking, and industrial monitoring and control.\8\ Domestically, this 
    service will help meet the demand for a seamless, nationwide and 
    eventually global communications system that is available to all and 
    that can offer a wide range of voice and data telecommunication 
    services. In addition to enhancing the competitive market for mobile 
    telecommunication services in areas served by terrestrial mobile 
    services, this new mobile satellite service will offer Americans in 
    rural areas that are not otherwise linked to the communications 
    infrastructure immediate access to a feature-rich communications 
    network. Moreover, Big LEO systems can extend these benefits throughout 
    the world, and can provide those countries that have not been able to 
    develop a nationwide communication service an ``instant'' global and 
    national telecommunication infrastructure.\9\ This network can be used 
    to provide both basic and emergency communications to their entire 
    populations. Big LEO systems may prove to be critical component in the 
    development of the global information highway.
    ---------------------------------------------------------------------------
    
        \8\See paras. 196-202, infra, regarding the use of Big LEO 
    systems of emergency communications.
        \9\It is estimated that some of these services will cost as 
    little as 22 cents per minute.
    ---------------------------------------------------------------------------
    
        4. The Big LEO service also has the potential to stimulate 
    significant economic growth both in the United States and abroad. A 
    potential multi-billion dollar industry will be created, generating 
    opportunities for economic growth in a variety of markets. First, the 
    estimated costs to construct the applicants' space segments range from 
    $97 million to over $2 billion each. The manufacturing costs for the 
    ground segment, which include both user units and gateway stations, are 
    expected to be hundreds of millions of dollars more. Thus, 
    manufacturing these systems may lead to a substantial investment in the 
    United States economy and create a significant number of high paying 
    jobs in the areas of research and development, production, marketing 
    and service administration. As the services become available, 
    additional growth opportunities will be created. One of the applicants, 
    for example, expects that by 2001 the demand for user transceivers will 
    be 1.3 million in the United States and 4.7 million worldwide.\10\ If 
    so, this will create a major global industry whose function will be to 
    provide users with mobile units and services. As demand grows and as 
    markets develop, additional employment opportunities will be created. 
    Customer purchases of transceivers and user service charges will 
    generate additional investment in the economies of the host countries. 
    Finally, the enhanced communications services offered by this industry 
    will, of themselves, create a broad secondary economic growth. 
    Immediate access to an advanced global communications infrastructure 
    can increase the efficiency of existing businesses and create new ones.
    ---------------------------------------------------------------------------
    
        \10\Application of Motorola Satellite Communications, Inc. at 
    11.
    ---------------------------------------------------------------------------
    
        5. The United States has led the world in developing and 
    implementing satellite technology. We expect many of the economic, 
    cultural and other gains we have seen in the fixed-satellite industry 
    to be reflected in the new mobile satellite industry. The Big LEO 
    proposal before us represent an opportunity for the United States to 
    continue its leadership role in promoting global development through 
    enhanced communication infrastructures and services. We intend to 
    license these systems as quickly as possible so that this opportunity 
    is not lost.
    
    II. Background
    
        6. As described in the Notice,\11\ this proceeding was initiated in 
    late 1990, when Ellipsat Corporation (Ellipsat)\12\ and Motorola 
    Satellite Communications, Inc. (Motorola) filed applications to 
    construct LEO satellite systems in the 1610-1626.5/2483.5-2500 MHz 
    bands and the 1610-1626.5 MHz band, respectively.\13\ At the time these 
    applications were filed, there was no frequency allocation in these 
    bands for MSS. The banks were allocated to, among other services, the 
    radiodetermination satellite service (RDSS), which encompasses 
    satellite radionavigation and radiolocation services.\14\ The Motorola 
    and Ellipsat systems were intended to provide voice and data MSS in 
    addition to RDSS. Both applicants requested waivers of the U.S. Table 
    of Frequency Allocations, 47 CFR Sec. 2.1, to permit non-conforming MSS 
    operations in the bands.\15\
    ---------------------------------------------------------------------------
    
        \11\See Notice, note 2, supra, at paras. 5-9.
        \12\Ellipsat is now doing business as Mobile Communications 
    Holdings, Inc. Because it has participated throughout this 
    proceeding as Ellipsat, we will continue to refer to it as Ellipsat 
    in this Report and Order.
        \13\Ellipsat proposed the 1.6 GHz band for Earth-to-space 
    transmissions and the 2.4 GHz band for space-to-Earth transmissions. 
    Motorola proposed to use the 1.6 GHz band for bidirectional 
    transmissions. Motorola later modified its application to request 
    the 1616-1626.5 MHz band only. See Minor Amendment filed by Motorola 
    (Aug. 14, 1992).
        \14\Portions of the banks are also allocated to the aeronautical 
    radionavigation service (ARNS), the radioastronomy service, the 
    terrestrial fixed-service and for use by industrial, scientific, and 
    medical equipment. See paras. 98-162, infra, for a complete 
    discussion of sharing between MSS and other allocated services.
        \15\These waiver requests have become moot in light of the 
    subsequent domestic and international MSS allocation in these bands. 
    See note 1, supra.
    ---------------------------------------------------------------------------
    
        7. The Commission placed the Ellipsat and Motorola proposals on 
    public notice and established a June 3, 1991 cut-off date for filing 
    applications to be considered concurrently with them.\16\ In response, 
    Constellation Communications, Inc. (Constellation), Loral Cellular 
    Systems Corp., now doing business as Loral Qualcomm Partnership (LQP), 
    TRW, Inc. (TRW), and AMSC Subsidiary Corporation (AMSC) filed 
    applications. Constellation, LQP, and TRW proposed to construct LEO 
    satellite systems. AMSC proposed to add additional frequencies onto its 
    authorized geostationary satelliteorbit (GSO) system.\17\ The LEO 
    applicants proposed two basic LEO system architectures. TRW, LQP, 
    Ellipsat, and Constellation proposed a code division multiple access 
    (CDMA) architecture. CDMA systems can share the same frequencies when 
    operating under certain technical constraints.\18\ Motorola proposed a 
    time division multiple access/frequency division multiple access (TDMA/
    FDMA) architecture. TDMA/FDMA systems must operate on separate 
    dedicated frequencies.\19\ AMSC's proposed GSO system could use either 
    CDMA or narrowband FDMA techniques.
    ---------------------------------------------------------------------------
    
        \16\Public Notice, Report No. DS-1068, 6 FCC Rcd 2083 (1991).
        \17\AMSC requested authority to modify its authorized upper L-
    band (1545-1559/1646.5-1600.5 MHz) MSS system to include the 1616.5-
    1626.5 MHZ frequency bands.
        \18\Spread spectrum CDMA is a digital transmission technique in 
    which the signal occupies a bandwidth larger than that needed to 
    contain the information being transmitted. Because the signal is 
    spread over a wide bandwidth, the power is dispersed and 
    interference potential is reduced. The spreading is accomplished by 
    modulating the signal by a code that is independent of the 
    information data. A synchronized code in the receiver is used to de-
    spread the signal and recover the information. The spreading and the 
    variation in the code permit a number of users to operate on the 
    same frequency simultaneously without causing harmful interference.
        \19\TDMA is a transmission technique in which the same frequency 
    band is used by both uplink and downlink transmissions in 
    alternating time slots. FDMA provides multiple discrete channels 
    with different center frequencies.
    ---------------------------------------------------------------------------
    
        8. The World Administrative Radio Conference (WARC-92), allocated 
    frequencies for MSS in February 1992.\20\ Specifically, the 1610-1626.5 
    MHz band was allocated on a co-primary basis with other radio services 
    for MSS Earth-to-space operations and the 2483.5-2500 MHz band was 
    allocated on a co-primary basis for space-to-Earth operations.\21\ In 
    addition, a secondary allocation was made for MSS space-to-Earth 
    operations in the 1613.8-1626.5 MHz segment of the 1.6 GHz band. 
    Shortly thereafter, the Commission proposed an identical domestic 
    allocation and subsequently adopted that allocation in December 
    1993.\22\
    ---------------------------------------------------------------------------
    
        \20\See note 1, supra.
        \21\``Primary'' services have equal rights to operate in 
    particular frequencies. Stations operating in primary services are 
    protected against interference from stations of ``secondary'' 
    services. Moreover, stations operating in a secondary service cannot 
    claim protection from harmful interference from stations of a 
    primary service. See 47 CFR Secs. 2.104(d) and 2.105(c).
        \22\See note 1, supra.
    ---------------------------------------------------------------------------
    
        9. The Commission conducted a negotiated rulemaking from January 
    through April 1993 to assist it in developing technical rules for the 
    MSS Above 1 GHz service. The Negotiated Rulemaking Committee's (the 
    Committee's) work included technical matters relating to compatibility 
    among the proposed MMS systems (inter-system sharing issues), 
    compatibility between MSS and other services in the band or in adjacent 
    bands (inter-service sharing issues), and the operations of MSS feeder 
    links and intersatellite links. The Committee reached consensus on many 
    issues, but did not reach a consensus regarding a technical method by 
    which all proposed systems could be accommodated within the 1610-
    1626.5/2483.5-2500 MHz bands.\23\
    ---------------------------------------------------------------------------
    
        \23\See Report of the MSS Above 1 GHz Negotiated Rulemaking 
    Committee (Apr. 6, 1993). The Committee included two independent 
    attachments discussing this issue in the Report. One was supported 
    by AMSC, Celsat, Inc., Constellation, Ellipsat, LQP and TRW. The 
    other was supported by Motorola. Since the end of the Negotiated 
    Rulemaking, the LEO applicants have submitted several partial 
    settlement proposals. See Joint Filed Comments, submitted by 
    Motorola and LQP (Oct. 7. 1993); Joint Spectrum Sharing Proposal, 
    submitted by Constellation, Ellipsat and TRW (Oct. 8, 1993). Joint 
    Proposal and Supplemental Comments submitted by Constellation, 
    Ellipsat, Motorola, and TRW (Sept. 9, 1994). See also letter from 
    LQP to FCC (Sept. 13, 1994).
    ---------------------------------------------------------------------------
    
        10. In January 1994, the FCC adopted the Notice proposing, among 
    other things, a LEO design requirement, a requirement that systems be 
    capable of serving all areas of the world (except for the polar 
    regions) for at least 75% of each day, a requirement that systems be 
    capable of serving all areas of the United States at all times. and a 
    requirement that applicants demonstrate sufficient current assets or 
    irrevocably committed financing to meet construction and launch costs 
    for the entire system. We also proposed a spectrum sharing plan that 
    could accommodate up to five systems. We indicated that if mutual 
    exclusivity could not be resolved, we would consider awarding licenses 
    by auction, lottery or comparative hearing.\24\
    ---------------------------------------------------------------------------
    
        \24\Notice, note 2, supra, at paras. 29-47.
    ---------------------------------------------------------------------------
    
    III. Discussion
    
    A. Licensing Procedures
    
    1. Qualification Requirements
        11. As discussed in the Notice, unless otherwise proscribed by 
    rule, statute or treaty, the Commission has traditionally adopted 
    qualification requirements for each satellite service that reflect the 
    nature of and entry opportunities for the particular service being 
    licensed. Where entry opportunities for a particular service are 
    limited, our threshold qualification requirements for that service are 
    designed to ensure that those awarded licenses can expeditiously 
    implement state-of-the-art systems that further the public interest. If 
    applicants are unable to meet the basic qualifying criteria, their 
    applications are dismissed without additional hearing.
        a. Technical qualifications--i. Orbit considerations. 12. In the 
    Notice, we proposed to require MSS Above 1 GHz systems to operate in 
    non-geostationary orbits.\25\ Because of their lower altitude orbits, 
    LEO systems ``can shorten the transmission time between two earth 
    stations, serving to reduce or eliminate the time delay that may now be 
    present in [GSO] satellite-delivered telephone service.''\26\ We also 
    stated that the Communications Act specifically requires us ``to 
    encourage the provision of new technologies and services to the 
    public.''\27\ We noted that LEO satellite systems, which cover higher 
    latitudes than GSO satellites, and provide a variety of low power links 
    to and from terrestrial equipment, represent such a new technology. We 
    also noted that the inherently global nature of LEO systems offers a 
    broad range of public interest benefits for the United States, 
    including increased possibilities of U.S. leadership in developing and 
    implementing satellite technology, and enhanced U.S. global 
    competitiveness in telecommunication. We suggested that the unique 
    features of LEO systems would foster social and economic benefits 
    throughout the world.
    ---------------------------------------------------------------------------
    
        \25\Id. at paras. 20-22; proposed Sec. 25.143(b)(1).
        \26\Id. at para. 22.
        \27\47 U.S.C. 157.
    ---------------------------------------------------------------------------
    
        13. We requested comment on the potential for MSS Above 1 GHz 
    systems to generate social, economic, and technical benefits, both 
    domestically and globally, and the extent to which these benefits are 
    realizable with LEO and GSO satellites. We also asked applicants to 
    specify the extent to which their proposed systems will foster these 
    goals and the manner in which their services are planned to be offered. 
    Prospective customers were asked to specify their anticipated use or 
    uses of MSS Above 1 GHz systems, including a discussion of whether 
    equivalent services can be provided by LEO and GSO facilities and 
    whether, and the extent to which, alternative terrestrial services are 
    available.
        14. AirTouch Communications (AirTouch), Constellation, Ellipsat, 
    LQP, Motorola, Novacom Inc. (Novacom), and TRW support our proposal to 
    require MSS Above 1 GHz systems to operate in LEO orbits. The range of 
    technical benefits to the United States and world communities by LEO 
    systems includes virtually instantaneous voice transmissions, broader 
    geographic coverage, use of low power handheld transceivers and small 
    antennas. AMSC, Comsat, Mobile Communications (Comsat), Mobile Datacom 
    Corporation (Mobile Datacom), and Newcomb Communications, Inc. 
    (Newcomb) do not support our proposal. They argue that there will be no 
    significant qualitative or quantitative difference in the time delay 
    experienced by users of GSO and non-GSO systems and that GSO systems 
    are capable of providing services to most of the Earth. They further 
    argue that LEO technology is subject to shadowing outages,\28\ is more 
    complex, and is unproven.
    ---------------------------------------------------------------------------
    
        \28\Shadowing occurs when transmissions from the satellite or 
    mobile transceivers are blocked by buildings and vegetation. 
    Shadowing also occurs to GSO systems when the user transceiver 
    terminal is located on a vehicle.
    ---------------------------------------------------------------------------
    
        15. We adopt our proposed LEO design requirement. First, AMSC has 
    not convinced us that our assumption regarding the time delay in high 
    altitude GSO systems was in error. While system processing times 
    associated with non-GSO satellite handoffs may be marginally longer 
    than the 18 milliseconds noted by LQP, AMSC has not shown that a GSO 
    system's typical voice transmission delay of some 250 milliseconds, or 
    even longer for multiple hops, is not noticeable to users.
        16. Further, LEO systems are significantly superior in their 
    coverage capabilities. While GSO systems can provide coverage to most 
    of the world, this coverage is limited in areas of high latitude, 
    including parts of Alaska. AMSC concedes that GSO systems can provide 
    only ``near'' total coverage of the Earth. Although GSO systems are 
    capable of providing acceptable services across most of the Earth's 
    surface, LEOs are capable of providing truly global coverage. LEO 
    technology, for example, may enable residents of remote parts of Alaska 
    to have individual telephone access for the first time. There is 
    nothing in the record to suggest that provision of such broad 
    geographical service reduces the capacity of LEO systems to serve more 
    concentrated areas, as AMSC suggests. The public interest would be best 
    served by the technology that offers the broadest potential coverage.
        17. The use of handheld transceivers also is facilitated by LEO 
    systems. LEO satellites' lower power levels alleviate the need for 
    large antennas aboard the spacecraft and reduce transceiver weight and 
    volume, enhancing their portability. By contrast, AMSC suggests that 
    handheld transceivers are not contemplated by GSO systems.\29\ Its 
    immediate plans do not include handheld capability, though its second 
    generation system is expected to support them.\30\ As we embark on the 
    promise of new mobile technologies, we find it in the public interest 
    to permit the timely deployment of personal communications services 
    that include the broad use of handheld transceivers.
    ---------------------------------------------------------------------------
    
        \29\AMSC Reply Comments at 3, n. 1.
        \30\Id.
    ---------------------------------------------------------------------------
    
        18. One risk cited by AMSC is the increased possibility that the 
    satellites in the LEO constellation will collide with other objects in 
    space. We do not view this as stifling LEO technology. Both the 
    likelihood of collisions and future mitigation methods are being 
    discussed in domestic and international fora. However, the record in 
    this proceeding does not support a finding that space collisions will 
    become a significant problem for LEO systems. We also acknowledge that 
    the reception shadowing associated with LEO satellite movement relative 
    to the Earth's surface (which AMSC suggests would adversely affect 
    signal quality during voice communications) may add to the operational 
    challenges confronting LEO MSS technology. There is no showing, 
    however, that shadowing is more of a problem with LEO technology than 
    it is with GSO technology.
        19. Advocates of both GSO and LEO systems argue that their 
    technology will offer economic and social benefits, domestically and 
    globally. The essential advantage of GSO systems is their proven 
    capability to provide telecommunication services. Intelsat and Inmarsat 
    are but two examples. These successes, however, are not sufficient to 
    preclude embracing a new and potentially more efficient technology, 
    notwithstanding its substantial risks and costs. On the contrary, the 
    Commission has a mandate to encourage new technologies and 
    services.\31\ While both LEO and GSO systems portend substantial 
    opportunities for employment growth and export of U.S. technologies 
    worldwide, LEO systems have greater potential to serve more uniformly 
    the United States and international locations with smaller, more 
    ubiquitous and lower power equipment. This leads us to conclude that 
    the primary use of the subject spectrum should be by LEO systems. We 
    therefore adopt Section 25.143(b)(2)(i) as proposed in the Notice.
    ---------------------------------------------------------------------------
    
        \31\47 U.S.C. 157.
    ---------------------------------------------------------------------------
    
        20. Most commenters agree that it would be difficult for GSO and 
    LEO systems to operate MSS services together in this band. Indeed, this 
    was a significant factor in our decision to propose limiting the 1610-
    1626.5/2483.5-2500 MHz band to LEO systems Notwithstanding our decision 
    to adopt a LEO design requirement, we would consider authorizing a GSO 
    system in these bands upon a showing that its operations would not 
    cause interference to or affect LEO operations. Similarly, the 
    provision of radiodetermination satellite services (RDSS) by either LEO 
    or GSO systems would be permissible if fully compatible with licensed 
    LEO MSS systems.\32\
    ---------------------------------------------------------------------------
    
        \32\See 47 CFR Sec. 25.141(f).
    ---------------------------------------------------------------------------
    
        ii. Global vs. regional coverage. 21 In our Notice, we discussed 
    the geographic coverage we would require these satellite systems to 
    provide. In view of our interest in furthering the creation of the 
    global information infrastructure, we proposed to require each MSS 
    Above 1 GHz applicant to demonstrate that its proposed system is 
    capable of providing mobile satellite service to all areas of the 
    world, with the exception of the polar regions, for at least 75% of 
    every 24 hour period. Specifically, we proposed that Big LEO satellite 
    systems be designed so that at least one satellite would be visible 
    above the horizon at an elevation angle of at least 5 deg. for at least 
    18 hours each day at latitudes less than 80 deg..\33\
    ---------------------------------------------------------------------------
    
        \33\See Notice, note 2, supra, App. A at 1152; proposed Section 
    25.143(b)(2)(ii).
    ---------------------------------------------------------------------------
    
        22. The commenters generally support this requirement. They 
    disagree, however, on the extent to which systems must offer service in 
    or near the polar regions. The majority, including the system 
    applicants, agree that there is little need for a requirement to serve 
    unpopulated areas. They argue that the additional costs associated with 
    such service would not be justified. For example, TRW suggests that 
    service up to 80 deg. northern and southern latitudes may not be 
    necessary, because there are no populated areas that far north or south 
    and the economic costs of requiring such service are high. Ellipsat 
    favors requirements of 55 deg. Southern Latitude and 75 deg. degrees 
    Northern Latitude, to cover all but the most remote population centers. 
    The parties to the Joint Proposal modify their previous positions by 
    suggesting a coverage requirement of up to 70 deg. North Latitude and 
    55 deg. South Latitude.
        23. As noted, LEO systems are capable of providing service to all 
    points on Earth. We recognize, however, the need to balance system cost 
    against geographical service area. We agree with the commenters that it 
    is sufficient, given projected need and alternative service options, to 
    require service only to populated areas. We therefore require that Big 
    LEO systems be capable of serving locations as far north as 70 deg. 
    latitude and as far south as 55 deg. latitude. This will allow coverage 
    to populated areas that cannot be reached by GSO systems. While ships 
    and airplanes may traverse the polar regions beyond these latitudes, 
    they are not necessarily deprived of service because the LEO satellites 
    may, in fact, be visible.
        iii. Continuous coverage of the fifty states. 24. We indicated in 
    the Notice that the public interest would be served if LEO systems 
    provided efficient and ubiquitous voice service to users throughout the 
    United States. We therefore proposed to require each LEO system to have 
    at least one satellite at an elevation angle of at least 5 deg. at any 
    given time in all areas of the United States.\34\
    ---------------------------------------------------------------------------
    
        \34\See id.; proposed Section 25.143(b)(2)(iii).
    ---------------------------------------------------------------------------
    
        25. Several commenters note that we proposed to require global 
    ``mobile satellite services'' in proposed Section 25.143(b)(2)(ii) and 
    domestic ``voice'' service in proposed Section 25.143(b)(2)(iii). Our 
    expectation is that LEO system operators will have market incentives to 
    offer more than merely voice services, but for purposes of consistency 
    we will revise proposed Section 25.143(b)(2)(iii) to read ``mobile 
    satellite services.'' Further, in the Joint Proposal, the parties agree 
    that Big LEO systems should be capable of covering all fifty states, 
    Puerto Rico and the U.S. Virgin Islands. We will amend Section 
    25.143(b)(2)(iii) to reflect this coverage.
        b. Financial qualifications. 26. In light of the enormous costs 
    involved in constructing and launching a satellite system, we have 
    always considered financial ability a significant factor in determining 
    whether an applicant is qualified to hold a license. Historically, the 
    Commission has fashioned financial requirements for satellite services 
    on the basis of entry opportunities in the particular service being 
    licensed. This stems from our repeated experience that licensees 
    without sufficient available resources spend a significant amount of 
    time attempting to raise the necessary financing and that those 
    attempts often end unsuccessfully.\35\ Consequently, where a grant to 
    an under-financed applicant may preclude a fully capitalized applicant 
    from implementing its plans, and service to the public may be 
    consequently delayed, we have required a stringent financial showing to 
    ensure that the public interest would be served.\36\ We have required a 
    less stringent financial showing where grant to an under-financed 
    applicant will not prevent another from going forward. For example, we 
    required only a detailed business plan in the radiodetermination 
    satellite service, where all applicants could be accommodated and 
    future entry was possible.\37\ In contrast, we required evidence of 
    full, irrevocable financing in the domestic-fixed satellite service, 
    where applications to implement space stations regularly exceed the 
    number of available orbital locations for those satellites.\38\
    ---------------------------------------------------------------------------
    
        \35\See, e.g., National Exchange Satellite, Inc., 7 FCC Red 1990 
    (Com. Car. Bur. 1992); Rainbow Satellite, Inc., Mimeo No. 2584 (Com. 
    Car. Bur., released Feb. 14, 1985); United States Satellite Systems, 
    Inc., Mimeo No. 2583 (Com. Car. Bur., released Feb. 14, 1985) 
    (domestic satellite licenses declared null and void for failure to 
    begin implementation as required by license). In addition, Geostar 
    Corporation, a start-up company licensed in the radiodetermination 
    satellite service, declared bankruptcy nearly five years after its 
    licenses were issued. It had not built any of its satellites.
        \36\This approach has not prevented smaller firms from 
    participating in the satellite services market because ownership of 
    a space station is not mandatory. Space station capacity can be 
    leased or bought, and earth stations can be acquired at relatively 
    low costs.
        \37\Amendment to the Commission's Rules to Allocate Spectrum 
    for, and to Establish Other Rules and Policies Pertaining to, a 
    Radiodetermination Satellite Service, 104 FCC 2d 650 (1986) (RDSS 
    Licensing Order). We note that none of the four entities awarded 
    licenses implemented their proposed systems, with the last remaining 
    licensee, Geostar Corporation, declaring bankruptcy in 1991.
        \38\Licensing Space Stations in the Domestic-Fixed Satellite 
    Service, 50 Fed. Reg. 36071 (Sept. 5, 1985) (1985 Processing Order).
    ---------------------------------------------------------------------------
    
        27. The Negotiated Rulemaking Committee could not agree to a method 
    by which all six proposed systems could be licensed. Further, the 
    sharing plan we proposed in the Notice, and which we adopt today,\39\ 
    does not accommodate all pending applicants and leaves little or no 
    spectrum available for expansion of existing systems or the development 
    of future MSS systems within the United States. Consequently, 
    consistent with our past practice, we seek to ensure that those 
    applicants awarded Big LEO licenses have the financial ability to 
    proceed.
    ---------------------------------------------------------------------------
    
        \39\See paras. 44-45, infra.
    ---------------------------------------------------------------------------
    
        28. The domestic fixed-satellite standard was developed to serve 
    the public interest by deterring warehousing and inefficient use of 
    valuable orbit spectrum resources. Given the same public interest 
    concerns here, we proposed in the Notice a financial standard for the 
    Big LEO service identical to the one used in the domestic fixed-
    satellite service, noting that a lesser standard could allow permittees 
    to tie up scarce spectrum resources while preventing other qualified 
    entities from providing service to the public.\40\ Thus, we proposed to 
    require Big LEO applicants to provide evidence of current assets, 
    operating revenues, or irrevocably committed debt or equity financing 
    sufficient to meet the estimated costs of constructing and launching 
    all planned satellites, and operating the system for the first 
    year.\41\
    ---------------------------------------------------------------------------
    
        \40\1985 Processing Order, note 38, supra, at para. 8.
        \41\Notice, note 2, supra, at para. 27. We noted that ``first 
    year operational costs'' were to be calculated for the year 
    following the launch of the first satellite in the constellation.
    ---------------------------------------------------------------------------
    
        29. The four parties to the Joint Proposal suggest using a less 
    stringent financial standard that requires an applicant to show 
    ``financial preparedness, including reliance on projected revenues and 
    future public offerings'' in order to be granted a construction permit. 
    Within one year from the date of the grant of a license, each permittee 
    would be required to demonstrate that it meets the domestic fixed-
    satellite service financial standard with respect to 25% of the total 
    constellation construction and launch costs. LQP, in contrast, argues 
    that this proposed relaxation of financial standards must be balanced 
    against the concern that only viable applicants be licensed.\42\
    ---------------------------------------------------------------------------
    
        \42\See Letter from Chairman, Loral Corporation to Christopher 
    B. Galvin, Motorola, Inc. (Sept. 13, 1994).
    ---------------------------------------------------------------------------
    
        30. We conclude that although more relaxed approaches may be used 
    for some satellite services, a strict financial requirement is 
    warranted for the Big LEO service. The proposed Big LEO systems will 
    cost between $97 million and $2 billion to implement. These are, by 
    far, the most expensive satellite systems to date. As we indicated in 
    the Notice, our experience with the satellite industry has proven that 
    arranging financing for any space station system, even one 
    significantly less costly than a Big LEO system, is extremely 
    difficult, even after a construction permit has been granted.\43\ 
    Consequently, adopting a lesser financial standard than the domestic 
    fixed-satellite standard, such as the one suggested in the Joint 
    Proposal, could tie up spectrum for years, with contrary to the public 
    interest. While system implementation milestone requirements\44\ will 
    provide a mechanism by which to revoke the licenses of those entities 
    that are not capable of going forward, this process takes considerable 
    time and can delay qualified entities from implementing systems and 
    providing service to the public.\45\ Because all pending Big LEO 
    applicants cannot be accommodated and because there appears to be no 
    room for future entry, granting an under-financed space station 
    applicant a license may preclude an applicant that possesses the 
    necessary financial resources from implementing its plans, and 
    consequently service to the public may be delayed. Accordingly, we 
    conclude that a financial demonstration identical to the one used in 
    the domestic fixed-satellite service, as proposed in the Notice, should 
    be adopted for the Big LEO service.
    ---------------------------------------------------------------------------
    
        \43\See note 35, supra.
        \44\See paras. 188-193, infra.
        \45\For example, ABCI, Rainbow, and USSSI were granted domestic 
    fixed-satellite licenses in early 1983. Those licenses were not 
    declared null and void until two years later, shortly before action 
    was taken on the next processing group of domsat applications. 
    Applications in that particular processing group had been on file 
    since late 1983 and action on that group was delayed, in part, by 
    the ABCI, Rainbow, and USSSI proceedings. See e.g., United States 
    Satellite Systems, Inc., FCC 83-602 (released Jan. 23, 1984) 
    (granting USSSI an additional six months in which to complete its 
    financing), Mimeo No. 2583 (released Feb. 14, 1985) (revoking USSSI 
    authorizations), FCC 85-394 (released Aug. 29, 1985) (denying 
    USSSI's applications for review).
    ---------------------------------------------------------------------------
    
        31. Applicants relying on internal financing need not set aside 
    specific funds for their systems. Rather, as in the domestic fixed-
    satellite service, we require only a demonstration of current assets or 
    operating income sufficient to cover system costs. The availability of 
    internal funds sufficient to cover a system's costs provides adequate 
    assurance at the time the Commission acts on the application that the 
    system can be built and launched. Current assets--which includes cash, 
    inventory, and accounts receivable--provide a general measure of a 
    company's ability to finance the project itself or to raise funds from 
    lenders and equity investors on the basis of its on-going operations. 
    Highly capitalized companies possess more collateral and, thus, are in 
    a better position to borrow money than thinly capitalized companies.
        32. Further, ``irrevocably'' committed external financing is 
    financing that has been approved and does not rest on contingencies 
    which require action by either party to the loan or equity investment. 
    In other words, the instrument of financing must demonstrate that the 
    lender has already determined that the applicant is creditworthy and, 
    absent a material change in circumstances, is prepared to make the loan 
    immediately upon grant of a Commission authorization.\46\ This is not 
    to preclude applicants from relying on operating revenues from the 
    initial operations of their systems to finance the remainder of their 
    systems. Nevertheless, to ensure that the system is completed in a 
    timely manner if revenues are not available as soon as anticipated, we 
    require a commitment that a lender is prepared to finance the entire 
    cost of the system.
    ---------------------------------------------------------------------------
    
        \46\For example, a change in general market conditions or in the 
    applicant's creditworthiness is an acceptable limitation on the 
    lender's commitment to make the loan. Further, a lender is not 
    required to lend the applicant the entire sum at once. Rather, 
    funding can be staggered to reflect the system's implementation 
    schedule or the applicant's need to access those funds. See 
    Licensing Space Stations in the Domestic-Satellite Service, 101 FCC 
    2d 223 (1985) (1985 Processing Group Notice of Proposed Rulemaking), 
    at para. 22.
    ---------------------------------------------------------------------------
    
        33. Some of the applicants argued in their comments\47\ that a more 
    relaxed standard is supported by our use of a less stringent financial 
    requirement in the radiodetermination satellite service (RDSS) and the 
    non-voice, non-geostationary (NVNG) service. These parties argue that 
    the unproven nature of the RDSS and NVNG services led to the adoption 
    of a financial standard that permitted applicants to finance the 
    systems as they are built and deployed, and that similar considerations 
    apply in the Big LEO service. Our primary reason for the ``relaxed'' 
    standard in the RDSS and NVNG services, however, was that all pending 
    applicants could be accommodated and future entry was possible.\48\ 
    Consequently, a grant to an under-financed applicant would not preclude 
    another qualified entity from going forward. The financial 
    qualification standard adopted for RDSS and NVNG services is therefore 
    inappropriate for Big LEOs.
    ---------------------------------------------------------------------------
    
        \47\We will address all concerns raised in the comments even 
    though they may be inconsistent with the positions taken by the 
    applicants in the Joint Proposal.
        \48\See Notice, note 2, supra, at 1108; RDSS Licensing Order, 
    note 37, supra; Report and Order in CC Docket No. 92-76, 8 FCC Rcd 
    8450 (1993) (NVNG MSS Order).
    ---------------------------------------------------------------------------
    
        34. Some of the applicants also argue that we should require only a 
    demonstration of partial financing. They contend that applicants that 
    have the financing to meet construction and launch costs for the number 
    of satellites needed to provide limited domestic and global service 
    will be able to finance the remainder of their systems with the 
    operating income from these services. Such a position, however, would 
    not promote the global availability of this service. A system that 
    relies too heavily on operating income from its first satellites for 
    its completion could easily become stalled before it is able to provide 
    domestic or global service that meets our service requirements.\49\ Any 
    applicant that cannot demonstrate the capability to launch more than a 
    limited number of satellites should not be considered for licensing at 
    the expense of potential entrants that could provide global service and 
    continuous domestic service.
    ---------------------------------------------------------------------------
    
        \49\See para. 29, supra.
    ---------------------------------------------------------------------------
    
        35. Ellipsat comments that we should require applicants relying on 
    internal funds to demonstrate a management ``commitment'' to expend 
    those funds for the Big LEO project. Ellipsat argues that this 
    requirement would put companies with greater capital assets on an even 
    footing with smaller applicants who must rely on ``irrevocable'' 
    outside loan commitments to establish their financial qualifications. 
    As we stated in adopting the domestic-fixed satellite standard, we will 
    not require management to set aside specific funds for the system. We 
    will, however, require applicants relying on internal assets to provide 
    a balance sheet demonstrating current assets or operating income 
    sufficient to meet the space segment costs together with evidence of a 
    management commitment to the project. This does not require an 
    unalterable commitment that the funds will be expended regardless of 
    market conditions. Rather, consistent with our approach to credit 
    arrangements provided by outside sources, management of the corporation 
    providing the funding must commit that absent a material change in 
    circumstances, it is prepared to expend the necessary funds.\50\ Those 
    applicants relying on financing from parent corporations must make the 
    same showing with respect to the parent corporation's commitment.
    ---------------------------------------------------------------------------
    
        \50\See 1985 Processing Order, note 38, supra, at n. 26.
    ---------------------------------------------------------------------------
    
        36. AMSC urges that, given the short life of LEO satellites, we 
    should require the applicants to demonstrate the financial capability 
    to build an entire constellation and a fleet of replacement satellites. 
    Although some of the proposed systems use satellites with a short life, 
    a requirement to demonstrate full funding for these before the first 
    generation is built would be exceptionally onerous and unnecessary. We 
    are confident that after constructing and operating a full fleet of 
    satellites, a licensee would have ample incentive and resources to 
    implement replacement satellites, unless there is insufficient demand. 
    In that case, however, the public would not be harmed by 
    discontinuation of the licensee's service.
        37. We recognize that applicants may be able to provide the service 
    requirements adopted today with fewer satellites than proposed in the 
    pending applications. In such a case, an applicant has the option of 
    course, to modify its pending application to specify only those 
    satellites necessary to meet our minimum requirements, and its 
    financial and technical showing would need to cover only such a 
    constellation. It could then apply to expand its constellation as 
    originally envisioned, as it attains the financial capability to do so.
        38. Consequently, to meet the public interest objective of ensuring 
    prompt initiation of this new satellite service, we adopt our proposed 
    rule that requires each Big Leo applicant to demonstrate the ability to 
    build and launch all satellites for which it has applied, which 
    includes those satellites necessary to fulfill our service 
    requirements, and to operate its system for one year after launch of 
    the first satellite in its constellation. In doing so, however, we 
    shall modify our eligibility requirements somewhat in an effort to 
    achieve greater participation by the applicants in this processing 
    group.
        39. First, consistent with our paramount objective of securing 
    early implementation of these satellite services, we shall adopt a 
    rule, consistent with our proposal in the Notice, that will enable 
    applicants who can now demonstrate their financial qualifications to 
    receive priority in obtaining license grants. Thus, any applicant who 
    can submit a complete, amended application on or before November 16, 
    1994, and demonstrates financial capability under the standards set 
    forth in the rule adopted in this proceeding, will be processed 
    immediately. Assuming sufficient spectrum is available to award 
    licenses to all such financially and otherwise qualified applicants, we 
    will grant licenses to these applicants. Given the national and other 
    public interest benefits of ensuring the United States' global 
    leadership in providing these important new satellite services, we also 
    plan to process these applications on an expedited basis, with action 
    anticipated by January 31, 1995. Making these grants promptly will 
    enable such fully qualified applicants to begin immediately the time-
    consuming process of satellite construction, thereby significantly 
    assisting in United States' efforts to complete the international 
    coordination process and achieving our statutory and public interest 
    objective of bringing new and innovative services to the public at the 
    earliest possible time.
        40. We also wish, however, to accord some processing priority to 
    other applicants in this group who may need more time to establish 
    their financial qualifications, and who have all devoted significant 
    time, effort and resources towards establishing the Big LEO service 
    both domestically, in the Negotiated Rulemaking, and internationally. 
    For example, until feeder link frequencies can be assigned to a 
    particular system, which will not likely occur until after the next 
    World Radio Conference to be held in November 1995 (WRC-95), it may be 
    difficult for some of these applicants to finalize financial 
    arrangements for their systems. Consequently, in an effort to afford an 
    additional opportunity for entry by such applicants, we will allow 
    applicants who cannot meet our financial qualifications requirement at 
    this time an additional period of time to establish their 
    qualifications. Specifically, we will require these applicants to file 
    amended applications by November 16, 1994 to ensure their continued 
    consideration, but we will allow them until January 31, 1996--two 
    months after the completion of WRC-95--to demonstrate compliance with 
    the financial standard adopted today.
        41. Under our two-tiered eligibility rule, applicants who make a 
    decision to defer their financial showing until January, 1996, will not 
    jeopardize their status in the current processing group. Specifically, 
    new applications for Big LEO systems will not be considered until after 
    action on the six pending applications is completed. Nevertheless, such 
    applicants will not be accorded the same processing priority as those 
    applicants who are willing and able to demonstrate their financial 
    qualifications far sooner, by November 16, 1994, and whose expeditious 
    grants will better enable us to achieve early and successful 
    international coordination and implementation of this service. Because 
    the spectrum sharing plan we adopt today accommodates up to five 
    systems,\51\ we also recognize that applicants choosing not to make a 
    financial showing until January 1996, may find their applications are 
    mutually exclusive situations. Nevertheless, we believe a very 
    significant likelihood exists that our financial eligibility rule will 
    result in more of these applicants obtaining grants and that, in the 
    intervening time frame until January 1996, events may occur that avoid 
    mutual exclusivity altogether.
    ---------------------------------------------------------------------------
    
        \51\See paras. 44-45, infra.
    ---------------------------------------------------------------------------
    
        42. If it turns out that all six applicants are able to establish 
    their financial qualifications by the November 16, 1994 deadline for 
    amended applications, or alternatively, that all six applicants defer 
    their financial showings until January 1996 and all are then deemed 
    financially qualified, we will implement the auction procedure 
    described below, paras. 88-97, to award licenses. If, however, some 
    grants have been made prior to January 1996, and a mutually exclusive 
    situation arises then, the auction procedure outlined below cannot be 
    used. However, given the uncertainty that such a situation will ever 
    arise, we will not at this time decide how to process any such 
    remaining mutually exclusive applications. Presumably, however, such 
    grants would be awarded through an auction mechanism that is 
    appropriate in the circumstances. We have decided, however, to defer 
    any final decision on that issue at this time.
    2. Spectrum Sharing Plan
        a. Background. 43. As we discussed in the Notice, the six 
    applicants proposed two system designs (LEO and GSO) and two system 
    architectures (CDMA and TDMA/FDMA). A CDMA architecture would permit 
    multiple systems to share the same frequencies. A TDMA/FDMA 
    architecture would operate bi-directionally in a portion of the 1.6 GHz 
    band only and would require each system to operate on discrete 
    frequency band segments. The Committee's work plan called for the 
    Committee to develop rules that would maximize multiple entry and avoid 
    or resolve mutual exclusivity among the six applications. The 
    applicants, however, could not develop a set of technical parameters 
    and sharing criteria that could accommodate all proposed systems. In 
    the Notice, we proposed a sharing plan that could accommodate up to 
    four CDMA systems and one TDMA/FDMA system.\52\ The plan was based, in 
    part, upon partial settlement proposals filed by two groups of LEO 
    applicants after the Negotiated Rulemaking was concluded.\53\ The plan 
    proposed to assign licensees implementing CDMA systems in the United 
    States to 11.35 MHz of shared bandwidth at 1610-1621.35 MHz. It 
    proposed to assign a TDMA/FDMA system operating in the United States to 
    5.15 MHz of dedicated bandwidth at 1621.35-1626.5 MHz. If only one CDMA 
    system is implemented, the plan proposed to adjust the domestic 
    assignment for that system to 8.25 MHz at 1610-1618.25 MHz, leaving the 
    freed 3.15 MHz of spectrum available for possible reassignment to the 
    TDMA/FDMA licensee or for new entry. We also tentatively concluded that 
    CDMA systems would be provided with equal amounts of downlink and 
    uplink spectrum, unless CDMA system proponents could demonstrate an 
    unequal assignment was warranted.
    ---------------------------------------------------------------------------
    
        \52\Our plan included both system architectures for two reasons: 
    (1) the record did not support a finding that one architecture is 
    superior to the other, and (2) the plan would permit up to five 
    systems to be licensed, furthering our multiple entry policy.
        \53\See note 23, supra.
    ---------------------------------------------------------------------------
    
        b. The basic plan. 44. All five applicants proposing LEO systems 
    agree that our plan provides a basis for accommodating five LEO 
    systems. None takes issue with the framework of the plan: up to four 
    CDMA systems can share 11.35 MHz of bandwidth in the 1.6 GHz band and 
    that one TDMA/FDMA system can operate over 5.15 MHz of dedicated 
    bandwidth. Constellation, for example, states that 11.35 MHz can 
    ``support competitive CDMA systems operating in a sharing 
    environment.''\54\ Motorola supports awarding a single TDMA/FDMA 
    license in 5.15 MHz of bandwidth.\55\ LQP, TRW, and Ellipsat all agree 
    that both LEO transmission techniques can be accommodated, with CDMA 
    systems operating on shared spectrum. Indeed, the four proponents of 
    the Joint Proposal, supported by LQP, explicitly agree to an 11.35 MHz/
    5.15 MHz spectrum split.
    ---------------------------------------------------------------------------
    
        \54\Constellation Comments at 19.
        \55\Motorola Comments at 47, n. 35.
    ---------------------------------------------------------------------------
    
        45. Despite its general agreement that its system could be 
    accommodated in 11.35 MHz of shared spectrum, Constellation contends in 
    its comments that all five LEO applicants should be given equal options 
    to use the spectrum. Specifically, it argues that adoption of rules 
    requiring four LEO applicants share spectrum, while allowing the 
    remaining applicant to have exclusive use of its own band segment or 
    assigning prime spectrum to one applicant and impaired spectrum to 
    another, would violate the doctrine enunciated in Ashbacker Radio Corp. 
    v. FCC, 326 U.S. 327 (1945) (Ashbacker). We do not agree that a rule 
    requiring sharing by applicants proposing CDMA systems, and that 
    permits other applicants to have exclusive spectrum, implicates 
    Ashbacker. Such a rule is merely a reasonable exercise of our 
    rulemaking authority, based upon the technical characteristics of the 
    systems involved. We also note that the CDMA applicants agreed to a 
    band sharing plan. Indeed, Constellation agrees that its system can be 
    accommodated in a shared band. Consequently, we adopt the plan's basic 
    framework.\56\
    ---------------------------------------------------------------------------
    
        \56\See Final Report of the Majority of the Active Participants 
    of Informal Working Group 1 to Above 1 GHz Negotiated Rulemaking 
    Committee, Annex 1 (Attachment 1 to Committee Report) and Joint 
    Proposal, note 23, supra.
    ---------------------------------------------------------------------------
    
        46. Despite their general support for the plan, all LEO applicants 
    request some modifications or clarifications. The requests center 
    around three issues: (1) what portion of the 2.4 GHz MSS downlink band 
    will be available to the CDMA licensees; (2) whether MSS operations in 
    the lower 6 MHz of the 1.6 MHz band will be impaired by GLONASS, the 
    Russian Global Navigation Satellite System, and radioastronomy serviced 
    (RAS) operations in that band; and (3) whether the 11.35 MHz CDMA 
    assignment will be automatically reduced to 8.25 MHz should only one 
    CDMA system become operational. We discuss these in turn.
        c. Downlink assignment. 47. In the Notice, we assumed that CDMA 
    systems assigned to share the 1.6 GHz uplink spectrum would require a 
    corresponding amount of 2.4 GHz downlink spectrum. We requested comment 
    on this assumption. All CDMA operators strongly disagree, arguing in 
    their comments and in the Joint Proposal that CDMA applicants should be 
    allowed to share the entire 16.5 MHz of 2.4 GHz downlink spectrum 
    allocated to MSS. They argue that the systems must operate over the 
    entire bandwidth to achieve maximum capacity at minimum cost. According 
    to the CDMA proponents, if the number of satellites transmitting in any 
    segment of the 2.4 GHz band is minimized, the satellites' cost can be 
    substantially reduced. They also argue that the 2.4 GHz band is already 
    constrained by international and domestic power flux density (pfd) 
    limits and other existing services, which limits the number of users 
    that can be served, and that any limitations on bandwidth will further 
    affect system capacity.
        48. We are convinced that the entire 16.5 MHz of spectrum allocated 
    domestically and internationally at 2483.5-2500 MHz should be assigned 
    to Big LEO system downlinks in the United States. There is no 
    compelling reason to restrict use of this band. Indeed, assignment of 
    the entire band should provide operators with sufficient flexibility to 
    coordinate their operations with other Big LEO systems in the band and 
    to accommodate other users in the band or in adjacent bands with little 
    or no corresponding loss of capacity. Consequently, we will provide 
    CDMA operators with access to the entire allocated 2.4 GHz band. 
    Moreover, only satellite systems using CDMA will be permitted in this 
    band.
        d. Interim plan. 49. As we discussed in the Notice, interference 
    problems between MSS and certain proposed applications on GLONASS, the 
    Russian Global Navigation Satellite System, will not permit co-
    frequency co-system coverage in the United States and internationally 
    in the 1610-1616 MHz band. Specifically, if GLONASS is used in 
    conjunction with the U.S. Global Positioning System (GPS) to provide 
    aircraft precision approach and terminal communications, as 
    contemplated by the Federal Aviation Administration (FAA), MSS would 
    not be able to operate in the shared band because of the potential for 
    MSS mobile terminal interference into GLONASS mobile receivers.\57\ We 
    indicated in the Notice that we had initiated inter-agency and 
    international negotiations regarding the use of GLONASS and were 
    encouraged that even if GLONASS were ultimately used to provide 
    services incompatible with MSS, the GLONASS final frequency plan would 
    be changed to bands below 1606 MHz only, making the 1610-1616 MHz band 
    available for MSS operations.\58\ We recognized, however, that a 
    GLONASS transition to bands below 1606 MHz may not be completed when 
    the first MSS satellites are launched in the late 1990's. In that case, 
    we stated we would need to develop a transitional plan for MSS 
    migration into the vacated 1610-1616 MHz band ``with MSS licensees 
    operating on less than the full amount of their assigned spectrum 
    during the initial phases of their operation.''\59\
    ---------------------------------------------------------------------------
    
        \57\The FAA and the International Civil Aviation Organization 
    (ICAO) are investigating using the GLONASS and GPS systems in a 
    joint Global Navigation Satellite System (GNSS) that can support the 
    civil aviation community with the integrity that is required to 
    provide for precision approach landings. The Russian Federation is 
    now launching a second generation of GLONASS satellites, GLONASS-M, 
    which is operating over 24 channels in the 1596.7-1620.6 MHz band. 
    GLONASS-M has not been coordinated internationally. Approximately 40 
    administrations, including the United States, have submitted 
    comments or objections to the ITU Radiocommunication Bureau with 
    respect to GLONASS-M. However, the Russian Federation has been 
    coordinating the GLONASS-M system and has indicated that it has 
    resolved most of the objections by these administrations.
        \58\The Russian Federation has indicated a willingness to use 
    channels 0-12 (1602-1608.75 MHz center frequency) commencing in 
    1998. A guardband of approximately 4 MHz would be required to 
    protect GLONASS-M narrowband signals from ground-based Mobile Earth 
    Station (MES) out-of-band radio frequency emissions on aviation GNSS 
    receivers using GLONASS signals.
        \59\Notice, note 2, supra, at n.59.
    ---------------------------------------------------------------------------
    
        50. The applicants agree in their Joint Proposal that if GLONASS is 
    not moved in a timely manner, the Big LEO licensees should share the 
    burden of any spectrum loss. They argue, however, that we need not 
    develop a transitional plan now, but, rather, that we should allow the 
    parties to negotiate and reach such an agreement in the event GLONASS 
    compromises MSS operations. Both Motorola and LQP argue in their 
    comments that an interim plan would impede MSS by suggesting to GLONASS 
    equipment manufacturers and other countries that they need not plan for 
    the change in GLONASS frequencies and may lead to the view that 
    revision of the GLONASS frequency plan is optional.
        51. Our ongoing discussions with other agencies and with the 
    Russian Federation continue to clarify the GLONASS issue. While we are 
    confident that GLONASS will be moved to bands below 1606 MHz, we do not 
    know when a full transition will occur. At our most recent bilateral 
    discussions, the Russian Federation suggested that a GLONASS migration 
    may not begin until 1998 and may not be completed until 2005.\60\ We do 
    not know whether GLONASS operations, before a migration to the final 
    frequency configuration, will affect MSS CDMA systems operating in the 
    lower frequency portion of the 1.6 GHz band, domestically or 
    internationally. This depends upon two related factors: (1) the extent 
    to which domestic and international civil aeronautical agencies and 
    organizations (such as ICAO) use GLONASS to provide approach and 
    terminal communications that are incompatible with MSS operations and 
    (2) the extent to which out-of-band emission limitations may be needed 
    for MSS transmissions.\61\ Nevertheless, a portion of the 1.6 GHz MSS 
    frequency band may not be available for first-generation domestic MSS 
    operations. At this time, the most likely worst-case scenario is that 
    the 1610-1612 MHz band segment assigned to CDMA systems in our sharing 
    plan may not be available for initial operations in the United 
    States.\62\ This is based on the launch and operation schedules 
    outlined in the various applications.
    ---------------------------------------------------------------------------
    
        \60\The Russian Federation has indicated that it can operate on 
    channels -7 to +6 after 2005 (1598 to 1605.375 MHz center 
    frequency). It has also indicated that it would only use channels 5 
    and 6 as technical channels over the Russian Federation. When this 
    is implemented, GLONASS's highest effective operational channel will 
    be 1604.25 MHz center frequency. Allowing for a 4 MHz guard band, 
    there will then be no restrictions on MSS in the 1.6 GHz band.
        \61\RTCA, Inc., an advisory committee to the FAA, is studying 
    out-of-band emissions from mobile earth stations among other 
    potential interference sources to GNSS receivers. RTCA, Inc. has 
    formed an Ad Hoc Interference Subgroup (AHIS) of Special Committee 
    159 (SC-159) on Global Positioning Systems. A special Joint Task 
    Group on SATCOM/GNSS Interference is also studying the mutual 
    problems of electromagnetic compatibility of AMSS and GPS/GLONASS 
    equipment operating on the same platforms or on platforms located at 
    very close distances, i.e., airport terminals. See para. 137, infra.
        \62\We note that to the extent MSS systems are launched before 
    1998, the 1610-1616 MHz portion of the 1.6 GHz band segment might 
    not be available if GLONASS is being used in the GNSS for 
    aeronautical operations. In that case, licensees can begin to 
    implement channels starting from the highest frequency range 
    downwards in conformance with the interim plan. We believe that this 
    should not present significant problems since it will occur at the 
    earliest stages of operations. We also note that it is possible that 
    the FAA will decide not to use GLONASS until it shifts its 
    frequencies to its final configuration. It may be prohibitively 
    expensive for airlines to develop and install equipment using 
    interim standards capable of protecting equipment using GLONASS. In 
    that event, we believe that it is likely that the Russian Federation 
    will advance the date to shift GLONASS frequencies to channel 6 and 
    below as early as possible. The most recent bilateral discussion 
    with the Russian Federation provides for periodic review of this 
    time table and the deployment of the MSS systems in order to resolve 
    any interference.
    ---------------------------------------------------------------------------
    
        52. We agree with the applicants that the burden of the potential 2 
    MHz shortfall should be shared among all 1.6/2.4 GHz MSS licensees. We 
    believe, however, that a transitional plan is warranted. Such a plan 
    will allow system launch to begin without potential delay and without 
    the uncertainty associated with allowing the licensees to attempt to 
    devise an interim plan on an ad hoc basis, as the Joint Proposal 
    suggests.\63\ In adopting an interim plan, we emphasize that we remain 
    optimistic that the plan will not need to be implemented. Indeed, as 
    provided in the Joint Proposal, all Big LEO operators will be 
    authorized to construct systems capable of operating across the entire 
    band allocated for that system architecture, that is, 1610-1626.5 MHz 
    for CDMA systems and 1616-1626.5 MHz for bi-directional FDMA/TDMA 
    systems. Further, even if the transitional plan is implemented, MSS 
    operators will be permitted to expand into the unused 1.6 GHz MSS 
    frequencies immediately after the GLONASS migration is completed. We 
    believe that any necessary transition among LEO licensees can be 
    completed within six months of that date.
    ---------------------------------------------------------------------------
    
        \63\We will, however, entertain a request for modification of 
    the interim plan if agreed to by all licensees.
    ---------------------------------------------------------------------------
    
        53. Our interim plan is based upon the most recent system designs 
    presented to us in the context of the Negotiated Rulemaking. Four of 
    the CDMA applicants propose to build systems using narrowband 1.25 MHz 
    transmission channels while one--TRW--proposes wider 5 MHz channels. If 
    the entire 11.35 MHz assignment designated for CDMA systems were 
    available, the narrowband licensees would be able to operate over 9 
    transmission channels, while the wider band operator would be able to 
    operate over two. If MSS cannot be provided in the 1610-1612 MHz 
    portion of the CDMA band segment because of GLONASS considerations, two 
    narrowband channels would be lost and one wideband channel would be 
    lost. Allowing CDMA licensees to shift frequencies by 1.25 MHz into the 
    designated TDMA/FDMA band at 1621.35-1626.5 MHz would provide both 
    narrowband and wideband CDMA licensees with access to one additional 
    channel. Consequently, until the entire 1610-1626.5 MHz band is 
    available for MSS operations, we will provide CDMA operators with the 
    option of operating in the 1621.35-1622.60 MHz band segment. In their 
    way, all Big LEO operators will bear some of the necessary operating 
    constraints--the narrow band CDMA operators by the net loss of one 
    channel, the wideband CDMA operators by the loss of one channel or by 
    the need to retune the center frequencies on both of its channels once 
    GLONASS is fully moved,\64\ and the FDMA/TDMA licensee by the loss of 
    operating bandwidth. Nevertheless, we are optimistic that these 
    measures will not be necessary or, if they are, that the effect on the 
    MSS industry will not be significant given their short term nature and 
    the anticipated incremental implementation of Big LEO service.
    ---------------------------------------------------------------------------
    
        \64\The additional interim bandwidth of 1.25 MHz (1621.35-
    1622.60 MHz) would allow TRW to operate two 5 MHz CDMA channels at 
    1612.60 MHz to 1617.60 MHz and 1617.60 MHz to 1622.6 MHz. If it 
    chooses to do this, it would be required to move these channels to 
    1610 to 1615 MHz and 1615 to 1620 MHz once GLONASS is moved. This 
    would require the center frequencies on each channel to be shifted 
    or retuned.
    ---------------------------------------------------------------------------
    
        e. Conditions to the plan--i. Reduction in spectrum for single CDMA 
    system: 54. Another issue raised by the LEO applicants is our proposed 
    modification to the plan in the event only one CDMA licensee goes 
    forward.\65\ In this unlikely scenario, we proposed to reduce the 
    bandwidth assigned to that system automatically from 11.35 MHz to 8.25 
    MHz. We stated that an 8.25 MHz assignment, or one-half of the 
    available 1.6 GHz MSS allocation, should be sufficient to support a 
    viable system. We noted that the remaining 3.1 MHz of spectrum would be 
    made available to an operational FDMA/TDMA system upon a showing of 
    need or, if this demonstration could not be made, to a new entrant. The 
    four parties to the Joint Proposal suggest that if one CDMA and one 
    FDMA/TDMA system become operational, the 3.1 MHz of spectrum should be 
    available to both of these licensees upon a showing of need and should 
    not be made available to new entrants. In their comments, the CDMA 
    operators argued that an automatic spectrum reduction for a CDMA system 
    with no possibility of adjustment would penalize a CDMA licensee for 
    the failure of another operator to launch a system, that it does not 
    consider the efficiency of the system or whether the CDMA system is 
    sharing spectrum with a foreign system, that it does not give CDMA 
    operators a corresponding opportunity to gain access to bands above 
    1621.35 MHz upon failure or inefficient spectrum use by the FDMA/TDMA 
    licensee, and that it will seriously impair CDMA operations. They 
    further argued that even if GLONASS is moved, the lower frequency 
    portion of the band is subject to more interservice sharing constraints 
    because of protected radio astronomy operations.
    ---------------------------------------------------------------------------
    
        \65\Under the terms of each authorization, Big LEO licensees 
    will be required to meet specified implementation milestones for the 
    system. Failure to meet these deadlines will render the 
    authorization null and void. See para. 189, infra. The bandwidth 
    adjustment discussed here would be triggered only; (1) if no CDMA 
    system is licensed: (2) if only one CDMA system is licensed; or, (3) 
    if more than one CDMA system is licensed and all but one is declared 
    null and void.
    ---------------------------------------------------------------------------
    
        55. The CDMA proponents correctly state that uncertainties are 
    present in the lower portion of the band that are not present in the 
    upper portion. As noted, GLONASS is now operating in 1610-1616 MHz band 
    and we do not know exactly when it will be moved or the limitations its 
    operations will impose on MSS operations. Further, the radioastronomy 
    service (RAS) operates on a co-primary basis in the 1610.6-1613.8 MHz 
    band. The agreement reached by the Negotiated Rulemaking Committee 
    regarding sharing between RAS and MSS imposes restrictions on MSS 
    operations provides certain operating constraints on MSS mobile earth 
    terminals in geographic areas near RAS sites.\66\ If RAS sharing proves 
    burdensome or if GLONASS is not fully moved in a timely fashion, an 
    assignment of 8.25 MHz for each of the two LEO system architectures may 
    not prove equivalent. Further, we do not know if, and the extent to 
    which, foreign systems will impact U.S. systems' operations across the 
    entire band. Consequently, we will defer any decision with respect to 
    the 3.1 MHz between 1618.25 and 1621.35 MHz until, and if, either of 
    those contingencies arises. At that time, we will have a clearer notion 
    of the extent of any inter-service sharing constraints in the lower 
    portion of the 1.6 GHz band. We will not, however, limit our 
    consideration for assignment of this band to the two licensed systems, 
    as the parties to the Joint Proposal urge. We do not think it is 
    advisable at this time to preclude new entrants from access to this 
    band. Rather, we will make the decision with respect to the 3.1 MHz, if 
    necessary, in the context of a rulemaking, based upon the circumstances 
    that have developed at that time.
    ---------------------------------------------------------------------------
    
        \66\See paras. 101-109, infra.
    ---------------------------------------------------------------------------
    
        ii. Other potential scenarios. 56. Although not specifically 
    address in the Notice, the four parties to the Joint Proposal have 
    developed a plan in the event that only one system retains a 
    construction permit. In this scenario, the Joint Proposal would provide 
    that that system, whether TDMA/FDMA or CDMA, would be given access to 
    the entire 16.5 MHz of bandwidth.
        57. We need not decide now on a course of action to be taken in the 
    event that only one Big LEO system is implemented, whether it is a CDMA 
    or TDMA/FDMA system. If and when that occurs, we will weigh a variety 
    of factors in a rulemaking, including our preference for multiple 
    entry, constraints on the assigned spectrum due to international 
    coordination agreements, system efficiency, and system loading, when 
    considering a spectrum adjustment for that system.
        f. System amendments. 58. Several of the commenters question 
    whether applicants will be permitted to change their system designs 
    when amendments are filed. TRW, for example, asks us to clarify that a 
    change in transmission techniques from CDMA to TDMA/FDMA following 
    adoption of service rules will not constitute a major amendment under 
    Commission rules. This concern apparently stems from Section 25.116(c) 
    of our rules, which provides, in general, that any pending application 
    is to be considered a newly filed application if it is amended by a 
    major amendment after a ``cut-off'' date. The rule contains several 
    exceptions, including instances where the amendment resolves frequency 
    conflicts with other pending applications, but does not create new or 
    increased frequency conflicts.\67\
    ---------------------------------------------------------------------------
    
        \67\47 CFR 25.116(c)(1).
    ---------------------------------------------------------------------------
    
        59. We have repeatedly emphasized that MSS Above 1 GHz applicants 
    who filed by the cut-off date will be afforded an opportunity to amend 
    their applications, if necessary, to bring them into conformance with 
    any requirements and policies that are adopted for satellite systems in 
    these bands.\68\ Thus, a change from a GSO system configuration to a 
    LEO system configuration to meet our satellite system design 
    requirement or a change in coverage patterns to conform with our 
    satellite visibility requirements would be permitted without affecting 
    a particular application's status in this processing group. However, a 
    change that is not necessary to bring the application into conformance 
    with our rules and which would increase frequency conflicts, such as a 
    change from a CDMA to a TDMA/FDMA architecture, would render the 
    application a newly filed application to be considered in a future 
    processing group.\69\ We recognize that if all six of the pending 
    applicants are found qualified under our Big LEO rules, our five-system 
    sharing plan will not be able to accommodate all of them. We discuss in 
    a succeeding section of this Report and Order the procedures that will 
    apply to applicants in these circumstances and that we will follow to 
    decide among the mutually exclusive applications.\70\
    ---------------------------------------------------------------------------
    
        \68\See Notice, note 2, supra, at para. 18 Public Notice, note 
    16, supra.
        \69\We note that the three CDMA applicants participating in the 
    Joint Proposal have agreed not to change to a TDMA/FDMA 
    architecture.
        \70\See paras. 88-97, infra.
    ---------------------------------------------------------------------------
    
        g. Inter-system coordination. 60. Several commenters also suggest 
    that we institute formal, but not necessarily codified, procedures or 
    guidelines for CDMA inter-system coordination in the context of 
    adopting a domestic sharing plan. Some suggest that we use the initial 
    sharing proposal submitted to the Negotiated Rulemaking Committee by 
    the CDMA applicants as the basis for a domestic framework. Indeed, the 
    three CDMA applicants participating in the Joint Proposal agree to 
    coordinate their systems in accordance with this framework 
    expeditiously and in good faith.
        61. We applaud the CDMA applicants for their good faith efforts to 
    develop a framework for coordination. We have decided, however, not to 
    incorporate these procedures in the Commission's rules. Historically, 
    we have left domestic and separate international system inter-system 
    coordination to the satellite licensees themselves, since they are in 
    the best position to weigh the technical and economic trade-offs 
    inherent in any coordination agreement.\71\ This approach has proven 
    successful. Since the CDMA applicants have represented that sharing is 
    feasible, we expect that good faith efforts to resolve any outstanding 
    coordination issues expeditiously in accordance with the Joint Proposal 
    will commence after this Report and Order is issued. If the parties 
    believe that any entity is not negotiating in good faith or if an 
    impasse is reached on any issue, we will, upon request, become involved 
    in the process and, if necessary, will devise a solution.
    ---------------------------------------------------------------------------
    
        \71\See, e.g., Hughes Communications Galaxy, Inc., 7 FCC Rcd 
    4672 (1992), at para. 8; GE American Communications, Inc. 3 FCC Red 
    6871 (1988), at para. 2; Assignment of Orbital Locations to Space 
    Stations in the Domestic Fixed-Satellite Service, 50 Fed. Reg. 35228 
    (1985), at para. 19; RDSS Licensing Order, note 37, supra, at para. 
    19.
    ---------------------------------------------------------------------------
    
        62. Another coordination issued raised by some of the commenters is 
    whether and the extent to which a guardband is necessary between CDMA 
    and TDMA/FDMA systems and, if so, which architecture would bear the 
    burden. The parties to the Joint Proposal have agreed to develop an 
    emissions mask between the CDMA and TDMA/FDMA band segments that 
    spreads the burden between them. LQP, in contrast, suggests that an 
    emissions mask may override the allocations made at WARC-92 because a 
    mask will, in essence, protect Motorola's secondary downlink 
    transmissions in the 1.6 GHz band.
        63. We need not resolve this matter now. Rather, while we recognize 
    that secondary services cannot, as a general matter, claim interference 
    protection from harmful interference from stations of a primary 
    service,\72\ we will leave the parties free to negotiate a guardband 
    agreement once the technical parameters of their amended system 
    proposals are finalized. If the parties negotiate an agreement that 
    protects secondary operations, we will accept that solution. If the 
    parties cannot agree, however, we will become involved and will look to 
    the Table of Frequency Allocations to determine where any operational 
    constraints are appropriately placed.
    ---------------------------------------------------------------------------
    
        \72\See note 21, supra.
    ---------------------------------------------------------------------------
    
    3. Plan If Mutual Exclusivity Is Not Resolved
        64. We do not intend to continue our already-prolonged attempt to 
    resolve this proceeding by compromise in the event that mutual 
    exclusivity among the Big LEO applicants is not eliminated by 
    amendments submitted by the November 16, 1994 filing deadline, as there 
    is little reason to suppose that further pursuit of that elusive goal 
    would be useful. In the Notice, we discussed three alternative 
    procedures--comparative hearing, lottery, and auction--for resolving 
    this proceeding in the event that the proposed sharing plan did not 
    resolve mutual exclusivity and called for comment concerning the 
    feasibility and/or legal availability of each of them. If an auction or 
    lottery\73\ was employed, we proposed to divide the spectrum into 
    paired 2.0625 MHz uplink and downlink segments, with eight paired 
    segments available for licensing. We proposed to limit each successful 
    bidder or lottery winner to an award of up to four 2.0625 MHz paired 
    segments, noting that this should provide ample spectrum to support a 
    Big LEO system while allowing for at least two licensees.\74\ We 
    conclude that we can lawfully resolve this proceeding by means of an 
    auction and that, of the three, an auction would better serve the 
    public interest.
    ---------------------------------------------------------------------------
    
        \73\Because the LEO applications were filed prior to July 26, 
    1993, the Commission is not statutorily prohibited from considering 
    random selection as a licensing option. See Section 6002(e) of 
    Pub.L. 103-66.
        \74\Notice, note 2, supra, at para. 45.
    ---------------------------------------------------------------------------
    
        a. Comparative hearing. 65. We continue to believe that the 
    prospect of delay in the initiation of service weighs heavily against 
    use of a comparative hearing, particularly in light of the need for 
    prompt participation by U.S. licensees in international 
    coordination.\75\ Whether conflict between Big LEO applications could 
    be resolved through a comparative hearing in less time than is 
    typically consumed in comparative hearings involving applications for 
    broadcast licenses--as TRW, the only commenter advocating use of 
    comparative hearings as a fall-back procedure, contends--is largely 
    beside the point. Even under the most optimistic assumptions, selection 
    of Big LEO licensees through a comparative hearing is likely to take 
    considerably longer than the use of a lottery or competitive bidding.
    ---------------------------------------------------------------------------
    
        \75\Id. at para. 40.
    ---------------------------------------------------------------------------
    
        66. We also believe that a comparative hearing would be inadvisable 
    for other reasons. The Commission has previously stated that 
    comparative hearings would be inconsistent with our aim of affording 
    flexibility to satellite licensees.\76\ As a general matter, moreover, 
    we are reluctant to substitute our judgment for the wisdom of the 
    marketplace by dictating outcomes based on assessment of the relative 
    merits of applicants' service proposals. We doubt whether we would be 
    able to resolve all conflicts among LEO applications based on findings 
    that certain of the applications are demonstrably technically superior 
    to others. As previously noted, satellite design decisions involve 
    complex trade-offs between engineering, marketing, and financial 
    considerations, which are difficult to evaluate without reference to 
    the functioning of the marketplace.\77\ These design decisions are also 
    modified to accommodate regulations, marketplace and financial 
    constraints and uncertainties as these uncertainties become more 
    clearly defined in time.
    ---------------------------------------------------------------------------
    
        \76\See Rules to Allocate Spectrum for Mobile Satellite 
    Services, 6 FCC Rcd 4900, 4904 (1991), at paras. 19-20; and Rules to 
    Allocate Spectrum for a Land Mobile Satellite Service, 2 FCC Rcd 
    485, 487 (1987), at para. 15.
        \77\2 FCC Rcd at 487, para. 15.
    ---------------------------------------------------------------------------
    
        b. Lottery. 67. Constellation is the only applicant that recommends 
    use of a lottery in the event that we cannot accommodate all qualified 
    applicants. It states that it favors this procedure only because it 
    believes that auctions would create unacceptable international 
    ramifications. LQP and TRW, in contrast, maintain that none of the 
    factors listed in the Conference Report on Section 309(i) that would 
    support the use of a lottery procedure is present here.\78\ LQP, 
    Motorola, and TRW also contend that a lottery would be inappropriate 
    because the pending applications involve technically diverse, non-
    fungible proposals. LQP and TRW argue that it would be unfair to the 
    existing applicants, who have invested large sums of money in research 
    and development for their proposals, to choose winners by the luck of 
    the draw. TRW warns that a random selection process here would 
    discourage planning and innovation by future applicants. Motorola 
    objects that the results of a lottery would bear no relation to the 
    best use of the available spectrum and would bestow insufficient 
    spectrum or unusable combinations of spectrum-segments upon the winning 
    applicants.
    ---------------------------------------------------------------------------
    
        \78\See 47 U.S.C. 309(i). See also H.R. Conf. Rep. No. 765, 97th 
    Cong., 2d Sess, at 37 (1982).
    ---------------------------------------------------------------------------
    
        68. We will not use a lottery in this case because we have 
    concluded that awarding Big LEO licenses through the use of competitive 
    bidding procedures would better serve the public interest. Most 
    importantly, an auction would be an economically efficient means of 
    allocation. A well-designed auction produces an outcome approximating 
    allocation to highest-valued use, which we believe promotes spectrum 
    efficiency and other public interest considerations.\79\ Use of 
    competitive bidding procedures would provide participants with the 
    incentive to conceive innovative, cost-effective and spectrum efficient 
    uses for the spectrum-blocks to be assigned and to estimate accurately 
    their potential commercial value. Further, a lottery may produce a 
    haphazard outcome. Although such an outcome might be partially 
    redressed through resale, that would entail further transaction costs. 
    We do not believe that an auction would have significant adverse 
    international ramifications, as discussed below.
    ---------------------------------------------------------------------------
    
        \79\Second Report and Order in the Implementation of Section 
    309(j)--Competitive Bidding, 9 FCC Rcd 2348, 2361 (1944) 
    (Implementation of Section 309(j), at para. 73. Moreover, an 
    efficient auction would award licenses more quickly to those that 
    value them most highly and would facilitate the efficient 
    aggregation of interdependent licenses. We also note that the 
    applicants here did not submit their proposals in reliance on an 
    expectation that the Commission would use lotteries.
    ---------------------------------------------------------------------------
    
        c. Competitive bidding. 69. Legality. Having decided that it would 
    best serve the public interest to use competitive bidding in the event 
    that the sharing plan does not resolve mutual exclusivity, we next 
    respond to arguments concerning our legal authority to do so. Section 
    309(j) (1) and (2) of the Communications Act, as amended, 47 U.S.C. 
    Sec. 309(j) (1), (2), permits auctions where mutually exclusive 
    applications for initial licenses or construction permits are accepted 
    for filing by the Commission and where the principal use of the 
    spectrum will involve or is reasonably likely to involve the receipt by 
    the licensee of compensation from subscribers in return for enabling 
    those subscribers to receive or transmit communications signals.\80\ 
    TRW, however, asserts that ``the entire thrust and substance'' of the 
    legislation authorizing the Commission to assign licenses by auction is 
    ``geared toward'' licensing for the personal communication service 
    (PCS) service and that the underlying legislative purposes ``simply do 
    not apply to * * * an inherently global * * * satellite service [for 
    which] there are currently no more than six applications.'' However, 
    nothing in Section 309(j) precludes the use of auctions for satellite 
    services, and the scope of our Section 309(j) authority to use auctions 
    clearly is not limited to PCS licensing.\81\ Indeed, we have decided to 
    use auctions for many services besides PCS.\82\ Nor does Section 309(j) 
    withhold authority to use auctions for licensing international 
    satellite systems or specify a minimum number of competing applications 
    for a class of licenses that must be on file in order for licenses to 
    be assigned by competitive bidding.
    ---------------------------------------------------------------------------
    
        \80\No commenter disputes the holding in para. 42 of the Notice 
    that Big LEO service will involve a ``use of the electromagnetic 
    spectrum'' as defined in 47 U.S.C. 309(j)(2), notwithstanding that 
    most of the applicants propose to provide service to resellers 
    rather than end-users. As we noted previously, the legislative 
    record indicates that it is irrelevant to the applicability of the 
    309(j)(2) definition whether a licensee's subscribers are end-users 
    or resellers, and we believe that understanding is consistent with 
    the plain meaning of the pertinent statutory text.
        \81\The legislative record confirms that proponents of the 
    legislation were well aware that it did not merely pertain to PCS 
    licensing. See H.R. Report No. 103-111, 103d Cong., 1st Sess., at 
    256 (1993) (``[S]ection 309(j) is a generic statute that will govern 
    the issuance of licenses in many different services''). See also 
    Implementation of Section 309(j), note 79, supra.
        \82\For example, auctions will be used to award licenses in the 
    900 MHz Specialized Mobile Radio Services and the Multipoint 
    Distribution Services. See 47 CFR 1.2102(a).
    ---------------------------------------------------------------------------
    
        70. Constellation, Motorola and LQP contend that the statute 
    forbids us from conducting an auction until we have used every means to 
    attempt to eliminate mutual exclusivity. Motorola and LQP cite 
    commentary in the House Report and in a letter from Congressman Dingell 
    to then-Chairman Quello as evidence that Congress ``clearly had the Big 
    LEO proceeding in mind when it added this language to the bill'' and 
    that it believed that mutual exclusivity could be avoided in this 
    proceeding. Further, TRW and COMSAT cite this commentary as proof that 
    Congress enacted Subsection 309(j)(6)(E) to prevent the Commission from 
    using an auction to assign Big LEO licenses.
        71. Nothing on the face of Subsection 309(j)(6)(E), or in its 
    legislative history, indicates that we are prohibited from granting Big 
    LEO licenses by auction. The text of the Section merely provides that 
    the Commission should continue to use techniques that avoid mutual 
    exclusivity among applicants. Similarly, the commentary in the House 
    Report states that it generally serves the public interest for the 
    Commission to use engineering solutions and other mechanisms to avoid 
    or eliminate mutual exclusivity and that the Commission should continue 
    to do so in the Big LEO licensing proceeding. The Report does not 
    assert, however, that if the Commission is unsuccessful in resolving 
    mutual exclusivity, the legislation bars the Commission from auctioning 
    Big LEO licenses. Rather, we construe the provision to mean that the 
    Commission is obliged to attempt to eliminate mutual exclusivity. 
    Indeed, if the Commission could avoid mutual exclusivity in every 
    instance in which it arises, no need would exist for the Commission's 
    auction authority. In the course of this proceeding, we have proposed 
    several spectrum sharing plans to that end.\83\ We do not think that it 
    would serve the public interest to continue this effort in the event 
    that the six applications before us, as amended in response to this 
    Report and Order, are mutually exclusive.
    ---------------------------------------------------------------------------
    
        \83\See, e.g., Committee Report, Addendum 1 (proposal developed 
    by FCC Representative to the Committee that would have permitted all 
    proposed systems to be licensed with some design modifications); 
    Notice, note 2, supra, at para. 38.
    ---------------------------------------------------------------------------
    
        72. Regardless of our general authority to conduct an auction in 
    the Big LEO service, TRW contends that we may not auction the allocated 
    2.4 GHz band downlink frequencies because the pending applications for 
    these frequencies are not mutually exclusive. According to TRW, all 
    four applicants desiring to use the 2.4 GHz band could do so on a 
    shared basis using the CDMA technology that all of them propose.\84\ 
    Similarly, since the same four applicants are the only ones proposing 
    to use the lower six MHz of 1.6 GHz band, TRW argues that we cannot use 
    auctions to assign authorizations for that frequency range either. As 
    TRW sees it, the only portion of the Big LEO spectrum that we can 
    auction consistently with the mutual exclusivity proviso of Subsection 
    309(j)(1) is the sector of the 1.6 GHz band between 1616-1626.5 MHz, 
    where both Motorola and the CDMA proponents have competing applications 
    on file.
    ---------------------------------------------------------------------------
    
        \84\LQP contends, moreover, that segmentation of the 2.4 GHz 
    band pursuant to the tentative auction plan outlined in the NPRM 
    would be impracticable because any CDMA system would require use of 
    all 16.5 MHz of the available 2.4 GHz band, whether it intends to 
    share that spectrum in common with other CDMA systems or to use it 
    exclusively.
    ---------------------------------------------------------------------------
    
        73. We do not agree with TRW that Subsection 309(j)(1) bars us from 
    using an auction to award licenses for the lower portion of the 1.6 GHz 
    band. There is simply not enough spectrum in the band to accommodate 
    all pending applications. While we recognize that there are certain 
    portions of the spectrum in which sharing among CDMA systems is 
    possible (i.e., the 1610-1616 MHz and the 2483.5-2500 MHz bands), these 
    frequencies cannot in themselves accommodate all proposed CDMA systems, 
    including AMSC's. Consequently, these bands cannot be separated from 
    the rest of the MSS frequencies in determining whether mutual 
    exclusivity exists and whether auctions can be employed. Moreover, we 
    are not proposing to conduct an auction until after the applicants have 
    had an opportunity to amend their applications to conform with our 
    rules. If our spectrum sharing plan does not then accommodate the 
    systems of all qualified applicants, the plan will not be implemented. 
    Rather, the 1.6 GHz band spectrum would be segmented and the qualified 
    applicants will be required, in order to preserve their eligibility, to 
    apply for a separate license for each segment that they want to use. 
    Consistent with the mutual exclusivity prerequisite of Subsection 
    309(j)(1), in the event that only a single eligible application is 
    filed for a particular segment within the filing window, the segment 
    will be assigned to the applicant requesting it. We would not assign 
    the license for a segment through competitive bidding unless two or 
    more eligible applications for it were on file. Winners would be 
    permitted to employ their choice of CDMA or TDMA/FDMA architectures.
        74. We do agree with TRW that there is no need to assign 2.4 GHz 
    band authorizations by competitive bidding. Because CDMA systems must 
    use 1.6 GHz uplink and corresponding 2.4 GHz downlink frequencies to 
    operate, we proposed in the Notice to pair 1.6 GHz and 2.4 GHz spectrum 
    blocks for auctioning.\85\ All applicants requesting authority to use 
    the 2.4 GHz band concede that they can share it using CDMA technology, 
    however. We therefore conclude that would be more appropriate to 
    license all winners of auctioned 1.6 GHz spectrum blocks to operate in 
    the space-to-Earth transmission direction in the 2483.5-2500 MHz band 
    on a shared basis using CDMA techniques.
    ---------------------------------------------------------------------------
    
        \85\Notice, note 2, supra, at para. 45.
    ---------------------------------------------------------------------------
    
        75. TRW contends that dividing sharable spectrum into segments and 
    assigning a license for each segment to the highest bidder, as we 
    proposed in the Notice, rather than assigning co-extensive licenses for 
    the entire bandwidth to as many as could share it, would be ``spectrum-
    inefficient'' and therefore ``manifestly contrary to the auction 
    legislation.'' Constellation likewise asserts that assigning licenses 
    for discrete segments of the Big LEO spectrum by competitive bidding 
    would probably eliminate any chance of CDMA sharing, as auction winners 
    would probably not consent to share use of their licensed segments with 
    competing service providers. Constellation, accordingly, contends that 
    such a licensing procedure would not promote efficient spectrum use. 
    Similarly, LQP asserts that assigning Big LEO licenses by auction would 
    deter multiple entry and competition.
        76. We do not agree that auctioning the 1.6 GHz band in band 
    segments would disserve the statutory objectives of promoting 
    competition and efficient spectrum use. First, it is not clear that 
    using an auction licensing mechanism would discourage spectrum sharing. 
    Applicants who obtain licenses for band segments by competitive bidding 
    could negotiate post-auction sharing agreements among themselves and 
    request license modifications, as TRW acknowledges in its comments.\86\ 
    If, in fact, the potential economic value of some or all of the 
    available 1.6 GHz band could best be realized through frequency 
    sharing, licensees will have an incentive to enter into such mutually 
    beneficial sharing agreements, no matter how they acquire their 
    licenses. Second, there is no evident reason to conclude that 
    competitive bidding would impede competition. Our auction rules will 
    ensure that there will be at least two providers. Further, by dividing 
    the available bandwidth into relatively small segments and allowing 
    bidders to acquire several segments and aggregate them, the number of 
    initial licensees and the amounts of spectrum held by particular 
    licensees will be determined largely by market forces.
    ---------------------------------------------------------------------------
    
        \86\TRW Comments at 102-103.
    ---------------------------------------------------------------------------
    
        77. We recognize it is possible that an auction might result in 
    fewer licensees than could otherwise have been accommodated using a 
    sharing plan. As discussed above, however, we have been unable to 
    develop a sharing plan that avoids mutual exclusivity, assuming all 
    applicants are deemed qualified. If mutual exclusivity cannot be 
    avoided by sharing, implementing an auction may achieve countervailing 
    public interest benefits. As we have explained, assigning spectrum 
    rights to those who place the highest value on them generally serves 
    the public interest because it ensures an award to the highest-valued 
    use.
        78. We do not agree with LQP that using auctions is contrary to our 
    established policy of favoring multiple entry in new satellite 
    services. We have ensured that our competitive bidding framework will 
    result in at least two licensees, thereby ensuring the benefits of a 
    competitive market structure.\87\ Moreover, insofar as our policy 
    permits marketplace incentives to determine the number of service 
    providers, the policy is fully consistent with our ``open skies'' 
    satellite policy, which was based on similar considerations.\88\
    ---------------------------------------------------------------------------
    
        \87\See para. 89, infra.
        \88\Domestic Communications Satellite Facilities, 22 FCC 2d 
    (1970), 35 FCC 2d 844 (1972), recon. in part, 38 FCC 2d 665 (1972) 
    (DOMSAT I, II, and III, respectively).
    ---------------------------------------------------------------------------
    
        79. TRW also suggests that we may not lawfully use an auction to 
    assign Big LEO licenses because of the statutory mandate concerning 
    promotion of economic opportunity. TRW claims, for instance, that the 
    statute requires the Commission, consistent with the public interest 
    and the characteristics of the proposed service, to ``prescribe * * * 
    bandwidth assignments that promote * * * economic opportunity for a 
    wide variety of applicants'' (emphasis added),\89\ which is impossible 
    here given the number of Big LEO licenses that can be awarded. TRW 
    further asserts we cannot meet the statute's requirements to afford 
    opportunity for small businesses, businesses owned by members of 
    minority groups or women, and rural telephone companies, since there 
    are no representatives of those ``designated entity'' (DE) classes 
    among the existing applicants, that it is virtually impossible for a 
    company qualifying as a small business to raise enough capital to 
    finance construction and operation of a Big LEO system, and that it 
    would be a daunting task to devise a system of viable set-asides for 
    designated entities without drastically impairing the ability of other 
    applicants to implement service.
    ---------------------------------------------------------------------------
    
        \89\47 U.S.C. 309(j)(4)(c).
    ---------------------------------------------------------------------------
    
        80. Subsection 309(j)(3) requires the Commission to seek to promote 
    ``economic opportunity and competition,'' among other goals, ``by 
    disseminating licenses among a wide variety of applicants, including 
    [DEs],'' and Subsection 309(j)(4)(D) directs us to ensure, when 
    prescribing regulations governing auction procedures or eligibility to 
    apply for licenses to be assigned by auction, that DEs are given an 
    opportunity to participate in the provision of spectrum-based services. 
    The statute, however, directs the Commission, in specifying auction 
    procedures, to pursue other objectives, aside from ensuring opportunity 
    for DEs. Among these are the goals of promoting ``the development and 
    rapid deployment of new technologies, products, and services for the 
    benefit of the public, including those residing in rural areas, without 
    administrative or judicial delays''and of promoting ``efficient and 
    intensive use of the electromagnetic spectrum.'' 47 U.S.C. 
    Sec. 309(j)(3). In the Notice, we tentatively concluded auctions would 
    further these objectives and we affirm these conclusions on this Report 
    and Order.\90\ The statute also implicitly leaves it to the Commission 
    to strike a balance in the public interest among the statutory 
    objectives.\91\ Here, only six applications are being considered. No 
    one disputes TRW's assertion that none of the applicants qualifies as 
    small, minority-owned or women-owned.\92\ It therefore would appear 
    that to disseminate Big LEO licenses to DEs we would have to open a new 
    filing window for Big LEO applications.\93\ While in some circumstances 
    it might be feasible to take such an approach, we believe that it is 
    not the case here. To ensure that this needed service is made available 
    as quickly as possible, particularly to rural residents not otherwise 
    served by the telecommunications infrastructure, and to preserve the 
    opportunity for the United States to continue its leadership role in 
    promoting global development through an enhanced global information 
    infrastructure, we are committed to awarding licenses by January 31, 
    1995.\94\ Opening a new filing window would make that goal impossible. 
    Potential new applicants would need a reasonable amount of time, 
    traditionally three months from the date of publication in the Federal 
    Register, in which to develop and submit system proposals.\95\ Opening 
    a new filing window also would be inequitable to the pending 
    applicants, who filed their proposals well before Section 309(j) was 
    enacted and who have spent considerable time and expense participating 
    in this proceeding. In light of these considerations, we believe that 
    an auction to award Big LEO licenses is an appropriate exercise of our 
    discretion.
    ---------------------------------------------------------------------------
    
        \90\See Notice, note 2, supra, at para. 43.
        \91\See Implementation of Section 309(j), note 79, supra, at 
    para. 74.
        \92\See Docket 93-253 for criteria.
        \93\DEs can, of course, participate in the Big LEO industry by 
    leasing space segment capacity, by manufacturing user handsets, or 
    by offering services to end users.
        \94\See also note 6, supra.
        \95\See NVNG MSS Order, note 48, supra. See also RDSS Licensing 
    Order, note 37, supra, where licensee was given six months to amend 
    its applications to conform to rules as adopted.
    ---------------------------------------------------------------------------
    
        81. Other considerations. In the Notice, we recognized that 
    although auctions appear advantageous for many reasons, the approach 
    might have unintended consequences internationally. In particular, we 
    noted that other countries may look to our lead in imposing these costs 
    on Big LEO systems.\96\ Given the number of countries that may be 
    served by Big LEO systems, we stated that these costs may be 
    considerable and may preclude a U.S.-owned system from serving other 
    countries. We noted, however, that these costs may not in fact be 
    significant in countries that seek to ensure that voice MSS is 
    available within its borders. We further noted that applicants will pay 
    no more than that which they determine is consistent with their 
    expected revenues from providing service in that country. Nevertheless, 
    we recognize that the international nature of the Big LEO service 
    raises concerns that are not applicable to the domestic-only services 
    for which auctions are implemented and requested comment on this issue.
    ---------------------------------------------------------------------------
    
        \96\Notice, note 2, supra, at para. 44.
    ---------------------------------------------------------------------------
    
        82. Motorola, Constellation, LQP, TRW, and COMSTAT all contend that 
    an auction is inadvisable because it would set a bad example for 
    foreign governments. If foreign governments were to use auctions to 
    assign spectrum rights, they maintain, the cost of providing global MSS 
    would be driven up, possibly to such an extent that Big LEO operators 
    would be unable to provide worldwide service. TRW asserts that the 
    consequent cost increases might deter most potential entrants, to the 
    impairment of competition, or might even make it infeasible for anyone 
    to provide Big LEO service. COMSAT speculates that foreign governments 
    might conduct auctions in a manner that places U.S. companies at a 
    disadvantage.
        83. The comments have provided no concrete evidence, however, that 
    an auction would have these harmful effects. We have concluded 
    elsewhere that, as a general matter, the public interest is served by 
    awarding licenses to those who assign the highest value to them.\97\ In 
    light of these substantial public interest benefits, the commenters' 
    mere recitals of the concerns we raised in the Notice do not persuade 
    us that auctions are inadvisable.
    ---------------------------------------------------------------------------
    
        \97\Implementation of 309(j), note 79, supra, at paras. 73-74 
    and n.65.
    ---------------------------------------------------------------------------
    
        84. We doubt, first, that our choice of licensing method for the 
    Big LEO service will determine foreign licensing practices as much as 
    the commenters predict. Foreign officials already know that we recently 
    obtained a statutory mandate for assigning spectrum licenses by 
    competitive bidding and have decided to assign licenses of enormous 
    aggregate commercial value for a variety of new services by that means. 
    We assume that those responsible for assigning spectrum rights in other 
    countries will conduct spectrum auctions if that would best serve the 
    interests that they are obligated to promote, regardless of what we 
    choose to do in this proceeding. Further, even if auctions are 
    implemented, applicants will bid no more at an auction than that which 
    they determine is economically feasible.
        85. Conversely, TRW contends that if we assign Big LEO licenses at 
    auction and foreign authorities issue such licenses to others free of 
    charge, the U.S. licensees would be at a competitive disadvantage in 
    the global market. Constellation similarly maintains that by assigning 
    the licenses at auction the Commission ``would create an incentive for 
    U.S. companies to develop LEO technology through foreign based systems 
    that did not have to spend significant amounts of capital for operating 
    licenses.'' TRW also contends that companies who purchase MSS licenses 
    in the United States at auction might encounter unfair competition from 
    INMARSAT because the INMARSAT Convention and the Communications 
    Satellite Act might be construed to require that COMSAT be allowed to 
    access INMARSAT capacity from the U.S. without paying for spectrum use.
        86. We do not believe the prospect that auctions will be conducted 
    only in the United States would disadvantage U.S. licensees globally. 
    We have not yet decided whether, and the terms on which, foreign 
    providers, including INMARSAT, will be able to provide domestic 
    service. We envision that reciprocal bilateral arrangements on a 
    country-by-country basis will be negotiated. In reaching and 
    implementing these arrangements, we will consider at that time whether 
    foreign entities not subject to U.S. auctions would have the economic 
    incentive and ability to offer domestic service at significantly lower 
    rates than Big LEO operators who purchased spectrum. Further, under 
    this scenario, both U.S. and foreign operators appear able to receive 
    licenses free of charge in a foreign country. We fail to see how this 
    would put U.S. operators at a ``global disadvantage.'' Finally, 
    contrary to Constellation's argument, we see no reason to suppose that 
    applicants who could compete successfully as providers of Big LEO 
    service in the U.S. market would lose interest in developing systems in 
    the United States merely because it would be necessary to purchase 
    licenses. If it would be undesirable to serve the U.S. market at high 
    spectrum prices, the prices paid at an auction should fall until 
    serving the U.S. market is commercially desirable.
        87. Consequently, we conclude that we have the statutory authority 
    to award Big LEO licenses through an auction process. We will implement 
    competitive bidding procedures in the event that all six pending 
    applicants file amendments on November 16, 1994 that meet all 
    requirements, including financial requirements, for the Big LEO 
    service, but their applications are still mutually exclusive.\98\ We 
    place applicants on notice that if an auction needs to be held it will 
    be scheduled as quickly as possible. Given the importance of proceeding 
    with Big LEO licensing, preparation time for the applicants will 
    necessarily be circumscribed.
    ---------------------------------------------------------------------------
    
        \98\If some applicants defer their financial showings as 
    described in para. 13, supra, all deferred applications may not be 
    able to be granted. If, at that time, we have issued some licenses, 
    we will not implement the auction procedure described below, which 
    assumes that none of the MSS spectrum has been assigned, to choose 
    among the mutually exclusive deferred applications. Rather, as 
    noted, we will develop another processing procedure at that time.
    ---------------------------------------------------------------------------
    
        d. Competitive bidding procedure. 88. Segmentation. As proposed in 
    the Notice, we will divide the 1.6 GHz band spectrum into eight 2.0625 
    MHz segments.\99\ We recognize that Constellation and LQP assert that a 
    2.0625 MHz block is ``unworkable'' because it is inconsistent with some 
    of the applicants' channelization plans, which proposed 1.25 MHz 
    channels. Further, LQP asserts that any auction of discrete bandwidth 
    segments within the 1.6 GHz band would inevitably result in some 
    applicants getting unusable, disjointed spectrum blocks. We do not 
    believe these concerns warrant a change in the proposed spectrum 
    blocks. First, two of the six applicants do not propose to use 1.25 MHz 
    channels. Moreover, any anomalies in spectrum awards can be corrected 
    in post-auction transactions, as we intend (as explained infra) to 
    allow the licensees to aggregate and disaggregate spectrum through 
    resale.
    ---------------------------------------------------------------------------
    
        \99\As discussed in the Notice, it appeared that as little as 
    2.0 MHz of spectrum could provide an individual CDMA system with the 
    same capacity as it would have operating on a shared basis over 
    11.35 MHz of spectrum. See Notice, note 2, supra, at para. 45.
    ---------------------------------------------------------------------------
    
        89. Bandwidth cap. To ensure that there are at least two Big LEO 
    providers, we will not permit any applicant to acquire more than four 
    2.0625 MHz band segments in the 1.6 GHz band, i.e., no more than 8.25 
    MHz, at auction.\100\ We would also deny permission for a post-auction 
    transaction that would result in an accumulation in excess of that 
    limit in the absence of a compelling showing of justification for a 
    waiver.
    ---------------------------------------------------------------------------
    
        \100\See Notice, note 2, supra, at para. 45.
    ---------------------------------------------------------------------------
    
        90. Competitive Bidding Design. In determining the procedures to be 
    employed if an auction of Big LEO licenses is necessary, we are guided 
    by the principles developed in PP Docket No. 93-253, the proceeding 
    instituted to implement Section 309(j) of the Communications Act. The 
    Second Report and Order in that proceeding\101\ established the 
    criteria to be used in selecting the auction design method to use for 
    each particular actionable service. The Commission received voluminous 
    comment on auction design issues. Generally, we concluded that awarding 
    licenses to those parties who value them most highly will foster 
    Congress' policy objectives. In this regard, we noted that since a 
    bidder's ability to introduce valuable new services and to deploy them 
    quickly, intensively, and efficiently increases the value of a license 
    to that bidder, an auction design that awards licenses to those bidders 
    with the highest willingness to pay the most tends to promote the 
    development and rapid deployment of new services and the efficient and 
    intensive use of the spectrum. In articulating our auction design 
    principles we agreed with the weight of the comments in that 
    proceeding--many of which were supported by academic auction design 
    experts--that: (1) licenses with strong value interdependencies should 
    be auctioned simultaneously; (2) multiple round auctions generally will 
    yield more efficient allocations of licenses and higher revenues, 
    especially where there is substantial uncertainty as to value because 
    they provide bidders with information regarding other bidders' 
    valuations of licenses; and (3) since they may be relatively expensive 
    to implement and time-consuming, simultaneous and/or multiple round 
    auctions may become less cost-effective as the value of licenses 
    decreases.\102\
    ---------------------------------------------------------------------------
    
        \101\Note 79, supra.
        \102\Id. at para. 69.
    ---------------------------------------------------------------------------
    
        91. Based on the foregoing, we concluded that where the licenses to 
    be auctioned are interdependent and their value is expected to be high, 
    simultaneous multiple round auctions would best achieve the 
    Commission's goals for competitive bidding.\103\ We indicated that 
    compared with other bidding mechanisms (such as sequential and sealed 
    bid auctions), simultaneous multiple round bidding will generate the 
    most information about license values during the course of the auction 
    and provide bidders with the most flexibility to pursue back-up 
    strategies. Thus, we concluded that simultaneous multiple round bidding 
    is most likely to award interdependent licenses to the bidders who 
    value them most highly. We also indicated that this method will 
    facilitate efficient aggregation of licenses across spectrum bands, 
    thereby resulting in vigorous competition among several strong service 
    providers who will be able rapidly to introduce a wide variety of 
    services highly valued by end users.\104\ In addition, we concluded 
    that because of the superior information and flexibility it provides, 
    this method is likely to yield greater revenues than other auction 
    designs. Thus, we found that the use of simultaneous multiple round 
    auctions would generally be preferred.\105\
    ---------------------------------------------------------------------------
    
        \103\Id. at paras. 109-111.
        \104\Id. at para. 106.
        \105\Id.
    ---------------------------------------------------------------------------
    
        92. Because, however, simultaneous multiple round bidding is likely 
    to be more administratively complex and costly both for bidders and for 
    the FCC than sequential or single round bidding, we indicated that we 
    would use this auction design only where license values are 
    interdependent and the expected value of the licenses to be auctioned 
    is high relative to the costs of conducting a simultaneous multiple 
    round auction.\106\
    ---------------------------------------------------------------------------
    
        \106\Id. at paras. 110-111.
    ---------------------------------------------------------------------------
    
        93. If it becomes necessary to employ competitive bidding 
    procedures to award Big LEO licenses, we will conduct a single 
    simultaneous multiple round auction to award licenses in those 2.065 
    MHz bands for which two or more applications have been filed.\107\ Each 
    of the characteristics that lead to selection of this auction design 
    are present here. We expect that there will be a high degree of 
    interdependence in the values of Big LEO licenses. Licenses may be 
    interdependent either because they are substitutes or because they are 
    worth more as part of a package than individually. We would expect 
    there to be some substitutability among these licenses. There may be 
    important ways in which they might be complements as well. Though all 
    will be nationwide licenses, a single entity will be able to aggregate 
    up to four licenses. It is reasonable to assume that the value that a 
    bidder places on one license will to at least some degree depend upon 
    whether it will be able to acquire other licenses. We also expect that 
    the value of Big LEO licenses will be high relative to the costs of 
    conducting a simultaneous multiple round auction, in part because as 
    the Commission gains experience with simultaneous multiple round 
    auctions, the costs associated with implementing them may fall.
    ---------------------------------------------------------------------------
    
        \107\See para. 73, supra.
    ---------------------------------------------------------------------------
    
        94. Procedural, Payment and Penalty Issues. Through our July 1994 
    auction of nationwide licenses to provide Personal Communications 
    Services in the 900 MHz band (narrowband PCS), we have gained some 
    experience with simultaneous multiple round auctions. It appears that 
    the rules we adopted concerning the procedures to be used in conducting 
    auctions, the schedule for payment for licenses, and the penalties to 
    be paid for bid withdrawal, default or disqualification, have worked 
    well.\108\ In the event that it becomes necessary to employ competitive 
    bidding in Big LEO licensing, we will conduct auctions as specified 
    under those rules. If such an auction is required, we will issue a 
    Public Notice explaining further the administrative details of the 
    auction, but we generally expect the auction will be conducted 
    similarly to the nationwide narrowband PCS auction.
    ---------------------------------------------------------------------------
    
        \108\See Sections 1.2104-1.2109 of the Commission's Rules, 47 
    CFR 1.2104-1.2109.
    ---------------------------------------------------------------------------
    
        95. In order to reduce the risk of defaults and to ensure that the 
    Commission has a ready source of funds to satisfy any bid withdrawal or 
    default penalties, we will impose a requirement that, to be qualified 
    to participate in the Big LEO auction, applicants must submit an 
    upfront payment to the Commission prior to the auction.\109\ Consistent 
    with our auction rules for Personal Communications Services, we have 
    decided to set the upfront payment at approximately two cents per MHz 
    of spectrum per person residing in the proposed service area ($0.02 per 
    MHz-pop).\110\ Because Big LEO systems must be able to provide service 
    to all areas of the fifty states, $0.02 per MHz-pop would amount to 
    approximately $10 million per 2.0625 MHz segment.\111\ For simplicity, 
    we will round this to the nearest million, and require an upfront 
    payment of $10 million.
    ---------------------------------------------------------------------------
    
        \109\The upfront payment will be fully refunded to unsuccessful 
    bidders who are not subject to bid withdrawal or default penalties.
        \110\See Implementation of Section 309(j), note 79, supra, at 
    para. 169 and 47 CFR 1.2106.
        \111\I.e., .02  x  2.0625  x  [U.S. pop.]
    ---------------------------------------------------------------------------
    
        96. Resale, aggregation and disaggregation. Aside from imposing the 
    8.25 MHz cap on aggregation, we will not restrict auction winners from 
    reselling 1.6 GHz band spectrum-rights. They would be free not only to 
    resell 2.065 MHz segments but also to reassign any smaller portion of 
    1.6 GHz band spectrum. Affording such flexibility enhances beneficial 
    incentives.\112\ Although we do not think that such post-auction 
    transactions would be likely to entail unjust enrichment,\113\ 
    applications for consent to assignment of Big LEO spectrum 
    authorizations obtained by auction will be subject to the disclosure 
    and close-scrutiny policies delineated in the Second Report and Order 
    in the auction rulemaking.\114\
    ---------------------------------------------------------------------------
    
        \112\Of course, parties to such transactions must comply with 47 
    U.S.C. 310(d) by filing applications for consent to assignment.
        \113\See Implementation of Section 309(j), note 79, supra, at 
    paras. 211-12.
        \114\Id. at para. 214.
    ---------------------------------------------------------------------------
    
        97. Assignment of 2.4 GHz band. As previously noted, all auction 
    winners will be authorized to operate over the entire 2483.5-2500 MHz 
    band, with the stipulation that operation in that band must be in the 
    CDMA mode and must be used for downlink transmissions.
    
    B. Interservice Sharing
    
        98. In the Notice, we recognized that Big LEO systems will be 
    required to share the 1.6/2.4 GHz and adjacent frequency bands with a 
    number of existing services. In the 1.6 GHz range, the 1610-1626.5 MHz 
    band is allocated to the aeronautical radionavigation service (ARNS) on 
    a co-primary basis, and a segment of the band, at 1610.6-1613.8 MHz, is 
    allocated to the radioastronomy service (RAS) on a co-primary basis. In 
    the 2.4 GHz range, the 2483.5-2500 MHz band is allocated for co-primary 
    use by the broadcast auxiliary service, by the terrestrial fixed-
    service and by industrial, scientific and medical (ISM) operations. 
    Adjacent bands are allocated to the aeronautical radionavigation 
    satellite service, the instructional television fixed service (ITFS) 
    and the multi-channel multi-point distribution service (MMDS).
        99. The Negotiated Rulemaking Committee was comprised of Big LEO 
    applicants and representatives of most parties potentially affected by 
    Big LEO services, and analyzed extensively interservice sharing at 1.6/
    2.4 GHz. We used the Committee's recommendations as the primary basis 
    the proposals in our Notice. We sought comment on those proposals as 
    well as those areas where a representative of an affected interest did 
    not participate in the Committee, or where the Committee could not 
    reach a consensus on an interservice sharing issue.
    1. Radio Astronomy Service
        100. As noted above, the 1610.6-1613.8 MHz frequency band is 
    allocated to the RAS on a co-primary basis.\115\ RAS operations involve 
    the reception of radio waves of cosmic origin,\116\ and are responsible 
    for amassing a substantial portion of information about the universe 
    that has been acquired in the last sixty years. Because the RAS 
    involves only radio reception, it cannot interfere with other services 
    operating in the same frequency band. However, it can receive harmful 
    interference from other services. As a co-primary service, the RAS is 
    entitled to protection from harmful interference. Ensuring this 
    protection is complicated by the nature of cosmic radiation emissions, 
    which are similar to random noise emissions and have extremely low 
    power flux density levels at the Earth. Further, there is a potential 
    for both in-band and out-of-band interference.\117\
    ---------------------------------------------------------------------------
    
        \115\The 4990-5000 MHz band is also allocated to the RAS on a 
    primary basis. Second harmonic spurious emissions from 2.4 GHz MSS 
    operations could cause interference of RAS in that band. See paras. 
    120-121, infra.
        \116\See International Radio Regulations 55 and 14.
        \117\An out-of-band emission is radio frequency energy, located 
    on a frequency or frequencies immediately outside the necessary 
    bandwidth, that result from the modulation process. This does not 
    include spurious emissions, which may be reduced without affecting 
    the corresponding transmission of information. See 47 CFR 2.1.
    ---------------------------------------------------------------------------
    
        a. In-band interference to the RAS. 101. The Committee was able to 
    agree on procedures that would permit sharing between Big LEOs and the 
    RAS. The Committee's task was made somewhat easier by the fact that 
    radio astronomy observations are usually conducted in remote areas and 
    are not always continuous. The Committee's proposal, developed 
    cooperatively with the Committee on Radio Frequencies (CORF),\118\ 
    would establish fixed-radius protection zones around the sixteen radio 
    astronomy sites in the United States and technical requirements for MSS 
    downlink transmissions. Based on this recommendation, we proposed to 
    establish protection zones around radio astronomy sites in the United 
    States as a means of preventing MSS transmissions from interfering with 
    RAS observations in the 1610.6-1613.8 MHz band.\119\ To that end, we 
    also proposed that ``all 1.6/2.4 GHz MSS systems shall be capable of 
    determining the position of MSS user transceivers accessing the space 
    segment through either internal radiodetermination calculations or 
    external sources such as LORAN-C or GPS.''\120\
    ---------------------------------------------------------------------------
    
        \118\CORF operates under the auspices of the National Academy of 
    Sciences and is responsible for advancing the interest of radio 
    astronomy in the United States.
        \119\See proposed Sec. 25.213(a)(1)(i)-(iii).
        \120\See proposed Sec. 25.213(a)(1).
    ---------------------------------------------------------------------------
    
        102. Big LEO parties generally agree with the fixed-radius 
    protection zone approach. However, both TRW and Constellation question 
    whether it is necessary to require all MSS systems to be capable of 
    determining the position of their user terminals.\121\ They contend 
    that a position location requirement need not be imposed on those MSS 
    systems that elect to use beacon-actuated protection systems as a means 
    for avoiding harmful interference to RAS observations.
    ---------------------------------------------------------------------------
    
        \121\TRW Comments at 120, Constellation Reply at 43.
    ---------------------------------------------------------------------------
    
        103. As we stated in the Notice, the Committee decided that a 
    beacon actuated protection system might provide an alternative to fixed 
    radius protection zones. Under such a system, a beacon would transmit a 
    signal when RAS observations were in progress. Upon receipt of this 
    signal, an MSS control center would automatically assign the MSS 
    terminal to a communications channel outside of the shared MSS-RAS 
    frequency band. The Committee concluded, however, that several 
    theoretical and practical concerns must be addressed before a beacon 
    system can be implemented.\122\ CORF continues to support that 
    position.\123\
    ---------------------------------------------------------------------------
    
        \122\Notice, note 2, supra, at n.90.
        \123\CORF Reply Comments at 4.
    ---------------------------------------------------------------------------
    
        104. Because beacon actuated protection systems are not yet fully 
    developed, we will adopt our original proposal that requires MSS 
    operators to protect RAS observations in the 1610.6-1613.8 MHz band 
    using the fixed-radius protection zone method. Nevertheless, because we 
    expect that more efficient solutions will be developed, we will permit 
    MSS licensees to use smaller geographic protection zones in lieu of the 
    specified areas upon a showing that MSS operations will not cause 
    harmful interference to an RAS observatory during periods of 
    observation.\124\ We will, however, as proposed, allow beacon-actuated 
    protection zones to be used in lieu of fixed protection zones if a 
    coordination agreement is reached between a mobile-satellite system 
    licensee and the Electromagnetic Spectrum Management Unit (ESMU) on the 
    specifics of beacon operations.''\125\ Should any of the Big LEO 
    licensees show at a later time, and coordinate with the ESMU, that 
    certain other methods can be used in lieu of the fixed-radius 
    protection zone, we will allow MSS system operators to employ these 
    methods. In the interim, however, position determination of MSS user 
    transceivers is necessary to accomplish fixed-radius zone protection. 
    Therefore, we adopt as part of Sec. 25.213(a)(1), the MSS user 
    transceiver position determination requirement as proposed in the 
    Notice.
    ---------------------------------------------------------------------------
    
        \124\See Sec. 25.213(a)(1)(v).
        \125\See Sec. 25.213(a)(1)(vii). The ESMU falls under the 
    auspices of the National Science Foundation and is responsible for 
    coordinating RAS frequencies.
    ---------------------------------------------------------------------------
    
        105. In the Notice, we also proposed that MSS user transceivers be 
    capable of terminating operations as soon as practicable upon entering 
    an RAS protection zone.\126\ LQP argues that our proposal would require 
    that calls initiated outside of an RAS protection zone be terminated as 
    soon as the MSS user transceiver moves within the protection zone, 
    which, according to LQP, would be inordinately complex and costly.\127\ 
    LQP suggests that our rules should permit the call to be switched 
    successfully to frequencies outside of the RAS bands (during RAS 
    observations) before operations are terminated to that unit.\128\
    ---------------------------------------------------------------------------
    
        \126\See proposed Sec. 25.213(a)(1)(v). Notice, note 2, supra, 
    at para. 50.
        \127\LQP Reply at 58.
        \128\LQP Comments at 64.
    ---------------------------------------------------------------------------
    
        106. We believe that LQP's suggestion is reasonable. Allowing calls 
    initiated prior to entering an RAS protection zone to continue until a 
    non-RAS frequency is found will ensure continuity of service to the MSS 
    user. Further, we believe that other requirements that we are adopting, 
    such as the notification requirement that is described below, will 
    ensure that RAS operations are not affected adversely. Therefore, we 
    modify proposed Sec. 25.213(a)(1)(v) as suggested by LQP.
        107. We also proposed in the Notice to require that the ESMU notify 
    MSS licensees in the 1610.6-1613.8 MHz band of radio astronomy 
    observations.\129\ This requirement was proposed to ensure that MSS 
    operations terminate as soon as possible after an MSS user transceiver 
    enters a RAS protection zone where observations are being made. CORF 
    suggests that it could meet this requirement by providing MSS operators 
    with schedules of RAS observations.\130\ TRW disagrees, stating that 
    CORF should be required to provide notification ``of periods of actual 
    radio astronomy observations rather than a general schedule.''\131\ We 
    agree with TRW that it would not be overly burdensome for the ESMU to 
    notify the small number of licensed in-band Big LEO operators of 
    periods of actual RAS observations. This will help ensure that no 
    interference is caused to RAS observations in the event that a schedule 
    is changed.
    ---------------------------------------------------------------------------
    
        \129\See proposed Sec. 25.213(a)(1)(v).
        \130\CORF Comments at 4-5.
        \131\TRW Reply Comments at 72.
    ---------------------------------------------------------------------------
    
        108. In a related matter, Motorola notes that the Committee 
    suggested that RAS observations not be scheduled during peak MSS/RDSS 
    traffic periods to the extent possible.\132\ CORF does not object to 
    this proposal.\133\ RAS observations are usually carried out in remote 
    areas and are not continuous. Even during peak MSS traffic periods, the 
    majority of MSS traffic should not occur in RAS observation areas. We 
    do not therefore believe that adherence to this provision will be 
    burdensome to RAS. Consequently, we include this provision in our rules 
    in Sec. 25.213(a)(4).
    ---------------------------------------------------------------------------
    
        \132\Motorola Comments at 55, n. 41.
        \133\Specifically, CORF supports insertion of the following text 
    in the rules: ``The RAS shall avoid scheduling radio astronomy 
    observations during peak MSS/RDSS traffic periods to the greatest 
    extent practicable.'' See CORF Reply at 2.
    ---------------------------------------------------------------------------
    
        109. Finally, TRW requests that we agree to solicit public comment 
    before we require MSS systems to protect additional RAS sites beyond 
    the sixteen sites specified in the rules.\134\ In bands shared by two 
    or more services on a co-primary basis, new facilities in either 
    service must be coordinated among affected operators. As provided for 
    in proposed rule Sec. 25.213(1)(a)(viii), which we adopt, we will 
    solicit comment with respect to protection from additional RAS sites.
    ---------------------------------------------------------------------------
    
        \134\Proposed Sec. 25.213(a)(1)(vii).
    ---------------------------------------------------------------------------
    
        b. Out-of-band interference to RAS from primary MSS uplinks at 1.6 
    GHz. 110. In the Notice, we also recognized that MSS uplink operations 
    in the 1613.8-1626.5 MHz portion of the band could cause unacceptable 
    out-of-band interference into RAS operations at 1610.6-1613.8 MHz. We 
    also noted the Committee's suggestion to establish fixed protection 
    zones similar to, but smaller than, those recommended for in-band 
    emissions, although we did not propose a rule in this regard.\135\
    ---------------------------------------------------------------------------
    
        \135\Notice, note 2, supra, at para. 51.
    ---------------------------------------------------------------------------
    
        111. CORF suggested several alternatives to our proposals:\136\
    ---------------------------------------------------------------------------
    
        \136\See CORF Comments at 3-4.
    ---------------------------------------------------------------------------
    
        (1) To require that the power flux density (pfd) level reaching RAS 
    sites from a mobile user terminal operating anywhere in the 1610-1626.5 
    MHz band not exceed the pfd from a mobile user terminal operating 
    within the RAS 1610.6-1613.8 MHz band segment at the edge of the 
    protection zone applicable for that site, or
        (2) To prohibit mobile terminal operations within the 1613.8-1615.8 
    MHz band during RAS observations within protection zones of 100 km or 
    30 km around RAS sites depending upon the type of observatory 
    involved.\137\
    ---------------------------------------------------------------------------
    
        \137\Radio astronomy observatories use two types of antennas. 
    Observatories with a very long baseline array (VLBA) use 
    interconnected radio telescopes that are dispersed in widely 
    separated locations. Due to the geographic separation of the 
    telescopes, the chance of correlated interference from any single 
    mobile earth terminal is small. Consequently, VLBA sites are not as 
    susceptible to interference as are observatories using a single 
    radio telescope. Eleven of the 16 radio astronomy sites in the U.S. 
    are VLBA sites and they require relatively smaller protection zones 
    than non-VLBA sites.
    ---------------------------------------------------------------------------
    
        112. The MSS parties generally oppose restrictions on out-of-band 
    emissions for the purpose of protecting RAS. For example, Constellation 
    argues that MSS out-of-band levels should not be unilaterally defined 
    by the radio astronomy community without any regard to the impact those 
    levels would have on other services.\138\ TRW states that it could 
    agree to CORF's suggestions if a compliant mobile user terminal were 
    not required to undertake further coordination with the RAS. TRW notes, 
    however, that CORF's out-of-band protection proposals would relegate 
    MSS to co-primary or even lower status in frequency bands that are not 
    allocated to the RAS.''\139\ Only LQP generally agrees with CORF's 
    suggestion. According to LQP, there is sufficient 1.6 GHz band spectrum 
    to switch MSS users near RAS sites from potentially interfering 
    channels to channels separated from RAS observations.\140\
    ---------------------------------------------------------------------------
    
        \138\Constellation Comments at 47.
        \139\TRW Reply at 71.
        \140\LQP Reply Comments at 57, Reply Tech Appendix at 2.1.
    ---------------------------------------------------------------------------
    
        113. We have considered the impact of this proposal on Big LEO 
    licensees and conclude they would not be unduly burdened by protecting 
    RAS observations from out-of-band MSS emissions. It appears that less 
    than one percent of the MSS consumer use would be affected by CORF's 
    alternative proposals for protecting RAS from out-of-band MSS 
    emissions.\141\ Further, those affected would not be denied 
    communications. They would simply be assigned to another uplink channel 
    by the MSS network control center. We do not believe that the CORF 
    proposals relegate the MSS to co-primary or even lower status. The RAS 
    is seeking protection in bands only in the 1610.6-1613.8 MHz band, 
    which is allocated to the RAS. Therefore we adopt CORF's proposals to 
    protect RAS, during observations, from out-of-band emissions caused by 
    Big LEO systems. If Big LEO operators cannot meet the power density 
    levels necessary to protect RAS from harmful interference, we will 
    require that Big LEO operations be terminated within the protection 
    zones specified in Sec. 25.213(a)(1)(iii).
    ---------------------------------------------------------------------------
    
        \141\CORF Reply Comments at 8.
    ---------------------------------------------------------------------------
    
        c. Out-of-band interference to RAS from secondary downlinks in the 
    1.6 GHz band. 114. In the Notice, we proposed to codify the Committee's 
    recommendations to eliminate potential harmful out-of-band interference 
    to RAS from secondary MSS downlinks operating at 1613.8-1626.5 
    MHz.\142\ The Committee recommended that such operations be restricted 
    to frequencies separated by the upper edge of the RAS band by at least 
    2.2 MHz, that MSS downlink emissions be filtered aboard the spacecraft, 
    that frequencies be selectively controlled and that an analysis and 
    testing program be conducted in cooperation with the radio astronomy 
    community. Based on its deliberations, the Committee proposed that we 
    adopt rules governing use of the 1613.8-1626.5 MHz band that limit out-
    of-band emissions so that they do not exceed -238 dB(W/m\2\/Hz) during 
    observations at non-VLBA sites and -198 dB(W/m\2\/Hz) during 
    observations at VLBA sites.
    ---------------------------------------------------------------------------
    
        \142\Notice, supra note 2, at para. 51; see also proposed 
    Sec. 25.213(a)(2).
    ---------------------------------------------------------------------------
    
        115. Motorola argues that the limits proposed in the Notice are too 
    rigid and would unduly constrain MSS operations.\143\ In support, 
    Motorola contends that those limits were devised originally using 
    assumptions that are not applicable to Big LEO operations. For example, 
    Motorola notes that the calculations assumed an immobile, continuous 
    interference source, whereas secondary MSS downlink LEO operations 
    would present an intermittent source. Further, Motorola notes that 
    although the Committee reached a consensus on a recommendation 
    regarding limits, it did not agree on a proposed rule to govern Big LEO 
    MSS operations. Motorola asserts that instead of adopting specific 
    protection limits applicable to MSS secondary downlinks, the Commission 
    should only restate the general obligation that secondary services not 
    cause harmful interference to primary services.
    ---------------------------------------------------------------------------
    
        \143\Motorola Comments at 54.
    ---------------------------------------------------------------------------
    
        116. LQP and TRW disagree with Motorola. LQP states that our 
    proposal is reasonable and should be adopted.\144\ TRW asserts that 
    Motorola's proposal does not adequately consider the needs of the RAS. 
    It states, however, that if secondary downlinks are limited to the 
    1621.35-1626.5 MHz band, thereby creating a 7.5 MHz guardband between 
    RAS and secondary MSS, Motorola's proposals would be acceptable.\145\
    ---------------------------------------------------------------------------
    
        \144\LQP Reply at 59-60.
        \145\TRW Reply Comments at 74.
    ---------------------------------------------------------------------------
    
        117. We recognize the need to protect RAS observations from 
    secondary MSS downlink operations. At this juncture, however, we need 
    not consider specific limits on Big LEO MSS secondary downlinks. 
    Secondary services by definition shall not cause harmful interference 
    nor claim protection from primary services.\146\ This provision applies 
    to protection of primary services from both in-band and out-of-band 
    emissions and would apply to secondary MSS downlinks regardless of 
    specified pfd levels. Thus, we see no reason to codify specific pfd 
    limits as proposed in the Notice. We will instead modify proposed 
    Sec. 25.213(a)(2) to note that secondary MSS downlinks shall not cause 
    harmful interference to primary RAS operations in the 1610.6-1613.8 MHz 
    band. Further, operators of secondary downlinks will be required to 
    take whatever steps necessary to resolve interference complaints by 
    radio astronomers. We expect that an applicant proposing to operate MSS 
    downlinks in the 1613.8-1626.5 MHz band will be able to demonstrate in 
    its application that it has sufficient satellite out-of-band emission 
    attenuation to protect adjacent band U.S. RAS operations based upon the 
    frequency separation inherent in the frequency assignment scheme 
    adopted here.
    ---------------------------------------------------------------------------
    
        \146\See note 21, supra. 
    
        118. Finally, Cornell University, Arecibo Observatory, notes its 
    concern that MSS downlink transmissions at 1.6 GHz could have a 
    ``disastrous effect'' on passive space research in the 1610-1667 MHz 
    band.\147\ LQP, in support of Cornell, notes that the Commission must 
    limit MSS downlink transmissions to the 5.15 MHz proposed in the 
    Commission's Notice, that is, to 1621.35-1626.5 MHz.\148\ Motorola 
    responds that ``the 1613.8-1660 MHz band is not allocated to the RAS on 
    a primary or secondary basis'' and thus is not entitled to protection 
    ---------------------------------------------------------------------------
    from secondary MSS downlinks operating outside that band.\149\
    
        \147\Cornell Comments at 3-5. The 1610-1667 MHz band is being 
    used passively, without any allocation, by radio astronomers to 
    observe red-shifted Hydroxyl (OH) emissions.
        \148\LQP Reply Comments at 59.
        \149\Motorola Reply Comments at 49.
    ---------------------------------------------------------------------------
    
        119. There is no RAS allocation in the 1613.8-1660 MHz band and the 
    service is therefore not entitled to protection in these bands. 
    Consequently, we will not limit MSS transmissions in order to protect 
    RAS as suggested by Cornell University and LQP. In any case, we do not 
    believe that RAS observations above 1634 MHz would be affected by 
    secondary MSS downlinks in the 1621.35-1626.50 MHz band given the 
    frequency separation.
    
        d. Spurious emissions into the 4990-5000 MHz from primary downlinks 
    in the 2483.5-2500 MHz band. 120. The Commission recognized that second 
    harmonic spurious emissions from primary MSS downlink transmissions in 
    the 2483.5-2500 MHz band could cause unacceptable interference to RAS 
    operations in the 4990-5000 MHz band. It concluded and we proposed in 
    Sec. 25.213(a)(3) that MSS downlink out-of-band spectral power flux 
    density (spfd) levels should be limited to -241 dB)W/m\2\/Hz) in the 
    4990-5000 MHz band.
    
        121. We will adopt the rules as proposed. Although Constellation 
    argues that it opposes any such codification of the radio astronomy 
    community's definition of ``unacceptable'' interference,\150\ we note 
    that Constellation participated in the Committee and its deliberations 
    and agreed to the Committee's Report that included this recommendation. 
    More importantly, as stated in the Notice, we believe that these limits 
    can be readily met through proper amplifier device selection and 
    operating conditions in combination with post-amplifier filtering.
    
        \150\Constellation Comments at 48.
    ---------------------------------------------------------------------------
    
    2. Aeronautical Radionavigation Satellite Service and Radionavigation-
    Satellite Service
    
        122. The U.S. Global Positioning System (GPS) can operate under the 
    radionavigation-satellite (space-to-Earth) service (RNSS) allocation in 
    the 1565.2-1585.6 MHz band. GPS is a space-based positioning, velocity, 
    and time system whose space segment, when fully operational, will be 
    composed of 21 operational satellites in six orbital planes. GLONASS, 
    the Russian Global Navigation Satellite System, can operate under the 
    same service allocation in the 1597-1610 MHz bands.\151\ Additionally, 
    GLONASS can operate under the aeronautical radionavigation service 
    (ARNS) allocation in the 1610-1616 MHz band pursuant to RR 732 of the 
    international Radio Regulations.\152\ The GLONASS system will include 
    24 operational satellites in three orbital planes. The user segment of 
    both the GPS and GLONASS systems will consist of antennas and receiver-
    processors that can receive both GPS and GLONASS signals to provide 
    positioning, velocity, and precise timing to the user. The Committee 
    addressed ARNS/RNSS-MSS sharing and developed specific recommendations 
    in that regard. We based the sharing proposals in the Notice on the 
    Committee's recommendations and on requirements embodied in the 
    International Radio Regulations.
    
        \151\See Notice, note 2, supra, at para. 53.
        \152\RR 732 reserves the 1610-1626.5 MHz band on a worldwide 
    basis for the use and development of air navigation and directly 
    associated terrestrial or satellite based facilities. It also 
    provides that any satellite use of the band is subject to agreement 
    under the procedures of Article 14 of the International Radio 
    Regulations. Pursuant to the international Radio Regulations, MSS 
    stations may not cause harmful interference to or claim protection 
    from stations operating in accordance with RR 731E.
    
        a. In-band interference to ARNS and MSS uplinks in the 1610-1626.5 
    MHz band. 123. Pursuant to international Radio Regulations, MSS 
    stations may not cause harmful interference to or claim protection from 
    stations operating under RR 732. Further, international Radio 
    Regulation RR 731F provides that MSS earth stations operating with MSS 
    space stations cannot radiate an equivalent isotropically radiated 
    power (e.i.r.p.) density greater than -15 dB(W/4KHz) in that portion of 
    the band used by systems operating in accordance with RR 732, and -3 db 
    ---------------------------------------------------------------------------
    (W/4KHz) in bands not so used.
    
        124. The Committee concluded that GLONASS receivers operating on-
    board high altitude aircraft could be protected against interference 
    from MSS operations operating in accordance with RR 731E.\153\ It also 
    concluded that protection would not be possible if GLONASS is used for 
    aircraft approach and terminal communications, as is contemplated by 
    the FAA.\154\ The Committee recommended and we proposed in 
    Sec. 25.213(c)(1) to codify the uplink e.i.r.p. limits contained in RR 
    731E. The Committee had stated that this limit is needed to allow the 
    proposed Big LEO systems to be implemented, although it acknowledged 
    that it will not protect GLONASS if GLONASS is used to provide aircraft 
    approach and terminal communications as a component of a ``sole means'' 
    GNASS. The Committee also examined several methods to improve the ARNS/
    RNSS-MSS sharing environment. One was to reconfigure GLONASS so that it 
    would operate only on frequencies below 1610 MHz.\155\ Another method 
    for improving sharing possibilities, it noted, would be to modify 
    GLONASS receiver standards to reduce band MSS. Alternatively, it 
    suggested that the U.S. GPS be enhanced to lessen or eliminate reliance 
    on GLONASS altogether. Further, the Committee recommended, and we 
    proposed in Section 25.213(c)(2), that to protect operations of GLONASS 
    receivers on-board aircraft, MSS terminals should be prohibited from 
    being used on civil aircraft.
    ---------------------------------------------------------------------------
    
        \153\The Committee analyzed the potential levels of interference 
    from a typical CDMA mobile unit to a GPS/GLONASS receiver. It 
    concluded that MSS units would not interfere with enroute GLONASS 
    navigation at altitudes in excess of 10,000 meters (Committee 
    Report, note 23, supra, at 3.3.4.3). However, aviation parties 
    participating in the Committee stated that the analysis was 
    inadequate to demonstrate interference compatibility at a 95 percent 
    confidence level.
        \154\See para. 49, supra. For a further discussion of the 
    disparity between ARNS protection requirements and MSS user terminal 
    e.i.r.p. requirements, see Committee Report, note 23, supra at 18-
    21.
        \155\The Committee offered two possible methods for limiting 
    GLONASS operations to frequencies below 1610 MHz. One would be to 
    reconfigure the GLONASS frequency plan. Currently, the plan is for a 
    total of 24 GLONASS satellites to operate using 24 discrete downlink 
    carrier frequencies. However, GLONASS statellites currently under 
    construction have the ability to operate on any of the 24 
    frequencies distributed between 1602 and 1615.5 MHz. This frequency 
    agility could allow antipodal satellites (those above opposite areas 
    of the earth) to operate using the same frequencies. Thus, the 
    entire system could operate using 12 frequencies below 1610 MHz. The 
    other method would be to shift all 24 GLONASS frequencies to 
    spectrum below 1610 MHz. The Committee noted however, that this more 
    radical approach might require redesign of the GLONASS system. In 
    any event, both the aviation community and the Big LEO community 
    have indicated that they fully expect GLONASS to shift to 
    frequencies below 1610 MHz at some point. The recent bilateral 
    coordination meeting with the Russian Federation have confirmed that 
    the GLONASS system will shift its frequencies to below 1606 by 2005 
    or sooner.
    ---------------------------------------------------------------------------
    
        125. Aeronautical Radio, Inc., and the Air Transport Association of 
    America (ARINC/ATA), Rockwell International Corporation (Rockwell), and 
    the FAA argue that both GLONASS and GPS operations, as potential 
    components of the GNSS, must be protected during all phases of flight 
    over the United States. To that end, they proffer additional 
    limitations on Big LEO operations. ARINC/ATA argues that the Commission 
    should clarify that the RR 731E limitation of -15 dB (W/4kHz) for MSS 
    mobile terminals should apply only after GLONASS moves to frequencies 
    below 1610 MHz. Until then, they contend, the limit should be -78.5 dB 
    (W/MHZ).\156\ Similarly, Rockwell states that the RR 731E limit is 
    insufficient for protecting GLONASS operations at 1610-1616 MHz. 
    Rockwell claims that the RR 731E power density level is about 140 dB 
    above the maximum interference level that can be tolerated by a typical 
    GLONASS receiving system. Rockwell asserts that shared use of this band 
    segment is impractical absent significant constraints on either MSS or 
    GLONASS. Therefore, it maintains that MSS operation should not be 
    permitted in the 1610-1616 MHz band segment until GLONASS operations 
    are shifted to frequencies below 1610 MHz.\157\ The FAA states that the 
    Commission indicated that use of the 1610-1616 MHz band by MSS is 
    premised upon moving GLONASS below 1610 MHz. It maintains that the 
    e.i.r.p. density specified in RR 731E is too high to protect in-band 
    GLONASS for anything but high altitude enroute communications.\158\
    ---------------------------------------------------------------------------
    
        \156\ARINC/ATA Comments at 2-3.
        \157\Rockwell Comments at 2-3.
        \158\FAA Comments at 2.
    ---------------------------------------------------------------------------
    
        126. Several of the MSS applicants also disagree that more 
    restrictive limits should be placed on MSS uplinks pending a GLONASS 
    frequency shift. Constellation states that more realistic interference 
    criteria and models must be developed before any requirements other 
    than the RR 731E uplink e.i.r.p. density limit can be adopted.\159\ 
    Ellipsat contends that no additional requirements should be adopted 
    because the aviation community has not provided a legitimate basis for 
    overly stringent requirements on MSS uplinks. Further, Ellipsat 
    maintains that even if GLONASS becomes a component of the GNSS, the 
    aviation community has not provided a showing that GNSS performance 
    would be impaired if degradation were to occur to the small number of 
    GLONASS satellites that would operate above 1610 MHz.\160\ Motorola 
    claims that the proposed limits advocated by the aviation community are 
    based on flawed assumptions and unsound analysis. Additionally, 
    Motorola asserts that the protection the aviation parties claim as 
    necessary is based on the erroneous assumption that corrupting a single 
    measurement from a GLONASS satellite will cause unacceptable 
    degradation in the ability to navigate.\161\
    ---------------------------------------------------------------------------
    
        \159\Constellation Reply Comments at 47.
        \160\Ellipsat Reply at 11.
        \161\Motorola Reply Comments at 51. Motorola notes that a study 
    conducted for LQP by Sat-Tech Systems demonstrates that loss of a 
    single satellite will never cause a loss of GNSS (LQP Comments at 
    Technical Appendix, para. 2.2.1 at 12). In addition, the Committee 
    performed an analysis of the availability of GNSS satellites if the 
    GLONASS constellation operated only on frequencies below 1610 MHz. 
    It concluded that a minimum of five satellites would always be 
    available for GNSS. In addition, it noted that this minimum would 
    occur for only 14 minutes in every 51-day period. It noted further 
    that since only four GNSS satellites are required for navigation and 
    an additional one satellite for system integrity, it appears that 
    GLONASS satellites operating above 1610 MHz might not be required 
    for either navigation or terminal approach communications. Committee 
    Report, note 23, supra at 3.3.4.4.
    ---------------------------------------------------------------------------
    
        127. Several MSS applicants also state that, to afford new MSS 
    systems flexibility in how they protect ARNS/RNSS, the Commission 
    should modify proposed rule Sec. 25.213(c)(1), which, in addition to 
    the uplink limits contained in RR 731F, requires all MSS operations in 
    the 1.6 GHz band to be coordinated with systems operating pursuant to 
    RR 732. Motorola argues that rules embodied in the International Radio 
    Regulations are adequate for ensuring coordination with and protection 
    of other services.\162\ Constellation contends that footnote RR 731E 
    establishes the only enforceable interference criteria (i.e., a maximum 
    e.i.r.p. density of -15 dB (W/4kHz) from MSS transmitters) that can be 
    incorporated into the Commission's rules at this time. Motorola, in 
    contrast, suggests that the e.i.r.p. value set forth in 
    Sec. 25.213(c)(1) be interpreted as a coordination trigger rather than 
    an absolute limit.\163\ LQP states that the proposed rule requires MSS 
    systems to protect GLONASS beyond the limits specified in RR 731E.\164\
    ---------------------------------------------------------------------------
    
        \162\Motorola Reply Comments at 47.
        \163\Motorola Comments at 55.
        \164\LQP Comments at 66-67.
    ---------------------------------------------------------------------------
    
        128. We do not believe it is necessary to protect GLONASS 
    operations beyond the provisions of RR 731E and the obligation to 
    coordinate MSS systems under current International Telecommunications 
    Union (ITU) procedures. RR 731E states clearly that MSS stations shall 
    not cause interference to, nor claim protection from ARNS stations 
    operating in accordance with RR 732. In addition, under ITU Resolution 
    46, Big LEO licensees would be subject to whatever limits or conditions 
    agreed upon during the coordination process. GLONASS would likely be 
    part of the coordination negotiations. Accordingly, we reject the 
    aviation community's requests that additional limits be placed on MSS 
    operations pending a GLONASS move, particularly absent definitive 
    technical characteristics and requirements of a future GNSS system, and 
    a definitive statement as to GLONASS's role in the GNSS.\165\ Further, 
    imposing additional constraints on Big LEO use of the 1610-1616 MHz 
    band could jeopardize the applicants' ability to implement their 
    systems. This could deprive the United States and those countries who 
    choose to participate in offering services the potential benefits that 
    Big LEOs could bring. Conversely, we do not believe the limits in RR 
    731E should be relaxed, as Motorola suggests. It is clear -15 dB(W/
    4kHz) is a limit and not a threshold for coordination. Therefore, we 
    adopt the e.i.r.p. limits embodied in RR 731E in Section 25.213(c)(1) 
    with the requirement that coordination of MSS mobile earth terminals 
    must be undertaken according to the provisions of Resolution 46 (WARC-
    92).
    ---------------------------------------------------------------------------
    
        \165\LQP notes that the FAA has suggested that it is still 
    studying how GLONASS ``best fits'' a GNSS. LQP Reply at 62.
    ---------------------------------------------------------------------------
    
        129. We also adopt our proposed rule that prohibits operation of 
    Big LEO terminals on-board civil aircraft unless the terminal has a 
    direct connection to the aircraft's Cabin Communication System. 
    However, we agree with Constellation and others that this is a 
    transceiver operating provision and is not necessarily a sharing 
    requirement. Therefore, since this provision is contained in 
    Sec. 25.136(a) of our rules, it need not be repeated in Sec. 25.213. 
    Consequently, we do not adopt proposed rule Sec. 25.213(c)(2) and refer 
    licensees to Sec. 25.136(a).
        b. Out-of-band interference to ARNS/RNSS in the 1559-1610 MHz band. 
    130. Protection of GPS from out-of-band emissions from primary uplinks 
    in the 1610-1626.5 MHz band. The Committee concluded that out-of-band 
    emissions by MSS uplinks in the 1610-1626.5 MHz band could potentially 
    interfere with GPS operations near 1575 MHz. The Committee found, 
    however, that sharing is possible if appropriate limits are put on out-
    of-band emissions from MSS user transceivers.\166\ The Committee 
    recommended, and we proposed, that MSS user transceivers limit out-of-
    band emissions (for broadband noise emissions) so as not to exceed an 
    e.i.r.p. density of -70 dBW/1MHz averaged over any 20 millisecond (ms) 
    period in any portion of the 1574.397-1576.443 MHz band. For any 
    discrete spurious emissions in the same band (i.e., bandwidth less than 
    600 Hz), the user transceiver e.i.r.p. density is not to exceed -80 
    dbW.\167\
    ---------------------------------------------------------------------------
    
        \166\See Committee Report, note 23, supra, at para. 5.2.2.7.
        \167\See proposed Sec. 25.213(b).
    ---------------------------------------------------------------------------
    
        131. ARINC/ATA agrees that the proposed limits will protect 
    GPS.\168\ The FAA, however, recommended that the protection bandwidth 
    for GPS ``be established at least 20 MHz wide (i.e., 1575.42+/-10 
    MHz).''\169\ No technical analysis was provided to support this 
    recommendation.
    ---------------------------------------------------------------------------
    
        \168\See ARINC/ATA Comments at 3.
        \169\See FAA Comments at 3.
    ---------------------------------------------------------------------------
    
        132. TRW, Ellipsat, and LQP contend that the proposed out-of-band 
    emission limits should be relaxed.\170\ They contend that relaxing the 
    limits will allow for reasonably priced user terminals and will 
    adequately protect GPS from out-of-band emissions from these terminals. 
    Constellation, in contrast, supports the proposed limits. It states 
    that the protection level of GPS receivers is reasonable given the 
    frequency separation between the lower end of the MSS band at 1610 MHz 
    and GPS signals at 1575.42 MHz.\171\
    ---------------------------------------------------------------------------
    
        \170\LQP suggested that the limit be -50 dBW/1 MHz averaged over 
    any 20 ms period in any portion of the 1575.42+/-1.023 MHz band for 
    broadband noise emissions. LQP Comments at 65. See also TRW Reply at 
    77 (n. 118), Ellipsat Reply at 11 (n.7).
        \171\Constellation Comments at 49.
    ---------------------------------------------------------------------------
    
        133. We believe that the proposed out-of-band emission limits for 
    MSS user transceiver operations in the 1610-1626.5 MHz band are 
    appropriate to protect GPS operations near 1575 MHz. Both the aviation 
    and MSS parties participated in the Committee's deliberations that 
    resulted in a consensus on an out-of-band emission limit for protecting 
    GPS. No party has demonstrated that a modification of those limits is 
    now warranted. The MSS parties do not demonstrate that the limits are 
    overly restrictive or that significant additional costs would be 
    incurred by building transceivers to meet the limits. Similarly, the 
    aviation parties have not shown that additional protection bandwidth 
    for GPS is necessary. We therefore adopt proposed Sec. 25.213(b) with 
    minor editorial changes.
        134. Protection of GLONASS from out-of-band emissions from primary 
    uplinks in the 1610-1626.5 MHz band. The Committee also addressed 
    potential MSS out-of-band interference to GLONASS operations below 1610 
    MHz, but did not reach a consensus. It did, however, suggest a 
    methodology that could be used to determine appropriate limits. It also 
    noted that there was general agreement that the MSS user transceiver 
    out-of-band emission limits recommended for protecting GPS would be 
    sufficient to protect GLONASS operations below 1610 MHz.\172\ We 
    requested comment on the proposed methodology and on the appropriate 
    parameters to be used in developing protection criteria.
    ---------------------------------------------------------------------------
    
        \172\See Committee Report, note 23, supra, at para. 5.2.2.7.
    ---------------------------------------------------------------------------
    
        135. ARINC/ATA and Rockwell maintain that the MSS out-of-band 
    emission limits appropriate for protecting GPS operations near 1575 MHz 
    should similarly apply to GLONASS operations below 1610 HMz.\173\ The 
    FAA suggests an interference threshold of -145 dBW/1MHz of GLONASS 
    receivers operating below 1610 MHz and calculates a -71 dBW/1MHz MSS 
    user terminal out-of-band emission limit which, it argues, is necessary 
    to protect GLONASS operations at that particular interference 
    threshold.\174\.
    ---------------------------------------------------------------------------
    
        \173\See ARINC and ATA Comments at 3 and Reply at 7; Rockwell 
    Comments at 4.
        \174\FAA Comments at 3-4.
    ---------------------------------------------------------------------------
    
        136. The MSS applicants question whether the assumptions made by 
    the aviation parties in their analyses are appropriate and disagree 
    that a direct correlation can be made between the out-of-band emission 
    limits necessary for protecting GPS and the limits necessary for 
    protecting GLONASS below 1610 MHz. Constellation, for example, noted 
    that the provisions to protect GPS from MSS out-of-band emissions were 
    agreed to in the Committee, but that agreement was ``without prejudice 
    to the application of the interference protection model to any other 
    case, i.e., GLONASS, where it would be impractical to provide this same 
    level of protection and for which other solutions are required to avoid 
    harmful interference.''\175\ LQP notes that while the FAA, ARINC and 
    ATA seek protection of individual GLONASS signals, they have not 
    provided an analysis of why such protection is required to ensure the 
    integrity of the GLONASS system.\176\ Motorola contends that the 
    analyses conducted by the aviation community are ``skewed'' because 
    they have assumed that the MSS transmitter and the aircraft receiver 
    are static when, in fact, both devices are usually mobile.\177\ 
    Motorola also lists a number of factors which it argues would provide a 
    more accurate determination of necessary out-of-band emission 
    limits.\178\ TRW requests that we incorporate in the rules the ongoing 
    measurement programs and the system vulnerability analyses now being 
    used to determine actual protection requirements of GNSS.\179\
    ---------------------------------------------------------------------------
    
        \175\See Constellation Comments at 49.
        \176\See LQP Reply at 60-61. On LQP's behalf Sat-Tech Systems 
    conducted an independent study of GNSS satellite availability. Sat-
    Tech Systems concluded that since multiple measurements from a 
    number of GPS and GLONASS satellites would always be available, the 
    loss of a single GNSS signal would not impair the ability to 
    navigate using GNSS. LQP Comments, Technical Appendix at para. 
    2.2.1.
        \177\Motorola Reply at 51.
        \178\These include the effects of duty cycle, modulation 
    technique, spectral overlap, channel assignment, airframe shielding, 
    time duration of event, and signal processing. Motorola describes in 
    detail the individual impact of each of these factors on the 
    analyses in its reply technical appendix at 1-10.
        \179\See TRW Reply at 77 (n 118).
    ---------------------------------------------------------------------------
    
        137. We will not adopt out-of-band emission limits to protect 
    GLONASS operations below 1610 MHz at this time. The Committee did not 
    agree on limits and the record indicates that a suitable methodology 
    for determining such limits has still not been agreed upon. We note, 
    however, that RTCA Working Group SC159 ad hoc has been established to 
    assess interference to GNSS and possible interference mitigation 
    techniques. The aviation community and the Big LEO applicants 
    participate in this group. We expect that the report from SC159 ad hoc 
    will include an assessment of the out-of-band emission limits on MSS 
    operations necessary to protect GLONASS operations below 1610 MHz. We 
    also believe that this information will provide a mutually acceptable 
    out-of-band emission level.
        c. Out-of-band interference to ARNS/RNSS from secondary MSS 
    downlinks in the 1613.8-1626.5 MHz band. 138. The Committee also 
    examined the potential for harmful interference to GPS and GLONASS from 
    secondary MSS downlinks in the 1613.8-1626.5 MHz band. It concluded 
    that interference to GPS operations near 1575 MHz from these downlinks 
    would be negligible due to the low power density level of MSS satellite 
    signals at the Earth's surface and the large frequency separation 
    between the MSS and the GPS frequency bands.\180\ To protect GLONASS 
    from interference, however, the Committee recommended that space 
    stations that use the 1613.8-1626.5 MHz band for downlinks not exceed a 
    pfd of -141.5 dbW/m\2\/4kHz.\181\ We proposed this limit in the Notice 
    in rule Sec. 25.213(c)(3).
    ---------------------------------------------------------------------------
    
        \180\Committee Report, note 23, supra, at para. 3.3.8.
        \181\Committee Report, note 23, supra, at para. 5.2.2.6.
    ---------------------------------------------------------------------------
    
        139. Motorola requests that we limit proposed Sec. 25.213(c)(3) to 
    apply only to those frequencies that are used by systems operating in 
    accordance with International Radio Regulation RR 732. Motorola 
    contends that this would ``follow any changes in the frequency plan of 
    systems, like GLONASS, operating in accordance with RR 732, and would 
    also avoid restricting the operations of MSS systems in frequencies 
    where there are no aeronautical radionavigation systems and hence no 
    need for a more restrictive power flux density limit.''\182\ Motorola 
    also asks us to clarify that the pfd limit refers to the pfd level at 
    the Earth's surface.
    ---------------------------------------------------------------------------
    
        \182\See Motorola Comments at 56.
    ---------------------------------------------------------------------------
    
        140. We believe that the pfd limits proposed in Sec. 25.213(c)(3) 
    can be readily achieved by MSS operators using the 1613.8-1626.5 MHz 
    band for secondary downlink transmissions. We also believe that our 
    intra-service sharing plan provides sufficient separation between the 
    MSS downlink band and GLONASS operations below 1610 MHz so as not to 
    create interference. Nevertheless, we have decided not to adopt the 
    proposed rule containing out-of-band emission limits for secondary MSS 
    downlinks. Adopting such a rule could be construed to imply that the 
    secondary service has some protection rights relative to primary 
    services in the band, which, by definition, it does not.\183\
    ---------------------------------------------------------------------------
    
        \183\See note 21, supra.
    ---------------------------------------------------------------------------
    
        141. We remind MSS operators that plan to use the 1613.8-1626.5 MHz 
    secondary allocation for MSS space-to-Earth operations that downlink 
    MSS operations shall not cause harmful interference to GLONASS 
    operations in the 1598-1610 MHz band.\184\ Further, MSS operators may 
    not claim interference protection from out-of-band GLONASS operations. 
    We also remind MSS operators of the obligation to coordinate secondary 
    downlink operations in the 1613.8-1626.5 MHz band pursuant to RR 
    731F.\185\
    ---------------------------------------------------------------------------
    
        \184\See note 21, supra.
        \185\See Sec. 2.106 of the Commission's Rules.
    ---------------------------------------------------------------------------
    
    3. Industrial, Scientific, and Medical Emissions at 2400-2500 MHz
        142. The 2400-2500 MHz band may be used on a co-primary basis for 
    Industrial, Scientific and Medical (ISM) equipment applications. ISM 
    applications include microwave ovens, door openers, high frequency 
    lighting systems, industrial equipment, and other low power devices. 
    The Committee was unable to reach a consensus as to whether ISM use 
    represents a significant interference problem to MSS downlinks at 
    2483.5-2500 MHz.\186\ In the Notice, we stated that the record in this 
    area was insufficient to propose specific MSS/ISM sharing rules and 
    requested additional comment on this subject.\187\
    ---------------------------------------------------------------------------
    
        \186\Committee Report, note 23, supra, at 3.4.9.
        \187\Notice, note 2, supra at para. 67.
    ---------------------------------------------------------------------------
    
        143. In their comments, LQP and TRW indicate they conducted 
    independent analyses of the potential for ISM operations to cause 
    harmful interference to 2.4 GHz MSS downlinks. LQP concluded that MSS 
    user transceivers operated in an urban environment with full signal 
    quality in 98% of the instances it recorded. Further, it concluded that 
    MSS signals would be usable 99.5% of the time. LQP also noted that 
    because urban areas are usually served by terrestrial cellular 
    networks, a dual mode transceiver could be switched to terrestrial 
    cellular frequencies when very high ISM interference is present.\188\ 
    TRW states that its study generally corroborates LQP's conclusion that 
    2.4 GHz MSS operations should not be adversely affected by ISM 
    transmissions.\189\
    ---------------------------------------------------------------------------
    
        \188\LQP Comments, Technical Appendix at 32.
        \189\TRW Reply Comments at 86. In earlier comments, TRW 
    suggested that the Commission reassess the permissible levels of 
    unwanted ISM emissions in order to maximize sharing possibilities.
    ---------------------------------------------------------------------------
    
        144. Consequently, we do not believe any further inquiry into the 
    MSS/ISM sharing situation is warranted. Should sharing be more 
    difficult than anticipated, affected parties may request that we 
    revisit this matter.
    4. Sharing with Fixed Services in the 2483.5-2500 MHz Band
        145. Over 700 fixed terrestrial stations, including temporary fixed 
    (transportable) stations, are licensed and operating in the United 
    States in the 2483.5-2500 MHz band. These stations are primarily used 
    as links in microwave relay systems serving petroleum companies and as 
    broadcast auxiliary links. Since 1985, however, the Commission has 
    prohibited any further terrestrial licensing in this band.\190\
    ---------------------------------------------------------------------------
    
        \190\Report and Order, Gen. Docket 84-689, FCC 85-388 (released 
    Sept. 13, 1985) (RDSS Allocation Order).
    ---------------------------------------------------------------------------
    
        146. The Committee recognized that MSS spacecraft operating at 
    power flux density (pfd) levels in excess of the levels prescribed by 
    international radio regulation RR 2566 would be required to be 
    coordinated with these ``grandfathered'' fixed terrestrial 
    stations.\191\ It stated, however, that these cases should be 
    infrequent and that, in any event, any interference problems should be 
    resolvable through coordination. The Committee also noted that 
    terrestrial operations could interfere with MSS operations, although no 
    analyses were provided to quantify the sharing constraints needed to 
    prevent such interference. The Committee stated that because there is 
    no inherent reason why fixed services need to continue operating in 
    this frequency band, the Commission should consider moving these fixed 
    stations to a higher frequency band.
    ---------------------------------------------------------------------------
    
        \191\RR 2566 specifies pfd values at the Earth's surface that 
    may be produced by space station emissions. The values vary from 
    -152 to -142 dB (W/m2/4 kHz) depending upon the angle of 
    arrival. International radio regulation RR 753F incorporates these 
    limits. According to RR 753F, if the limits of RR 2566 are exceeded 
    by the MSS, coordination with terrestrial services is required.
    ---------------------------------------------------------------------------
    
        147. In the Notice, we accepted the Committee's finding that 
    interference problems between terrestrial fixed-services at 2483.5-2500 
    MHz and MSS downlinks operating in excess of the prescribed pfd levels 
    may be settled through the coordination process.\192\ We requested 
    comment on this assessment. We also specifically requested comment from 
    terrestrial operators, who did not participate in the Negotiated 
    Rulemaking.
    ---------------------------------------------------------------------------
    
        \192\Notice, note 2, supra, at para. 62.
    ---------------------------------------------------------------------------
    
        148. In the RDSS Allocation Order, we recognized that fixed and 
    temporary-fixed operations are unlikely to pose a serious interference 
    threat to RDSS.\193\ We therefore grandfathered all existing station 
    licenses as of July 25, 1985, permitting them to continue operations 
    and subject only to license renewal. However, we acknowledged that 
    coordination would be somewhat more difficult when temporary-fixed 
    stations are involved since RDSS licensees would not have exact 
    information regarding the location of these stations. Therefore, we 
    required temporary-fixed licensees in this band to notify RDSS 
    licensees directly whenever the station is moved to a new 
    location.\194\ A similar interference environment is present with MSS 
    operations. Consequently, we proposed to modify Section 94.61(b)(4) to 
    extend the notification requirement for grandfathered temporary-fixed 
    licensees to MSS licensees as well.\195\
    ---------------------------------------------------------------------------
    
        \193\See RDSS Allocation Order, note 190, supra, at paras. 18-
    20.
        \194\See 47 CFR 94.61(b)(4).
        \195\Notice, note 2, supra, at para. 62 (n. 104). See also 
    Allocation Order, note 1, supra (modifying NG 147 to the Table of 
    Frequency Allocations, 47 CFR Sec. 2.106, to recognize that 
    ``grandfathered'' terrestrial stations may continue to operate on a 
    primary basis with the MSS.)
    ---------------------------------------------------------------------------
    
        149. The Big LEO parties argue that the Commission should adopt pfd 
    limits for MSS transmissions that are less stringent than those of RR 
    2566 and that these limits should be implemented as ``triggers'' for 
    coordination, not as ``absolute limits.''\196\ This would work in the 
    following manner: the relaxed pfd limit would be established as a 
    ``trigger level.'' If the trigger level is not exceeded, no further 
    action would be required. If the trigger level is exceeded, the 
    interference level to terrestrial systems would then be examined, 
    taking into account the individual system characteristics of the MSS 
    system. Only if the protection levels of the second step are exceeded 
    would coordination be required.\197\ According to the Big LEO parties, 
    relaxing the pfd levels and applying the coordination trigger method 
    would enable the MSS systems to enhance capacity and sharing with other 
    MSS operators and avoid time-consuming and costly coordination.\198\
    ---------------------------------------------------------------------------
    
        \196\LQP Comments at 75, Ellipsat Reply Comments at 24, TRW 
    Reply Comments at 78.
        \197\LQP Comments at 77, TRW Comments at 131.
        \198\We note also that LQP has, in a separate proceeding, 
    recommended that these limits be raised. LQP Comments at 74; see 
    Petition for Clarification and Partial Reconsideration of Loral 
    Qualcomm Satellite Service, Inc., ET Docket No. 92-28 at 7-10 (filed 
    Mar. 30, 1994).
    ---------------------------------------------------------------------------
    
        150. We adopt the pfd threshold of RR 2566 for our domestic Big LEO 
    systems. The ITU Radiocommunication Study Group, Task Group 2/2 (TG 2/
    2), is studying the issue of relaxing the pfd limits of RR 2566, with 
    the view to present a recommendation at an upcoming World 
    Radiocommunciation Conference (WRC). The Commission participates 
    actively in the work of TG 2/2. We do not believe it would be 
    appropriate to adopt an increase in the allowable pfd limits for MSS 
    downlinks in the 2483.5-2500 MHz band in the United States before 
    limits are agreed upon internationally. Indeed, even if we adopted a 
    relaxation of the RR 2566 pfd limits in the United States, it is 
    questionable whether MSS systems that are not designed for power 
    controlled downlink transmissions would be able to take advantage of 
    this relaxed limit worldwide.
        151. We also adopt the notification requirement for grandfathered 
    temporary-fixed licensees to MSS licensees as proposed in the Notice 
    and will not require these stations to relocate. No comments were filed 
    with respect to a possible relocation of grandfathered terrestrial 
    stations. We therefore have no record in this proceeding on which to 
    base a finding that a move would serve the public interest.
    5. Fixed Services above 2500 MHz (ITFS/MMDS)
        152. The instructional television fixed service (ITFS) and the 
    multi-channel multipoint distribution service (MMDS) operate in the 
    adjacent 2500-2690 MHz frequency band. The Committee found a potential 
    for out-of-band emission interference into MSS downlinks at 2483.5-2500 
    MHz from operations in the lowest frequency portion of the ITFS/MMDS 
    allocation. It indicated that because both ITFS and MMDS transmissions 
    are similar to those of television broadcast signals, they will cause 
    harmful interference into MSS mobile user transceivers operating up to 
    several kilometers away from an ITFS or a MMDS transmitter. The 
    Committee concluded that stricter limits on ITFS and MMDS out-of-band 
    emissions should be imposed, and recommended that the Commission 
    initiate such a rulemaking.\199\ It acknowledged, however, that making 
    these improvements would cost up to $30,000 per ITFS or MMDS station, 
    and that this cost might increase if these stations are converted from 
    analog to digital technology.
    ---------------------------------------------------------------------------
    
        \199\Specifically, the Committee concluded that out-of-band 
    emissions from the lowest frequency ITFS/MMDS channel using an 
    analog video signal at 2500-2506 MHz should be limited to -90 dB 
    relative to the carrier at a frequency offset from band edge between 
    1.25 and 2 MHz, assuming that the channel is operating at 30 dBW 
    e.i.r.p. Adjustments could be made for higher frequency channels and 
    for higher or lower operating e.i.r.p. Currently, ITFS out-of-band 
    emissions extending more than 1 MHz below the lower band edge must 
    be attenuated 60 dB below the peak visual carrier power. See 47 CFR 
    Sec. 74.936(b).
    ---------------------------------------------------------------------------
    
        153. We stated in the Notice that the record was insufficient to 
    allow us to make a specific proposal in this area.\200\ No ITFS 
    representative participated on the Committee nor did the Committee 
    explore the economic and technical tradeoffs that must be considered in 
    developing a solution. Therefore, we requested comment on all aspects 
    of the ITFS/MSS sharing issue, noting that the regulations we 
    ultimately adopt would be based on these comments. We noted that these 
    regulations might require ITFS operators to improve out-of-band 
    suppression, might require MSS operators to accept additional 
    interference, or might require a combination of both.
    ---------------------------------------------------------------------------
    
        \200\Notice, note 2, supra, at para. 64.
    ---------------------------------------------------------------------------
    
        154. Ellipsat and TRW contend that new out-of-band emission 
    constraints on all ITFS/MMDS stations should be applied immediately to 
    allow for a transition period for these transmitters to conform to new 
    requirements and that, according to Section 74.936 of the Commission's 
    Rules, the ``onus is on the ITFS operator to provide the required 
    interference protection to adjacent band services.''\201\ Further, TRW 
    asserts the licensing of Big LEO systems or the initiation of service 
    should not be delayed to permit ITFS operators additional time to 
    modify their transmitters.
    ---------------------------------------------------------------------------
    
        \201\TRW Comments at 132, Ellipsat Reply Comments at 24. Section 
    74.936 of the Commission's rules, which pertains to ITFS facilities, 
    states that ``should interference occur as a result of emissions 
    outside the assigned channel, additional attenuation may be 
    required.'' 47 CFR 74.936.
    ---------------------------------------------------------------------------
    
        155. The Wireless Cable Association International (WCAI), the 
    National Telephone Cooperative Association (NTCA) and the Corporation 
    for Public Broadcasting (CPB), urge that the Commission adopt rules 
    that will provide adequate compensation to ITFS/MMDS operators for 
    costs associated with improving their transmitters to comply with any 
    stricter out-of-band emission requirements.\202\ WCAI also notes that 
    broadband repeaters used by some ITFS and wireless cable system 
    operators to relay signals into areas that would otherwise be 
    unreachable could pose a threat to MSS downlink operations at the upper 
    portion of the 2483.5-2500 MHz band.\203\
    ---------------------------------------------------------------------------
    
        \202\WCAI Comments at 3 and 6, NTCA Comments at 2-3, and CPB 
    Comments at 6.
        \203\WCAI Comments at 4.
    ---------------------------------------------------------------------------
    
        156. LQP, in contrast, does not believe that interference is a 
    significant problem. It conducted a study to assess the impact of ITFS/
    MMDS out-of-band interference to MSS downlinks in the 2483.5-2500 MHz 
    band and concluded that no harmful interference to MSS operations will 
    result from ITFS/MMDS, including operations of ITFS/MMDS booster 
    stations, and that stricter standards on ITFS/MMDS out-of-band 
    emissions are not necessary. LQP maintains that: (1) MSS downlink 
    operations below 2488.75 MHz will not experience interference from ITFS 
    stations, (2) in urban areas, where ITFS transmitters are prevalent, 
    MSS dual mode transceivers can be used to switch customers to existing 
    terrestrial cellular radio facilities, and (3) MSS user transceivers 
    operating in the highest channel frequency in the 2483.5-2500 MHz band 
    within an ITFS coverage area will be able to operate satisfactorily in 
    all but a few extreme situations by rejecting the ITFS visual carrier 
    and other out-of-band emissions.\204\
    ---------------------------------------------------------------------------
    
        \204\LQP Comments, Technical Appendix, at 27.
    ---------------------------------------------------------------------------
    
        157. TRW urges that the LQP study ``may have taken an overly 
    optimistic view of the interference situation.''\205\ TRW also contends 
    that MSS systems using wider CDMA channels (e.g., 5 MHz or wider) may 
    not have the flexibility to move to a lower frequency channel and that 
    until further required measurements are taken and MSS system designs 
    are finalized, the impact of ITFS/MMDS out-of-band interference is not 
    certain.\206\
    ---------------------------------------------------------------------------
    
        \205\TRW Reply Comments at 79.
        \206\TRW Technical Appendix to Reply Comments at A-24.
    ---------------------------------------------------------------------------
    
        158. Upon review of the technical information in the record, we see 
    no significant threat of harmful out-of-band emission interference into 
    MSS from ITFS/MMDS operations above 2500 MHz. Well designed CDMA 
    receivers should mitigate the effect of out-of-band emissions from 
    ITFS/MMDS. Additionally, a MSS user transceiver's dynamic channel 
    switching capability should reduce any adverse affects from ITFS/MMDS. 
    Further, our intra-service sharing plan allows enough 2.4 GHz band 
    spectrum for MSS operators to avoid ITFS/MMDS out-of-band emissions in 
    the upper portions of the allocation. Consequently, we will not 
    initiate a proceeding to restrict further the out-of-band emissions on 
    ITFS/MMDS at this time.
    6. Other Terrestrial Services provided outside of the United States
        159. In sixteen countries throughout the world, the 1550-1645.5 MHz 
    band is allocated on a primary basis to the fixed service pursuant to 
    international Radio Regulation RR 730.\207\ Ground-based aeronautical 
    radionavigation services (ARNS) are also operating throughout the world 
    in the 1610-1626.5 MHz band pursuant to RR 732.
    ---------------------------------------------------------------------------
    
        \207\These countries are Austria, Bulgaria, Cameroon, Germany, 
    Guinea, Hungary, Indonesia, Libya, Mali, Mongolia, Nigeria, Poland, 
    Romania, Senegal, Czechoslovakia, and the former U.S.S.R.
    ---------------------------------------------------------------------------
    
        160. The Committee concluded that existing fixed stations operating 
    in the 1610-1626.5 MHz band pursuant to RR 730 and ground-based ARNS 
    stations operating pursuant to RR 732 will not cause harmful 
    interference to MSS operations. It also concluded that MSS operations 
    will not cause harmful interference to these terrestrial services. 
    Consequently, we proposed only to reiterate in Section 25.213(d) of our 
    rules the general obligation that MSS stations shall not cause 
    interference into stations operating under RR 730. The requirement that 
    MSS stations shall not cause interference to, or claim protection from, 
    stations operating pursuant to RR 732, (international Radio Regulation 
    RR 732 encompasses both ground-based and satellite-borne ARNS), was 
    addressed by proposed rule section 25.213(c)(1), which was adopted 
    earlier in this order.\208\
    ---------------------------------------------------------------------------
    
        \208\See para. 128, supra.
    ---------------------------------------------------------------------------
    
        161. Constellation contends that we should not adopt proposed 
    Sec. 25.213(d) since there are no U.S. systems operating pursuant to RR 
    730.\209\ We disagree. We have repeatedly emphasized in this proceeding 
    that the operation of LEO MSS systems is inherently global. Though 
    there are no systems operating in the United States pursuant to RR 730, 
    it is important that we make clear the obligations of Big LEO operators 
    to coordinate their systems worldwide. Our rules do not elsewhere 
    address coordination of Big LEO systems with systems operating pursuant 
    to RR 730.
    ---------------------------------------------------------------------------
    
        \209\Constellation Reply comments at 47 and Constellation 
    Comments at 53.
    ---------------------------------------------------------------------------
    
        162. We therefore adopt Section 25.213(d), as proposed, with the 
    caveat that the coordination and notification procedures fall under 
    Resolution 46 (WARC-92).\210\ International Radio Regulations RR 731E 
    and RR 731F require, respectively, that MSS uplink transmissions in the 
    1610-1626.5 MHz band and MSS downlink operations in the 1613.8-1626.5 
    MHz band be coordinated and notified pursuant to Resolution 46 (WARC-
    92). Also according to RR 731E, MSS mobile earth terminals may not 
    cause interference to terrestrial stations operating in accordance with 
    RR 730 and they may not claim interference protection from these 
    terrestrial stations. We note that all transmitting MSS subscriber 
    terminals will be subject to the regulatory requirements of those 
    countries in which they are operating. User countries will be 
    responsible for undertaking all necessary coordination with neighboring 
    countries to protect fixed or terrestrial aeronautical radionavigation 
    operations from MSS mobile earth terminals in those neighboring 
    countries. Any secondary MSS downlink operations in the 1613.8-1626.5 
    MHz band also may not cause harmful interference into terrestrial 
    services operating pursuant to RR 730 or 732. Nor may a MSS mobile 
    earth terminal which receives secondary downlink transmissions claim 
    protection against harmful interference from these terrestrial 
    operation unless a particular country has agreed to provide this 
    protection.
    ---------------------------------------------------------------------------
    
        \210\See Motorola Comments at 56.
    ---------------------------------------------------------------------------
    
    C. Feeder Links
    
        163. In addition to the mobile links connecting customers with the 
    MSS system, one or more ``gateway'' or central earth stations are 
    needed to complete the transmission paths, process the information 
    being transmitted, and interconnect the system with other 
    communications networks or with other user transceivers. Without these 
    ``feeder links,'' an MSS system would be useless. Because feeder links 
    operate with gateway stations at fixed locations, the feeder link 
    operates in frequency bands allocated to the fixed-satellite service 
    (FSS).
        164. The six applicants requested a variety of feeder link 
    frequency bands and bandwidths. In their applications, Constellation, 
    Ellipsat, and LQP each requested 66 MHz of spectrum in each 
    transmission direction in the 5/6 GHz C-band. Motorola and TRW and each 
    requested approximately 100 MHz in each direction the 20/30 GHz Ka-
    band. AMSC requested an unspecified amount of spectrum in the 12/14 GHz 
    Ku-band.\211\ We note, however, that four of the applicants, in the 
    Joint Proposal, indicate that their feeder link spectrum requirements 
    have increased significantly since they filed their original 
    applications. As recognized in the Notice, the FAA has opposed use of 
    the 5 GHz portion of the C-band for space-to-Earth feeder links because 
    of the interference potential between the feeder links and a navigation 
    system it is considering developing in this band.\212\ The 27.5-29.5 
    GHz portion of the Ka-band was the subject of a recently completed 
    Negotiated Rulemaking involving various terrestrial and satellite 
    interests seeking to use the band. The Negotiated Rulemaking Committee 
    was unable to devise sharing criteria that would satisfy the feeder 
    link requirements of more than one Big LEO applicant.
    ---------------------------------------------------------------------------
    
        \211\Committee Report, Annex 3, Report of Working Group 3, at 2.
        \212\See Notice, note 2, supra, at para. 75
    ---------------------------------------------------------------------------
    
        165. In the Joint Proposal, the parties nevertheless request the 
    Commission to proceed with licensing. They state that licenses can be 
    issued to those applicants requesting to operate in feeder link bands 
    that are available for assignment at the time of licensing. They 
    suggest that conditional licenses be awarded to applicants requesting 
    to operate in feeder link bands that are not available. According to 
    the parties, the license would contain a range of feeder link 
    frequencies that the licensee will be able to use provided that those 
    frequencies become available for Big LEO feeder links and are assigned 
    to that licensee by the Commission.
        166. We agree that we should award Big LEO licenses as quickly as 
    possible. While we are optimistic that sufficient spectrum will be 
    identified to support Big LEO feeder link operations, we are not 
    certain when this will occur. It is very likely that we will not be in 
    a position to assign specific feeder link spectrum to any qualified 
    applicant by our target date for licensing in January 1995. Even if we 
    were able to assign specific feeder link spectrum to some, however, we 
    would not issue unconditional grants to some and conditional grants to 
    others as the applicants suggest. Until we are certain that the feeder 
    link requirements of all qualified applicants will be met, we will not 
    foreclose our options by assigning spectrum unconditionally.\213\ We 
    will permit applicants to notify us whether they would prefer to have 
    conditional feeder link frequencies included in their authorizations or 
    whether they would prefer their initial license to be silent on this 
    issue. We envision granting unconditional licenses, including specific 
    feeder link frequencies, at the earlier of two events: (1) Domestic 
    allocations sufficient to support all Big LEO systems are available, 
    regardless of frequency band or (2) the completion of the upcoming 
    World Radio Conference in the Fall of 1995 (WRC-95) assuming sufficient 
    spectrum is made available to satisfy these feeder link requirements. 
    If sufficient feeder link spectrum to support all licensed Big LEO 
    systems is not identified by the completion of the WRC, we will need to 
    develop a further processing mechanism to assign feeder link bands to 
    Big LEO licensees. In the interim, we will continue our international 
    efforts to identity feeder link spectrum at or below 15 GHz.
    ---------------------------------------------------------------------------
    
        \213\We will, however, take action on requests for waiver of the 
    construction permit requirement under Section 319(d) of the 
    Communications Act, 47 U.S.C. 319(d). If an applicant's waiver 
    request were approved, it would permit the applicant to commence 
    construction of its system, including the feeder links, at the 
    applicant's own risk.
    ---------------------------------------------------------------------------
    
        167. To this end, in preparation for the WRC, ITU-
    Radiocommunications Study Group Task Groups 8/3 and 4/5 are attempting 
    to define spectrum requirements, to identify available frequencies and 
    to evaluate sharing possibilities with existing and future users of the 
    band. When these Groups complete their work in December of this year, 
    both will prepare Reports to the Conference Preparatory Meeting (CPM)-
    95. These Reports will form the basis for the CPM's Report to WRC-95 on 
    feeder links, which will be the technical basis for international 
    decisions regarding feeder links and the International Table of 
    Allocations.
        168. Since the frequencies to be used for LEO feeder links may also 
    be used by GSO satellites, Task Group 4/5 is studying the sharing 
    potential between LEO and GSO satellites in all FSS allocations between 
    3 and 31 GHz. These studies have indicated that certain FSS frequency 
    bands are used more extensively by GSO FSS systems and other radio 
    services and that these bands are therefore less likely candidates for 
    LEO MSS feeder links due to sharing difficulties. In bands at or below 
    15 GHz, the 5000-5250 GHz and 15.4-15.7 GHz frequencies appear to be 
    promising candidates for reallocation for LEO feeder links.\214\ Task 
    Group 4/5 has also studied the interference created by antenna beam 
    coupling between GSO earth stations and LEO satellite stations,\215\ 
    and is exploring ways to reduce interference through a variety of 
    coordination procedures, including geographic exclusion zones, reverse 
    band operation, and dedicated frequency allocations for LEO satellite 
    feeder link use. When these studies are completed, we will have an 
    indication as to which bands may be recommended and, hopefully, made 
    available internationally for MSS feeder links at WRC-95.
    ---------------------------------------------------------------------------
    
        \214\Task Group 4/5 forwarded a preliminary study to TG 8/3 that 
    identified the 5000-5250 GHz and 15.4-15.7 GHz bands as strong 
    candidates for Non-GSO Earth-to-space feeder links. The study 
    indicated that TG 4/5 was of the preliminary view that sharing of 
    non-GSO feeder links (both downlinks and uplinks) with Aeronautical 
    Radionavigation Services (ARNS) in these bands appeared feasible, 
    since the interference to microwave landing system (MLS) receivers 
    would be within the assumed permissible levels. ICAO, at Task Group 
    8/3, objected to this study, but further analysis is underway and 
    the bands are still being considered as possibilities within these 
    international forums.
        \215\Antenna beam coupling occurs when a LEO satellite passes 
    below a GSO satellite and crosses into the transmission path of an 
    earth station to the GSO satellite. At that point, the transmission 
    beams from the LEO satellite and the earth station will intersect. 
    If the LEO and GSO systems are operating in the same frequency band, 
    this ``coupling'' will produce significant interference for very 
    short durations of time when the earth station, LEO and GSO 
    satellites form a straight line.
    ---------------------------------------------------------------------------
    
        169. Nevertheless, as we stated in the Notice, we will not allow 
    the uncertain availability of bands below 15 GHz to delay the licensing 
    and implementation of Big LEO systems. Consequently, if sufficient 
    spectrum is made available at 20/30 GHz to accommodate all Big LEO 
    licensees before bands below 15 GHz are identified, we will authorize 
    all licensees in the 20/30 GHz band, recognizing that several 
    applicants will be faced with substantial system design and service 
    concept modifications. We will continue, however, to pursue bands at 
    and below 15 GHz for Big LEO feeder links, and will allow licensees to 
    modify their licenses to request operational authority in any new bands 
    if, and when, they become available.
    
    D. Intersatellite Links
    
        170. Motorola's proposed system includes intersatellite 
    transmission links in the 23.18-23.38 GHz band. This proposal falls 
    within the intersatellite service allocation at 22.55-23.55 GHz. The 
    Committee concluded that Motorola's use of this band would be 
    compatible with other operations in the band, which include operations 
    by NASA, the radio astronomy service, and fixed-terrestrial services. 
    The Committee noted, however, that NASA has indicated it would prefer 
    that any future MSS intersatellite links operate in the 24.45-24.75 GHz 
    band, which recently was allocated internationally and domestically for 
    intersatellite links. Nevertheless, the Committee, which included a 
    representative of NASA, proposed that we adopt a rule indicating that 
    the 22.55-23.00 GHz, 23.00-23.55 GHz, 24.45-24.65 GHz, and 24.65-24.75 
    GHz frequencies are available for use by the intersatellite service. In 
    the Notice, we proposed to adopt the Committee's recommended rule 
    regarding intersatellite service frequencies, coordination with 
    government agencies, and sharing criteria. We adopt the rule as 
    proposed with several minor changes and clarifications suggested by 
    Motorola.
    
    E. Service Rules
    
    1. Regulatory Treatment
        171. In the Notice, we asked parties to comment on our tentative 
    conclusion that Big LEO MSS service may be offered as a commercial 
    mobile radio service (CMRS). We further sought comment on whether we 
    should exercise our discretion under Section 332(c)(5)\216\ to 
    determine that Big LEO space station licensees making satellite 
    capacity available to CMRS providers shall be required to operate as 
    common carriers. In the alternative, we asked parties to comment on how 
    we should regulate Big LEO space station operators if they are not 
    offering CMRS. We noted that when making determinations regarding 
    common carriage obligations in the past, the Commission has examined 
    individual service proposals in light of the criteria delineated in 
    National Association of Regulatory Utility Commissioners v. FCC, 525 
    F.2d 630, 642 (D.C.Cir.), cert. denied, 425 U.S. 999 (1976) (NARUC 
    I).\217\ Referencing the two-pronged test in NARUC I, in the Notice, we 
    requested comment regarding (1) the likelihood that space station 
    capacity in this service will be offered indifferently to the public, 
    and (2) if there is no such likelihood, whether there should be a legal 
    compulsion for space segment providers to serve the public 
    indifferently.\218\ We also asked for comment on the impact of 
    requiring common carrier operation on the amount of foreign investment 
    and the international coordination of these satellites, given the 
    requirements of Section 310(b) of the Act.\219\
    ---------------------------------------------------------------------------
    
        \216\Section 332(c)(5) reads as follows: ``SPACE SEGMENT 
    CAPACITY. Nothing in this section shall prohibit the Commission from 
    continuing to determine whether the provision of space segment 
    capacity by satellite systems to providers of commercial mobile 
    services shall be treated as common carriage.'' 47 U.S.C. 332(c)(5).
        \217\Notice, note 2, supra, at para. 80.
        \218\Id. at paras. 80-81.
        \219\Id. at para. 81.
    ---------------------------------------------------------------------------
    
        172. In a recent rulemaking, we determined the classification and 
    regulatory treatment of providers of CMRS.\220\ Regarding satellite 
    services, we held that, to the extent that a space station licensee 
    provides a service that meets the elements of the CMRS definition,\221\ 
    we will generally regulate the provision of that service on a common 
    carrier basis.\222\ We concluded, however, that so long as the service 
    provider is not providing service directly to end users, the Commission 
    retains the authority under section 332(c)(5) to continue to employ its 
    existing procedures to determine whether the provision of space segment 
    capacity by satellite licensees to CMRS providers will be offered on a 
    common carrier or private carrier basis.\223\ We also determined that 
    the Commission has the discretion to extend this treatment to any 
    entity that sells or leases space segment capacity, to the extent that 
    the entity is not providing CMRS directly to end users.\224\
    ---------------------------------------------------------------------------
    
        \220\Implementation of Sections 3(n) and 332 of the 
    Communications Act, 9 FCC Rcd 1411 (1994) (CMRS Second Report and 
    Order), recon. pending.
        \221\Id. at 1457-58. A commercial mobile radio service is 
    defined as ``any mobile service (as defined in section 3(n)) that is 
    provided for profit and makes interconnected service available (A) 
    to the public or (B) to such classes of eligible users as to be 
    effectively available to a substantial portion of the public, as 
    specified by regulation by the Commission.'' 47 U.S.C. 332(d)(1). A 
    private mobile radio service is defined as ``any mobile service (as 
    defined in section 3(n)) that is not a commercial mobile service or 
    the functional equivalent of a commercial mobile service, as 
    specified by regulation by the Commission.'' 47 U.S.C. 332(d)(3).
        \222\It should be noted, however, that we have chosen to forbear 
    (pursuant to Section 332(c)(1)(A)) from the application of certain 
    provisions of Title II of the Act with regard to CMRS providers. As 
    such, for example, CMRS providers are not permitted to file tariffs 
    for their services. See CMRS Second Report and Order, note 220, 
    supra, at 1478-80.
        \223\Id. at 1457-58.
        \224\Id. at 1457.
    ---------------------------------------------------------------------------
    
        173. Motorola and LQP agree that the Commission must regulate Big 
    LEO space station licensees as common carriers to the extent that they 
    provide CMRS to end users.\225\ If the licensees offer only space 
    segment capacity to resellers, however, the parties contend that this 
    provision of service does not fall within the definition of CMRS, and 
    therefore need not be made available on a common carriage basis.\226\ 
    LQP argues that in this situation, the public is assured common 
    carriage access to the service because, at some point a reseller will 
    meet the definition of a CMRS provider and will be required to operate 
    as a common carrier.\227\
    ---------------------------------------------------------------------------
    
        \225\Motorola Comments at 67-68.
        \226\See e.g., TRW Comments at 153-54 & n.239; LQP Comments at 
    97-98.
        \227\LQP Comments at 97, 100.
    ---------------------------------------------------------------------------
    
        174. Big LEO space station licensees providing service directly to 
    end users must be regulated as common carriers if the service offering 
    meets the definition of CMRS. We will determine whether a service 
    offering meets the definition based on the service description 
    contained in the operator's application. Operators with pending 
    applications may amend their applications to the extent necessary to 
    enable us to make the determination regarding the nature of the 
    service.\228\
    ---------------------------------------------------------------------------
    
        \228\See para. 2, supra.
    ---------------------------------------------------------------------------
    
        175. Pursuant to section 332(c)(5), however, if space segment 
    capacity is offered by a Big LEO space station licensee to a reseller 
    or other entity who then offers CMRS to end users, we have the 
    discretion to determine whether to require the Big LEO licensee to 
    offer such service on a common carriage basis, or to permit such 
    offering to be made on a private carriage basis. In making this 
    determination, we have looked to the analysis enunciated in NARUC I.
        176. Regarding the first prong of the NARUC I test, the commenters 
    agree unanimously that nothing in the nature of the applicants' service 
    proposals supports a conclusion that their services will be offered 
    indifferently to the public. Motorola points out that it and the other 
    applicants propose to market their space segment capacity to a small 
    number of resellers, and to tailor these offerings to the individual 
    requirements of these few customers. Motorola contends that such 
    offerings have never been viewed as ``common carriage'' under the NARUC 
    I standard.\229\ Constellation, LQP, TRW, and AirTouch concur, noting 
    that Commission has historically viewed a service provider's lack of 
    intent to serve end users as an indication of non-common carriage.\230\
    ---------------------------------------------------------------------------
    
        \229\Motorola Comments at 64-65 (asserting that space capacity 
    on the IRIDIUM system will never be offered directly to the public; 
    rather, it will be provided on a wholesale basis to the operators of 
    the IRIDIUM system gateways, who in turn may provide services to end 
    users or sell capacity in bulk to service providers, or both).
        \230\Constellation Comments at 60; LQP Comments at 97-98; TRW 
    Comments at 158-160; AirTouch Comments at 9-10.
    ---------------------------------------------------------------------------
    
        177. We agree with the commenters that the record in this 
    proceeding does not support a finding that the proposed space segment 
    services are likely to be offered to the public indifferently, a basic 
    characteristic of common carrier service.\231\ First, in cases where 
    licensees have not intended to serve the user public directly, the 
    Commission has found services to be non-common carrier in nature. In 
    Domestic Fixed-Satellite Transponder Sales, for example, the Commission 
    noted the slim likelihood that non-common carrier domestic satellites 
    would hold themselves out indifferently to serve the user public as key 
    to its decision to permitted qualified persons to apply for domestic 
    satellite licenses for non-common carrier purposes.\232\ More recently, 
    the Commission, in assessing its discretion under section 332(c)(5), 
    held that non-voice, non-geostationary (NVNG) MSS space station 
    licensees would be permitted to provide system access to CMRS providers 
    on a non-common carrier basis.\233\ Second, these limited offerings 
    will be tailored to provide resellers with a wide variety of options, 
    ranging from position determination and data messaging services, such 
    as those proposed by the NVNG MSS proponents, to global telephony. 
    Consequently, there is nothing in this record to support a finding that 
    the services will be offered indifferently to the public.
    ---------------------------------------------------------------------------
    
        \231\See para. 171, supra. See also Motorola Comments at 64.
        \232\Domestic Fixed-Satellite Transponder Sales, 90 FCC 2d 1238, 
    1256-57 (1982), aff'd, Wold Communications, Inc. v. FCC, 735 F.2d 
    1456 (D.C. Cir. 1984), modified Martin Marietta Communications 
    Systems, Memorandum Opinion and Order, 60 Rad.Reg. (P&F) 2d 779 
    (1986).
        \233\NVNG MSS Order, note 48, supra, at 8456.
    ---------------------------------------------------------------------------
    
        178. Regarding the second prong of the NARUC I test, the commenters 
    unanimously agree that there should be no legal compulsion for space 
    segment provides to serve the public indifferently. AirTouch and other 
    commenters allege that there will be significant competition in the 
    provision of these services to CMRS providers, both from Big LEO 
    systems, as well as from GSO MSS and NVNG MSS systems.\234\ These 
    commenters also assert that sufficient capacity will be available to 
    assure service availability to those that wish to receive it.\235\ TRW 
    further contends that the danger of unreasonable or anticompetitive 
    practices that common carrier regulation is designed to prevent will 
    not exist in the competitive environment in which Big LEO licensees 
    will operate because five applicants seek authority to operate these 
    services.\236\
    ---------------------------------------------------------------------------
    
        \234\See, e.g., AirTouch Comments at 7-8; Ellipsat Comments at 
    46; TRW Comments at 156-157.
        \235\AirTouch Comments at 8; TRW Comments at 157; Ellipsat 
    Comments at 46.
        \236\See TRW Comments at 156. See also Motorola Comments at 63.
    ---------------------------------------------------------------------------
    
        179. We concur that there does not appear to be a need to impose 
    common carrier requirements on Big LEO licensees at this time. The 
    Commission has found the presence of capacity and the resulting 
    competition to be an important factor in determining whether non-common 
    carrier treatment should be permitted.\237\ As the commenters state, 
    competitive voice mobile services already exist or are imminent. 
    Furthermore, satellite-delivered radiolocation and messaging services 
    are currently provided by a Commission licensee,\238\ and are proposed 
    by a number of NVNG MSS applicants.\239\ Moreover, under our rules 
    adopted today, sufficient spectrum is available to support the grant of 
    up to five of the pending Big LEO applications.\240\ Thus, significant 
    direct competition is approaching.\241\ We accordingly believe that 
    sufficient competitive capacity will be available to assure the public 
    of ample access to these services. Therefore, we find that there is no 
    reason to require the provision of space segment capacity to be offered 
    to resellers on a common carrier basis.\242\ Of course, if a space 
    segment capacity provider chooses to provide service on a common 
    carrier basis, that service provider would be subject to regulation as 
    a CMRS provider.\243\ The Commission has forborne from applying certain 
    provisions of Title II to CMRS providers.\244\
    ---------------------------------------------------------------------------
    
        \237\Domestic Fixed-Satellite Transponder Sales, note 232, 
    supra, at 1250-53.
        \238\See Qualcomm, Inc., Application for Blanket Authority to 
    Construct and Operate a Network of 12/14 GHz Transmit/Receive Mobile 
    and Transportable Earth Stations and a Hub Earth Station, 4 FCC Rcd 
    1543 (1989).
        \239\Final rules have been adopted establishing the NVNG mobile-
    satellite service, and three applications are pending. See NVNG MSS 
    Order, note 48, supra.
        \240\See paras. 44-45, supra.
        \241\There is also support in antitrust law and policy for 
    examining potential competition for that purpose. See Implementation 
    of Sections 3(n) and 332 of the Communications Act, Regulatory 
    Treatment of Mobile Services, Amendment of Part 90 of the 
    Commission's Rules To Facilitate Future Development of SMR Systems 
    in the 800 MHz Frequency Band, Amendment of Parts 2 and 90 of the 
    Commission's Rules to Provide for the Use of 200 Channels Outside 
    the Designated Filing Areas in the 896-901 MHz and 935-940 MHz Band 
    Allotted to the Specialized Mobile Radio Pool, GN Docket No. 93-252, 
    PR Docket No. 93-144, PR Docket No. 89-553, FCC 94-212, at paras. 
    69-70, (released Sept. 23, 1994).
        \242\We emphasize that our decision with regard to the 
    regulatory status of the provision of space segment capacity is 
    taken pursuant to the Commission's authority under Section 
    332(c)(5). Therefore, our actions here should not be viewed as 
    altering our decision in the CMRS Second Report and Order regarding 
    individualized or customized service offerings made by CMRS 
    providers to individual customers. As we explained in the CMRS 
    Second Report and Order, individualized or customized offerings will 
    be classified and regulated as CMRS, regardless of whether such 
    offerings would be treated as common carriage under existing case 
    law, if the service falls within the definition of CMRS. See CMRS 
    Second Report and Order note 220, supra, at 1439 and n.130. We also 
    explained that the public availability prong of the CMRS definition 
    is met unless the service is used for a licensee's internal use or 
    if Commission rules limit eligibility to specified user groups. Id. 
    at 1441.
        \243\See CMRS Second Report and Order, note 220, supra, at 1475-
    90.
        \244\See 47 CFR 20.15.
    ---------------------------------------------------------------------------
    
        180. In so finding, we recognize that the commenters argued the 
    imposition of common carrier requirements may have an adverse effect on 
    the development of this service. AirTouch and others argue that Section 
    310(b) restrictions on foreign involvement in the affairs of domestic 
    common carrier licensees may significantly hinder investment by foreign 
    entities, as well as their willingness to allow a U.S. licensee to 
    operate within their own borders.\245\ The commenters allege that this 
    investment is critical to the development of a global satellite 
    service.\246\ Further, Motorola states that the submission of U.S. 
    service providers to common carrier requirements will inhibit their 
    ability to compete with foreign systems that are not similarly 
    encumbered.\247\ LQP concurs, noting that the space station licensees 
    should be free to tailor their business plans to their respective 
    customer bases.\248\
    ---------------------------------------------------------------------------
    
        \245\See AirTouch Comments at 4-7. See also TRW Comments at 161-
    163.
        \246\See Ellipsat Comments at 46; AirTouch Comments at 5-6; 
    Motorola Comments at 66-67.
        \247\Motorola Comments at 66-67.
        \248\LQP Comments at 99.
    ---------------------------------------------------------------------------
    
        181. While we have already found that common 2 carrier requirements 
    need not be imposed on space segment operators providing service to 
    resellers, there are several other factors that militate against the 
    imposition of common carrier requirements, particularly those limiting 
    alien ownership under Section 310(b) of the Communications Act. 
    Specifically, these systems are inherently global, and extremely 
    expensive. Systems may be comprised of as many as 66 satellites, only a 
    small number of which are visible over the United States at any one 
    time. Because of their global nature, many systems are raising capital 
    in international markets.\249\ As such, it is reasonable to expect that 
    investors will want to be involved with system operation, particularly 
    if the system will be accessed from the investor's jurisdiction. We 
    concur that this foreign participation is likely to improve the 
    likelihood of receiving a grant of space station access by foreign 
    administrations.
    ---------------------------------------------------------------------------
    
        \249\See, e.g., Motorola Comments at 67; TRW Comments at 161-162 
    (noting that global geostationary satellite systems, like Panamsat, 
    also have found it necessary to form partnerships with foreign 
    companies in order to raise foreign capital).
    ---------------------------------------------------------------------------
    
    2. System License and License Term
        182. As proposed in the Notice, and unanimously endorsed by the 
    parties, we will follow the policy we established in licensing NVNG MSS 
    systems, which are also composed of constellations of technically 
    identical LEO satellites. Specifically, we will issue a single 
    ``blanket'' authorization for the construction, launch, and operation 
    of all the satellites in an entity's constellation. This authorization 
    will cover all construction and launches necessary to put the complete 
    constellation into place and to maintain it until the end of the 
    license term, including any replacement satellites necessitated by 
    launch or operational failures, or by the retirement of satellites 
    prior to the end of the license period. All replacement satellites, 
    however, must be technically identical to those in service and may not 
    cause a net increase in the number of operating satellites.\250\ This 
    blanket authorization will include any in-orbit spares for which the 
    applicant seeks authorization as part of its system. Any such spares 
    can be activated as required. Within ten days of activation, the 
    licensee must certify to the Commission that the activation did not 
    cause it to exceed the total number of operation satellites for which 
    its system is authorized. Any spares or replacements that do not fall 
    under the blanket authorization will need separate authorizations to 
    build, launch and operate, but their terms will expire concurrently 
    with the blanket authorization. As proposed in the Notice, the license 
    will run from the date on which the first space station in the system 
    begins transmissions and will be valid for a ten-year period.
    ---------------------------------------------------------------------------
    
        \250\Technically identical satellites must have identical 
    satellite antenna footprints and transmission parameters. They need 
    not, however, have the identical physical structure or 
    microelectronics.
    ---------------------------------------------------------------------------
    
        183. Some applicants urge us to permit replacement satellites that 
    are ``functionally equivalent'' to those authorized or have ``the same 
    particulars of operation,'' to enable them to more readily include 
    evolutions in design into newer satellites. These are the same 
    proposals and arguments we rejected when we adopted the blanket 
    authorization standards for NVNG MSS satellites.\251\ In the absence of 
    arguments or evidence demonstrating that the NVNG MSS service is not 
    analogous to the Big LEO service, we continue to believe our interests 
    in assuring the continued compatibility of the subject systems with 
    other users of the spectrum outweigh any convenience for licensees in a 
    laxer standard. A modification application to upgrade satellite design 
    will not be unduly burdensome and should not impede technical 
    innovation.
    ---------------------------------------------------------------------------
    
        \251\See NVNG MSS Order, note 48, supra, at 8452.
    ---------------------------------------------------------------------------
    
        184. We also deny the request of LQP and Constellation that a 
    licensee be permitted to put ``spare'' satellites into service under 
    their blanket license in order to enhance their systems. These parties 
    would require only that there be no overall increase in effective 
    isotropically radiated power (e.i.r.p.), pfd, or any other sharing 
    criterion, and argue that this policy would allow licensees to increase 
    path diversity, which can be a significant service improvement for CDMA 
    systems. We are not convinced by LQP and Constellation that other 
    operators would not be affected by the operation of facilities that 
    have not been specifically analyzed and appropriately authorized. 
    Accordingly, we affirm our requirement that any satellites that an 
    applicant wishes to include in its system must be specified in its 
    initial application or a modification application.
        185. We proposed in the Notice that license terms will begin 
    automatically with the first transmission from the first authorized 
    satellite, and will continue for ten years.\252\ All parties agree with 
    the length of the license term. One party proposes that a license term 
    should commence only after commencement of actual service or within six 
    months of launch, whichever occurs first. Apparently, the concern is 
    that the license term will begin to run before a licensee has launched 
    a sufficient number of satellites with which to begin commercial 
    operations. This overlooks our general policy that, because all 
    transmissions are capable of causing interference, satellite license 
    terms in all satellite services begin when radio transmissions 
    commence. We will not treat Big LEO operators differently by permitting 
    them to engage in any transmissions, whether those transmissions are to 
    test the system's functioning or to provide a fully implemented 
    commercial service, without a valid operating license. Further, we do 
    not believe that Big LEO operators will be unduly burdened if the 
    license term for the system begins to run on the date of the first 
    transmission. If fuel is left on the satellite after its license term 
    has expired, we will entertain a request for special temporary 
    authority to continue to operate if that location has not been assigned 
    to a new system.\253\ Thus, we adopt our rule as proposed.
    ---------------------------------------------------------------------------
    
        \252\This follows the one-step processing and licensing policy 
    that has been used for satellites since 1980. See 1980 Assignment 
    Order, 84 FCC 2d 584 (1981).
        \253\In the past, we have granted such requests when continued 
    operations will not prevent a state-of-the-art satellite from taking 
    its place. See, e.g., Hughes Communications Galaxy, Inc., 9 FCC Rcd 
    217 (1994); Hughes Communications Galaxy, Inc., 9 FCC Rcd 218 
    (1994); and American Telephone and Telegraph Co., 8 FCC Rcd 8741 
    (1993).
    ---------------------------------------------------------------------------
    
        186. We also proposed a filing window for system replacement 
    applications identical to the one implemented in the analogous NVNG MSS 
    service. Specifically, we proposed that applications for the next 
    generation Big LEO systems must be filed no earlier than three months 
    prior to and no later than one month after the end of the seventh year 
    of the existing license.\254\ Motorola, LQP and Constellation variously 
    contend that some replacement applications could affect other 
    licensees' rights and thus potentially affected licensees should be 
    able to file replacement applications earlier. No party has explained, 
    however, why our proposed rules fail to provide adequate opportunity 
    for affected entities to respond to proposed replacement systems, thus 
    protecting their rights. We will therefore adopt the filing window for 
    replacement systems as proposed.
    ---------------------------------------------------------------------------
    
        \254\Proposed Sec. 25.120(e).
    ---------------------------------------------------------------------------
    
        187. In the Notice, we stated that we intend to grant replacement 
    applications if frequencies remain available for use by such systems, 
    consistent with our practice for other satellite services.\255\ Three 
    applicants urge us to adopt an explicit replacement expectancy, with 
    TRW proposing a specific provision that would provide such an 
    expectancy upon a licensee's consistent regulatory compliance. The 
    Commission, however, has historically rejected establishing an explicit 
    replacement expectancy for space station systems.\256\ We have 
    repeatedly noted circumstances such as intervening international 
    agreements or changes in technology may affect our determination as to 
    whether a replacement system would serve the public interest. We assure 
    Big LEO licensees that given the enormous investment necessary to 
    construct and operate a satellite system, we will consider replacement 
    applications in this service similar to other satellite services, that 
    is, we will grant authority to implement a next generation system 
    unless extraordinary circumstances prevent us from doing so.
    ---------------------------------------------------------------------------
    
        \255\Notice, note 2, supra, at n. 134.
        \256\See, e.g., Assignment of Orbital Locations to Space 
    Stations in the Domestic Fixed-Satellite Service, 3 FCC Rcd 6972 
    (1988 Assignment Order), at n. 31.
    ---------------------------------------------------------------------------
    
    3. Implementation Milestones
        188. As proposed in the Notice, we will adopt a set of satellite 
    construction milestones modeled on those used in the NVNG MSS service. 
    All parties agree that implementation milestones to monitor the 
    progress of system implementation are advisable, and most parties 
    approve of the essential elements of our proposed milestones, with 
    certain minor clarifications and modifications, some of which we are 
    adopting.
        189. Each licensee will be required to adhere to a strict timetable 
    for the system implementation. Failure to meet this timetable will 
    render the authorization null and void. We will generally require each 
    licensee to begin construction of its first two satellites within one 
    year of the unconditional grant of its authorization, and complete 
    construction of those first two satellites within four years of that 
    grant. Construction for the remaining authorized operating satellites 
    in the constellation must begin within three years of the initial 
    authorization, and the entire authorized system must be operational 
    within six years.\257\ While we do not intend to deviate from these 
    requirements for commencing construction, we may authorize a different 
    schedule if an applicant concretely demonstrates that its proposed 
    system's size and/or complexity warrants additional time because of the 
    size or complexity of its proposed system.\258\ In every case, the 
    licensee's individual milestone timetable will be set and become a 
    condition of its authorization. Some parties propose that we consider 
    granting extensions of time to a licensee that has launched at least 
    part of its system. We will not adopt such a provision, which would 
    suggest that we will not enforce strictly the system completion 
    requirement. Incomplete systems will not justify the reservation of the 
    orbit/spectrum resource from other potential users, and applicants 
    should not anticipate that their authorization will require anything 
    less than a complete commitment of those resources necessary to execute 
    the full global system upon which their authorization is premised.
    ---------------------------------------------------------------------------
    
        \257\Some applicants' suggestions for additional milestones are 
    based on their mistaken belief that the Notice did not include a 
    final system completion requirement.
        \258\See Notice, note 2, supra at 1136.
    ---------------------------------------------------------------------------
    
        190. We also will not impose a separate deadline for construction 
    of in-orbit spares. We will leave the determination of what is an 
    appropriate timetable for building or launching in-orbit spares to each 
    licensee. It is reasonable to believe that if the rest of the system is 
    implemented in a timely fashion, any in-orbit spares will also be put 
    into place on a timetable deemed prudent by the operator. Moreover, we 
    do not wish to discourage applicants from proposing as many in-orbit 
    spares for inclusion in their initial blanket authorizations as they 
    deem appropriate.
        191. Some of the parties ask us to forego the construction 
    commencement milestone in favor of a timetable that would focus only on 
    the initiation of commercial service. They primarily contend that our 
    milestones are unfair to those systems that could begin to provide 
    service in stages (and, presumably, finance construction of the last 
    satellites from initial revenue streams). We are concerned, however, 
    that such a timetable would prevent prompt identification and 
    elimination of those applicants that are not, for whatever reason, 
    committed to building a system expeditiously that is capable of 
    providing global service.\259\ Most applicants fully support a global 
    coverage requirement.\260\
    ---------------------------------------------------------------------------
    
        \259\Any applicant whose financial capability would be so 
    constrained by the proposed construction milestones likely will not 
    meet our financial qualifications. The milestones and the financial 
    requirements provide a balanced approach to determining the actual 
    capability of the applicants to implement the system and service 
    they propose.
        \260\See paras. 21-23, supra.
    ---------------------------------------------------------------------------
    
        192. Several applicants suggest that we adopt a more detailed 
    standard or a series of milestones to enable us to track implementation 
    progress more closely. LQP argues that this could result in long 
    undetected delays in progress. We do not believe interim milestones are 
    necessary. The annual reporting requirements (further discussed below) 
    and our ability to demand additional contract and construction 
    information should enable us to respond promptly to any implementation 
    failures.
        193. Motorola suggests that we require a specific and significant 
    portion of the ground segment to be constructed on the same timetable 
    as the space segment.\261\ Such a requirement, opposed by all other 
    applicants, is undesirable. As noted, service provision in foreign 
    countries will be subject to a particular country's authorization. We 
    cannot require a licensee to meet an implementation milestone when its 
    ability to do so is outside of its control. In any event, licensees 
    that have launched enough satellites to provide service should have no 
    difficulty constructing their corresponding earth segments.
    ---------------------------------------------------------------------------
    
        \261\Motorola would require a ground segment covering 75% of the 
    world's population and 75% of the world's land area within six years 
    of initial system authorization.
    ---------------------------------------------------------------------------
    
    4. Reporting Requirements
        194. We will also generally follow the NVNG MSS rules for annual 
    reporting requirements for this service, as proposed in the Notice and 
    supported by most parties. Every licensee must provide an annual report 
    fully describing the status of its construction, system loading and any 
    outages or malfunctions that have occurred during the reporting period. 
    These reports will be required on June 30 of each year.
        195. Although several applicants argue that the information 
    requested is either too burdensome or too proprietary in nature for 
    dissemination, we believe this information is needed to allow us to 
    evaluate whether, and to what extent, the spectrum is being used and to 
    monitor construction progress. Licensees may request confidentiality 
    for any portion of their report, pursuant to Sec. 0.459 of the 
    Commission's rules, 47 CFR 0.459. As proposed in the Notice, we will 
    also require that each licensee to certify to us within ten days of the 
    date of any milestone requirement that the milestone was met or to 
    advise us that it was not.
    5. Distress and Safety Communications
        196. Although Big LEO applicants did not indicate that they plan to 
    use their systems for extensive distress and safety communications, we 
    recognized in the Notice that because these systems have position 
    determination capability,\262\ they have the potential to complement 
    existing search and rescue (SAR) and disaster response services. 
    Further, although we recognize that Big LEO services cannot be used in 
    lieu of distress beacons, such as satellite emergency position locator 
    transmitters or emergency indicator radio beacons, that are required to 
    be carried by international agreement or statute,\263\ Big LEO system 
    operators have certain obligations relating to maritime distress 
    communications under sections 321(b) and 359 of the Communications Act, 
    47 U.S.C. 321(b), 359.\264\ Other than these mandated requirements, we 
    did not propose to require Big LEO systems to provide search and rescue 
    or disaster response communications as a general service offering. We 
    stated, however, that we expected that any satellite licensee that 
    chose to offer emergency or safety communications services will 
    coordinate its effort with the appropriate search and rescue 
    organizations.\265\ These requirements were contained in proposed rule 
    Sec. 25.143(f).
    ---------------------------------------------------------------------------
    
        \262\See para. 104, supra.
        \263\Compulsory equipment carriage requirements are established 
    in portions of the Commission's rules as well as by statute. See, 
    e.g., 47 CFR 80.801, et seq.; Ch. IV, International Convention on 
    the Safety of Life at Sea, 32 U.S.T. 47, T.I.A.S. 9700 (1974).
        \264\Specifically, Section 321 of the Communications Act, 47 
    U.S.C. Sec. 321, requires, inter alia, that all radio stations 
    including Government stations and foreign ship stations within U.S. 
    territorial waters, give absolute priority to radio communications 
    or signals relating to ships in distress. Section 359 of the 
    Communications Act, 47 U.S.C. 359, requires, inter alia, that U.S. 
    ships that encounter dangers to navigation such as, dangerous ice or 
    winds whose force is 10 or above on the Beaufort scale must transmit 
    such information to ships in the vicinity and authorities on land. 
    Section 359 also prohibits ships or mobile stations from charging 
    for transmitting messages related to dangers to navigation.
        \265\For example, the Interagency Committee on Search and Rescue 
    (ICSAR) is composed of representatives from seven Federal Agencies, 
    including the FCC, and has search and rescue responsibilities in the 
    United States. Any satellite operator offering emergency services 
    within the United States should coordinate the establishment of 
    emergency services and procedures for its use with this 
    organization. Similar procedures should be developed with all other 
    domestic and international search and rescue organizations so that 
    coordinated rescue operations can be quickly effected in the 
    geographic area of concern.
    ---------------------------------------------------------------------------
    
        197. Mr. Bernard Trudell (Trudell) states that in cases of 
    emergency all MSS providers should be required to comply with standards 
    and call routing that will ensure the safety and well being of the 
    public.\266\ Additionally, Trudell states that most MSS providers 
    indicated that they would provide distress and safety services in part 
    as justification for license authority.\267\ Trudell concludes that the 
    Commission should require MSS providers to address these issues. The 
    U.S. Coast Guard (Coast Guard) states that it will depend increasingly 
    on 9-1-1 type services and caller ID for its SAR operations and to 
    prevent hoaxes. It requests, therefore, that Big LEO systems be 
    required to provide standard location and caller ID information.\268\ 
    Several commenters expressed similar opinions stating, generally, that 
    the Commission should require that Big LEO systems be required to 
    provide standardized information that would identify the calling party, 
    give the calling party's location and route emergency messages to an 
    appropriate emergency organization.\269\ The Interagency Committee for 
    Search and Rescue\270\ (ICSAR) noted all proposed Big LEO providers had 
    stated that their systems will be available for distress and safety 
    communications and recommends that the Commission develop requirements 
    to ensure that MSS systems meet public safety needs.\271\ ICSAR also 
    recommends that these issues--standardized location, caller ID and 
    routing of emergency or distress calls--be addressed in a separate rule 
    making.\272\ The National Emergency Number Association states that the 
    Commission should adopt a rule to require that licensees of Big LEO 
    systems cooperate in the provision of National Security and Emergency 
    Preparedness (NS/EP) communications.\273\
    ---------------------------------------------------------------------------
    
        \266\Trudell Comments at 4.
        \267\Id at 2.
        \268\Coast Guard Comments at 1.
        \269\See, e.g., Comments of the National Association of EMS 
    Physicians at 1; Comments of the Texas Advisory Commission on State 
    Emergency Communications at 2, Reply Comments at 2; Reply Comments 
    of the National Institute for Urban Search and Rescue at 2 and 3; 
    and Reply Comments of the National Emergency Number Association at 
    3.
        \270\ICSAR is made up of representatives from seven Federal 
    agencies including the Federal Communications Commission. This 
    Committee has search and rescue responsibilities under the United 
    States National Search and Rescue Plan.
        \271\ICSAR Reply Comments at 2.
        \272\Id. See also Summary of Pertinent Comments attached to 
    ICSAR's Reply comments for a summary of issues.
        \273\National Communications System Comments at 2.
    ---------------------------------------------------------------------------
    
        198. LQP states that it supports the Commission's proposed rule 
    regarding distress and safety communications and in principle its 
    obligation regarding distress communications, but opposes having to 
    provide search and rescue or disaster response communications as a 
    general service offering.\274\ LQP stated that the Commission should 
    follow its decision reached in the Little LEO proceeding.\275\ Motorola 
    states that it does not object to the proposed rule and notes that 
    consistent with the Commission's decision in the Little LEO proceeding, 
    the Commission did not intend to require that Big LEO MSS licensees 
    show specific means of interconnection to route distress calls and did 
    not intend for big LEO MSS stations to be used in lieu of emergency 
    beacons required to be carried by international agreement or 
    statute.\276\ Motorola strongly opposes the imposition of a specific 
    technical model for the 9-1-1 interconnection and location information 
    delivery.\277\
    ---------------------------------------------------------------------------
    
        \274\LQP Comments at 116, Reply Comments at 94. See also 
    Comments of TRW at 193 and Constellation Reply Comments at 54.
        \275\See NVNG MSS Order, note 48, supra, at 8458.
        \276\Motorola Comments at 68.
        \277\See Motorola Reply Comments at 54-55.
    ---------------------------------------------------------------------------
    
        199. Many of the Big LEO applicants acknowledge that they may carry 
    distress and safety or disaster response communications. They argue 
    that this would be, however, no different than the capability of 
    cellular radios today or future personal communications services that 
    may be used in the event of a distress or an emergency. In the Notice, 
    we reminded licensees of their obligations under the Communications Act 
    regarding distress communications and noted the potential for such 
    systems to complement existing services, but, also recognized that Big 
    LEO systems are not intended to replace existing international safety 
    services. Further, the Commission has begun to examine matters related 
    to enhanced 9-1-1 capability including position locations in PCS, 
    cellular and other mobile services in a recently initiated rule 
    making.\278\ We are, therefore, denying commenters requests that the 
    Commission require caller ID, standardized position information and 
    automatic routing for distress and safety communications or disaster 
    response communications. We will address those issues in our rulemaking 
    proceeding on enhanced 9-1-1 capability,\279\ and we will adopt section 
    25.143(f) substantially as proposed.
    ---------------------------------------------------------------------------
    
        \278\See Second Report and Order, Gen. Docket No. 90-314, 8 FCC 
    Rcd 7700 (1993), at para. 139. Notice of Proposed Rulemaking in CC 
    Docket No. 94-102, FCC 94-237 (adopted September 19, 1994) (Enhanced 
    9-1-1 Notice).
        \279\Id.
    ---------------------------------------------------------------------------
    
        200. We also noted, however, that we expected any satellite 
    licensee that chose to offer emergency or safety communications to 
    coordinate with appropriate SAR organizations.\280\ No commenters 
    opposed this suggestion and we are adding it to the proposed rule.
    ---------------------------------------------------------------------------
    
        \280\See Notice, note 2, supra, at para. 86.
    ---------------------------------------------------------------------------
    
        201. Comsat states that because of the critical nature of distress 
    and safety communications to the maritime community and the extensive 
    international effort that is underway to implement the Global Maritime 
    Distress and Safety System (GMDSS),\281\ the Commission should 
    determine the extent to which applicants for Big LEO systems will 
    provide distress and safety communications and participate in the 
    GMDSS.\282\ Mobile Datacom requests clarification of the proposed 
    requirement for position determination capability for Big LEO systems 
    related to distress communications.\283\ Specifically, it requests that 
    the Commission clarify whether Big LEO systems will be permitted to 
    arrange for radio determination satellite service (RDSS) from companies 
    such as Mobile Datacom.\284\.
    ---------------------------------------------------------------------------
    
        \281\Certain U.S. ships are required to carry radio equipment. 
    Carriage requirements are established by statute, treaty and in the 
    Commission's Rules. See, Sections 351 through 386 of the 
    Communications Act of 1934, 47 U.S.C. 351-386; Amendments to the 
    1974 SOLAS Convention concerning Radiocommunications for the Global 
    Maritime Distress and Safety System, Ch. IV, International 
    Convention for the Safety of Life at Sea, 32 U.S.T. 47, T.I.A.S. 
    9700 (1974); and subparts Q, R, S, T and W of the Commission's 
    Rules, 47 CFR subparts Q, R, S, T and W.
        \282\COMSAT Comments at 14.
        \283\Mobile Datacom apparently believes that the Commission 
    proposed a requirement for position information because of the 
    requirements in the Communications Act related to distress and 
    safety communications. The proposed requirement for position 
    information is, however, related to interference protection for the 
    radio astronomy service.
        \284\Mobile Datacom Comments at 14.
    ---------------------------------------------------------------------------
    
        202. As we noted in paragraph 86 of the Notice, Big LEO systems may 
    not be used in lieu of emergency beacons required to be carried by 
    statute or treaty. In response to Comsat's request, we note that Big 
    LEO systems cannot now be used to comply with the requirements of the 
    GMDSS. The requirements for GMDSS equipment and the approval process 
    are contained in Sec. Sec. 80.1101 and 80.1103, respectively, of the 
    Commission's Rules.\285\ There are, however, no restrictions 
    prohibiting any Big LEO system from carrying distress and safety 
    communications on an ancillary basis. Finally, in response to Mobile 
    Datacom's request for clarification of whether position determination 
    information can be supplied by an RDSS licensee, we proposed that Big 
    LEO systems be capable of determining the position of a user 
    transceiver, but did not specify how licensees have to derive the 
    position information. We believe that decision is best left to the 
    system provider. In conclusion, we are clarifying the language in 
    Section 25.143(f) regarding a licensee's responsibility to protect 
    distress communications and to make clear that although it is the 
    licensee's responsibility to determine position information of 
    transceivers that we are not prescribing how this must be 
    accomplished.\286\
    ---------------------------------------------------------------------------
    
        \285\See 47 CFR 80.1101 and 80.1103.
        \286\TRW states that Big LEO system licensees operating on U.S. 
    territorial waters are required to give priority to distress 
    communications. See TRW Comments at 194. Motorola stated that the 
    requirements of proposed rule section 25.143(f) would apply only for 
    MSS stations used to comply with an international agreement or 
    statute. See Motorola Comments at 68 and Reply Comments at 58.
    ---------------------------------------------------------------------------
    
    6. Other Requirements
        203. As proposed in the Notice and without objection from any 
    interested parties, we will adopt a specific rule that prohibits any 
    licensee from selling a bare license for a profit.\287\ This provision 
    is critical to discourage speculators and to prevent unjust enrichment 
    of those who do not implement their proposed systems. This provision is 
    not intended to prevent the infusion of capital by either debt or 
    equity financing, but any such transaction will be monitored to ensure 
    that it does not constitute an evasion of our anti-trafficking 
    provision.\288\ This rule, however, will not apply if auctions are 
    implemented. It is not intended to prohibit applicants who obtain 
    licenses by competitive bidding from negotiating post-auction resale 
    transactions.\289\
    ---------------------------------------------------------------------------
    
        \287\See Notice, note 2, supra, at para. 84.
        \288\Motorola is concerned that one applicant might prop up 
    another simply to guarantee access to the maximum possible spectrum 
    by CDMA operations. This concern can be appropriately addressed as a 
    real party in interest question if the issue arises. Motorola's 
    speculation about a possible future occurrence does not warrant 
    further consideration or action at this time.
        \289\See para. 96, supra.
    ---------------------------------------------------------------------------
    
        204. In the Notice, we also requested comment on whether any 
    additional public service requirements should be imposed on Big LEO 
    licensees. Those favoring such a requirement were instructed to provide 
    an analysis of the utility of Big LEO systems to provide these services 
    and an analysis of the existing systems used to provide these services, 
    including their costs. Several commenters recognize the important 
    potential of MSS for educational and public service uses.\290\ The 
    Corporation for Public Broadcasting (CPB), for example, discusses the 
    promise of Big LEO systems to provide educational services to those in 
    remote areas and to allow users throughout the world to take 
    ``electronic field trips.'' CPB urges that to ensure public access to 
    these services, the Commission should require licensees to make their 
    systems available to educators and students at preferential rates. It 
    further argues that even if the Commission does not mandate a rate 
    preference in this proceeding, it should consider imposing such a 
    requirement in a variety of other services.
    ---------------------------------------------------------------------------
    
        \290\See Joint Comments of the Association of America's Public 
    Television Stations and Public Broadcasting Service at 2; Comments 
    of National Public Radio at 2; Comments of the Corporation for 
    Public Broadcasting at 2-3.
    ---------------------------------------------------------------------------
    
        205. None of the LEO applicants support a mandatory service or 
    preferential rate requirement. Ellipsat notes that MSS systems are 
    unsuitable for providing the envisioned services. According to 
    Ellipsat, Big LEO systems have inherently low data rates and cannot 
    supply the high bandwidth required to support the contemplated 
    educational services without drastically absorbing MSS capacity.\291\ 
    Motorola further argues that requiring Big LEO operators to dedicate a 
    portion of their capacity to non-revenue generating activities would 
    unduly constrain MSS systems and would handicap them in their ability 
    to compete with other wireless services and with foreign MSS 
    providers.\292\ TRW and Motorola argue that none of the proponents of 
    such a requirement have provided a detailed analysis of existing 
    systems and costs, as required. In the absence of this analysis, they 
    conclude that there is no basis upon which the Commission could impose 
    public service requirements.\293\
    ---------------------------------------------------------------------------
    
        \291\Ellipsat Reply Comments at 36.
        \292\Motorola Reply Comments at 58.
        \293\TRW Reply Comments at 95; Motorola Reply Comments at 59.
    ---------------------------------------------------------------------------
    
        206. In light of the service hardships alleged by the system 
    proponents, we believe that a strong demonstration of need and 
    feasibility is required prior to adopting specific public service 
    requirements for Big LEO systems. We agree with Motorola and TRW that 
    there is not sufficient information in this record to support such 
    requirements at this time.
        207. The National Communication Systems (NCS) believes that Big LEO 
    licensees should be required to cooperate in providing national 
    security/emergency preparedness services (NS/EP) and that any 
    discussion of technical requirements for Big LEO systems should address 
    survivable and endurable communications. NCS does not propose specific 
    rules but instead requests that the Commission consider these issues in 
    its report and order. We note that the Commission has chartered a 
    federal advisory committee, the Network Reliability Council (NRC), to 
    consider whether and to what extent essential services, including 
    emergency 9-1-1 service, health, safety and other emergency 
    communications services, are compromised during network outages.\294\ 
    The NRC agreed that national security would be included within the 
    topic of emergency services pursuant to its charter.\295\ We further 
    note that on September 19, 1994 the Commission adopted a Notice of 
    Inquiry requesting comment on the extent to which mobile radio 
    services, including LEO MSS, should be required to meet compatibility 
    requirements with 9-1-1 services.\296\ The Commission will consider 
    issues regarding the availability of reliable emergency services in 
    these proceedings.
    ---------------------------------------------------------------------------
    
        \294\See 59 FR 31246 (June 17, 1994).
        \295\See Minutes of the Network Reliability Council Meeting, 
    July 6, 1994.
        \296\See Enhanced 9-1-1 Notice, note 278, supra.
    ---------------------------------------------------------------------------
    
    F. Mobile Earth Station Licensing
    
        208. In the Notice, the Commission proposed a licensing procedure 
    for the earth station segment of the satellite system. We indicated 
    that the ground segment will be comprised of central fixed-earth 
    ``gateway'' stations operating in the feeder link frequency bands, 
    mobile user transceiver units operating in the mobile satellite 
    frequency bands, and tracking, telemetry and command (TT&C) earth 
    stations operating in either the feeder link, mobile service or space 
    bands. We proposed to license gateway and TT&C stations as fixed-
    satellite earth stations under Part 25. In addition, we proposed a 
    blanket licensing approach for the user transceivers. Under this 
    approach, a service vendor, which may or may not be the space station 
    licensee, would hold the authorization and would be responsible for a 
    specified number of technically identical transceiver units. Blanket 
    applications would include a demonstration that the operation of 
    transceivers will not interfere with other authorized users. License 
    term would be ten years from date of grant and requests for additional 
    units would be treated as minor license modifications.\297\ In 
    addition, we proposed that an end user be required to obtain 
    authorization of the space station operator before the user may 
    transmit to that system and, that once access authority is obtained, 
    the operations of that transceiver would fall under the blanket earth 
    station license of the space station operator or the vendor. Our 
    proposed rules would not preclude bilateral, government-to-government 
    discussions regarding international roaming arrangements. They would 
    also permit roaming into the United States by users having technically 
    compatible transceivers designed to operate with U.S. licensed systems 
    and once authorized to access a U.S. system, a roaming user's 
    transceiver operations would fall within the blanket license of the 
    satellite operator or the service vendor. The regulatory treatment of 
    earth station licensees providing commercial mobile radio services 
    would be as common carriers.\298\
    ---------------------------------------------------------------------------
    
        \297\See proposed Secs. 25.115(d), 25.130(b), 25.133(b), 25.136, 
    and 25.213.
        \298\See Notice, note 2, supra, at paras. 88-90.
    ---------------------------------------------------------------------------
    
        209. The comments received in response to our proposals were 
    favorable\299\ and thus we will adopt the rules substantially as 
    proposed. Constellation and Motorola, suggested several minor 
    clarifications to the final rules and we will adopt these 
    suggestions.\300\ We will not, however, adopt at this time a complete 
    revision of Sec. 25.115, Applications for Earth Station Authorizations, 
    as suggested by Motorola. If experience with these licensing procedures 
    indicates that this rule, as it applies to the Big LEO service, needs 
    to be amended, we will consider doing so at a later time.\301\
    ---------------------------------------------------------------------------
    
        \299\See e.g., Comments of TRW, Inc. and Comsat Corporation.
        \300\These include adding to Sec. 25.115(d)(3) the words ``if 
    not already licensed under this subpart'' to clarify that gateway, 
    TT&C and Network Control earth stations can be licensed under other 
    procedures; adding to Sec. 25.120(e) language relating to renewals 
    and cut-off periods; clarifying Sec. 25.136(b) to distinguish 
    between authorization of a particular unit and use of the system; 
    clarifying Sec. 25.130(b) to recognize specific procedures for NVNG 
    MSS transceiver units; and clarifying Sec. 25.136(a) to include 
    cockpit communications.
        \301\Other than Sec. 25.213(b), we will not adopt specific 
    technical requirements for Big LEO transceivers at this time. These 
    requirements are being considered in domestic and international fora 
    and will be codified, if necessary, when earth station applications 
    have been filed. We note that user transceivers will be required to 
    comply with all applicable domestic and international standards 
    governing their operations, including the radiofrequency radiation 
    levels recommended by the American National Standards Institute 
    (ANSI). See 47 CFR 1.1.1307(b).
    ---------------------------------------------------------------------------
    
    G. International Issues
    
    1. Coordination
        210. As we stated in the Notice, non-geostationary mobile 
    satellites, in their orbits around the world, will pass over all 
    countries. Because these systems provide global coverage, each will 
    require global coordination. As with all satellite services, each Big 
    LEO applicant and licensee will be required to provide the Commission 
    with all information necessary for advance publication, coordination, 
    and notification of frequency assignments pursuant to the international 
    Radio Regulations and for consultation pursuant to Article 14 of the 
    INTELSAT Agreement and Article 8 of the INMARSATQ Convention.\302\
    ---------------------------------------------------------------------------
    
        \302\See 47 CFR 25.111(b).
    ---------------------------------------------------------------------------
    
        211. Furthermore, the ITU (WARC-92) has adopted Resolution 46 to 
    govern the coordination of mobile satellite systems in this frequency 
    band. This procedure assures that worldwide coordination is 
    accomplished in a manner that requires both the administration 
    proposing the system and the administration that is affected by the 
    planned system to cooperate in resolving coordination 
    difficulties.\303\ We agree with LQP and TRW that successful 
    coordination under Resolution 46 is not a prerequisite for licensing, 
    launching and operating these systems.\304\ We note, however, that 
    until they successfully complete coordination they cannot cause harmful 
    interference to other primary services operating in these frequency 
    bands, nor can they claim protection. We, however, will follow the 
    coordination procedures prescribed by the ITU and will work with the 
    global community to promote mobile satellite services through the 
    development of sharing techniques and the exploration of other 
    technical issues.\305\ Moreover, as we stated in our Notice, we will 
    continue to require our licensees to meet both their international 
    obligations and any national requirements imposed by other licensing 
    administrations regarding operations within their territories.\306\ We 
    continue to believe that decisions relating to the implementation of 
    Big LEO service within a country's territory will remain within that 
    country's jurisdiction and control.
    ---------------------------------------------------------------------------
    
        \303\ITU Resolution No. 46 (WARC-92, Res. 46) states that 
    ``[a]ffected administrations, as well as the administration seeking 
    coordination, shall make all possible mutual efforts to overcome the 
    difficulties in a manner acceptable to the parties concerned.''
        \304\See LQP Comments at 117 and TRW Comments at 196. However, 
    as we stated in our Notice, if a licensee has not completed 
    coordination prior to launch, it must operate on a non-interference 
    basis with respect to authorized users. See International Radio 
    Regulation (RR) 342.
        \305\Indeed, the United States participates actively in ITU-R 
    Study Groups 2, 4 and 8, all of which are examining issues that 
    address sharing and coordination of MSS systems.
        \306\To the extent a licensee does not desire to meet a national 
    requirement of a licensing administration within its territory, it 
    may refrain from providing service to that particular 
    administration. See TRW Comments at 196.
    ---------------------------------------------------------------------------
    
        212. In the Joint Proposal, the parties state that the Commission 
    should establish a global band segmentation sharing plan different than 
    the spectrum domestic spectrum plan. Specifically, the parties state 
    that outside of North America, CDMA MSS licensees should be limited to 
    operating their systems over 9.75 MHz of spectrum at 1610-1619.75 MHz 
    and that the TDMA MSS licensee should be limited to operating its 
    system over 6.75 MHz of spectrum at 1619.75-1626.5 MHz. According to 
    the Joint Proposal, all U.S. international coordination activity should 
    be based either on the domestic band segmentation plan we are adopting 
    today, or, outside North America, on the proposed global plan. In 
    addition, the parties to the Joint Proposal request the Commission to 
    prohibit MSS licensees from seeking or accepting an exclusive 
    assignment in the 1.6 GHz band that would preclude other MSS systems 
    from providing service in any foreign country. LQP objects to these 
    proposals, stating that they could be construed as preempting other 
    nations' sovereign decisions.
        213. We will not impose a global band sharing plan on U.S. 
    licensees at this time. The four parties to the Joint Proposal have not 
    given any justification for doing so, and one applicant specifically 
    opposes the imposition of such a plan. We have no evidence on the 
    record before us of imminent coordination conflicts among the 
    applicants beyond U.S. borders. Neither is it clear at present that 
    operating constraints designed to accommodate our domestic licensees 
    will provide either necessary or effective in other jurisdictions. 
    Perhaps most importantly, we do not believe it is appropriate for the 
    United States to impose global band sharing restrictions, that directly 
    impact the ability of other countries to access these systems as they 
    see fit, absent indications from these countries regarding their 
    planned use of these frequency bands. Accordingly, we will not mandate 
    a band sharing scheme to be followed beyond U.S. borders.
    2. EC Concerns
        214. The Delegation of the European Commission (EC) is concerned 
    that the proposals in the Notice are based purely upon domestic U.S. 
    interests despite the global nature of the proposed systems and 
    services. Specifically, the EC alleges that the Notice: (1) Fails to 
    take into account proposed non-U.S. or future systems, their access to 
    the U.S. market and use of spectrum in the U.S.; (2) indicates an 
    intention to extend Section 310 restrictions to the proposed systems 
    inhibiting potential European investment; (3) advances trade and 
    industrial policy arguments underlining the importance of the proposed 
    systems to the U.S. economy and U.S. leadership; (4) proposes 
    unilateral solutions to orbit, frequency and coverage issues that are 
    global in nature; (5) fails to discuss requirements to effect the 
    satisfactory application of Resolutions 46 and 70 of WARC-92; and (6) 
    fails to address issues related to the 2 GHz band. The EC states that 
    the regulatory approach that we proposed raises global regulatory and 
    trade issues and that the U.S. should not proceed with its domestic 
    licensing process until it consults with foreign administrations.
        215. We agree that the proposed systems have international 
    ramifications. Many of these are or will be addressed in appropriate 
    international fora and in ITU satellite coordination activities. Others 
    may be appropriate for bilateral consultations of the nature sought by 
    the EC. However, we do not agree that the U.S. domestic licensing 
    process must await final resolution of these issues.
        216. We find delaying the U.S. licensing process is unacceptable. 
    Delaying our regulatory process would delay the improved communications 
    and economic growth that Big LEO services will create. These benefits 
    would be developed both for citizens of the United States and all other 
    countries that may choose to participate in rendering these services. 
    Such a delay would also harm developing countries by limiting their 
    opportunity to improve their communications infrastructure. The 
    uncertainty associated with delay could also adversely impact the 
    viability of the proposed systems in the financial markets and the 
    ability of the applicants to attract additional investors. U.S. 
    applicants have already invested significant resources in research and 
    development, satellite design, marketing and participation in ITU 
    meetings and conferences. Even if the United States were to delay its 
    licensing process, it is unclear how the EC proposes to resolve the 
    issues it has identified, resulting in open-ended delay. Further, the 
    EC's criticism of our proposals is not accompanied by recommendations. 
    Indeed, it is not clear that the EC is yet in a position to speak 
    authoritatively for its member countries. We do not believe that an 
    indefinite delay in the U.S. regulatory process under such 
    circumstances is warranted.
        217. It is also clear that we do not need to delay the domestic 
    licensing proceeding until international agreements are finalized. 
    Regardless of our domestic decisions, each administration will retain 
    the right to license gateway earth stations and mobile earth stations 
    needed to provide service. In addition, U.S. licensees will be subject 
    to ITU recommendations and coordination procedures. Further, the United 
    States is working with the ITU Radio Communications sector to develop 
    standards applicable to LEO systems. However, we seek to leave system 
    design and service offerings to the licensees as much as possible in 
    order to encourage technological innovation, to promote rapid 
    implementation of Big LEO services and to maximize consumer choice. 
    Therefore it is in the interest of the United States government and 
    U.S. system operators to seek globally acceptable standards and we will 
    strive to do so. We disagree with the EC that we are not taking into 
    account projects envisaged outside the United States and future global 
    systems that might use the spectrum. In the Notice, we noted that all 
    U.S. satellite systems are subject to ITU coordination procedures.\307\ 
    Thus, U.S.-licensed operators are required to coordinate their proposed 
    systems with countries whose existing services, or whose possible 
    future MSS systems, might be affected. Regardless of the spectrum 
    licensing arrangement within the United States, we would work with 
    affected administrations to resolve any spectrum sharing or technical 
    issues. Further, we are not precluding access to the U.S. market. We 
    believe, however, that subject is more appropriately handled through 
    bilateral discussions (as the EC contemplates) and the ITU coordination 
    process.
    ---------------------------------------------------------------------------
    
        \307\Notice, not 2, supra, at para. 91.
    ---------------------------------------------------------------------------
    
        218. In addition, we are not seeking to extend Sec. 310 
    restrictions on the proposed systems with the intention of inhibiting 
    European investment. In fact, Sec. 310(b) restrictions will not 
    necessarily apply to the systems because we are not requiring them to 
    operate on a common carrier basis.\308\ This policy will permit 
    investment by European industry and other non-government interests. 
    Some of the proposed systems already anticipate significant non-U.S. 
    investment and continue to seek additional such participation. We 
    recognize multinational participation as an integral part of developing 
    a global system.
    ---------------------------------------------------------------------------
    
        \308\See paras. 171-181, supra.
    ---------------------------------------------------------------------------
    
        219. With regard to the EC's concern that we are advancing trade 
    and industrial policy arguments by moving ahead with the proposed 
    systems, we note that a report prepared by PKMG Peat Marwick on behalf 
    of the European Commission suggests that (with regard to Europe), ``* * 
    * the immediate priority is international trade and policy 
    issues;''\309\ the very issues the EC accuses the United States of 
    advancing. Notwithstanding the EC's views, the United States has every 
    right under established ITU procedures to move forward with licensing 
    systems that are necessary to satisfy domestic demand for new 
    communication services. Other administrations have the right to decide 
    whether these or any other non-U.S. licensed systems will operate in 
    their countries and whether to participate in the provision of 
    services. Participation in providing these MSS services will give their 
    industries the opportunity to share in the global economic benefits we 
    believe these systems will bring.
    ---------------------------------------------------------------------------
    
        \309\See ``Satellite Personal Communications and their 
    Consequences for European Telecommunications Trade and Industry,'' 
    KPMG Peat Marwick, at 4, emphasis added.
    ---------------------------------------------------------------------------
    
    
        220. The EC also argues that the Notice proposes unilateral 
    solutions to orbit, frequency and coverage issues that have global 
    implications. Further, it contends that the Notice fails to discuss 
    requirements necessary to effect the application of ITU Resolution Nos. 
    46 and 70.
        221. With regard to orbit considerations\310\ and the use of 1.6/
    2.4 GHz frequencies, we note that as a matter of course the United 
    States engages in good faith negotiations with respect to whatever non-
    U.S. systems have been filed with the ITU at the time U.S. systems are 
    ready to begin coordination.\311\ Consequently, the use of the orbits 
    and of frequencies by U.S.-licensed systems will be subject to the 
    outcome of the ITU coordination process. The worldwide coverage 
    conditions proposed in the Notice\312\ result from our desire that 
    these systems be capable of providing coverage to all areas of the 
    world. This could further U.S. participation in the global information 
    infrastructure and potentially benefit developing countries. Again, 
    however, whether U.S.-licensed systems provide services outside the 
    United States would be subject to the agreement of and authorization by 
    other administrations.
    ---------------------------------------------------------------------------
    
        \310\We assume here that the EC refers to non-geostationary vs. 
    geostationary orbits.
        \311\We note that the following administrations have proposed 
    MSS systems in the 1.6/2.4 GHz bands that have been advance 
    published, coordinated or notified with the ITU: France (2 systems); 
    Germany; INMARSAT; Russian Federation (2 systems); Tonga (4 
    systems); and the United States (2 systems).
        \312\Notice, note 2, supra, at para. 23.
    ---------------------------------------------------------------------------
    
        222. With regard to the application of Resolutions No. 46 and 70, 
    we note that Resolution No. 46 relates to ``interim'' procedures for 
    the coordination and notification of non-geostationary satellite 
    networks. As an interim procedure it is subject to further development 
    and will likely evolve. Nevertheless, U.S.-licensed systems will be 
    subject to whatever coordination procedures are in effect at the time, 
    including Resolution 46 or its successor. In the Notice we stated 
    explicitly that we would follow coordination procedures prescribed by 
    the ITU, and in fact we reference Resolution No. 46 and its 
    applicability to Big LEO systems.\313\ We also note that each Big LEO 
    applicant will be required to provide us all information necessary to 
    advance publish, notify and coordinate their proposed systems. 
    Implicitly, all applicants will be required to assist us in effecting 
    whatever coordination procedures the ITU requires.\314\
    ---------------------------------------------------------------------------
    
        \313\Notice, note 2, supra, at para. 92 and n. 149.
        \314\This requirement applies to all FCC-licensed satellite 
    systems and is codified in the FCC rules. See 47 CFR 25.111(b).
    
        223. On the other hand, Resolution 70 relates to ``establishment'' 
    of standards for low-orbit satellite systems and has no requirements 
    per se. It seeks to begin the process of establishing standards for 
    low-orbit satellite systems and invites the appropriate ITU organs to 
    begin studies in this regard. The United States participates in these 
    ITU activities and will continue to do so. However, as Resolution No. 
    70 has not resulted in any specific ITU recommendations, it is not 
    possible to address ``requirements'' in a domestic licensing 
    proceeding.
        224. Finally, the EC contends that the Notice fails to address 
    issues related to access to 2 GHz MSS bands\315\ and the relation 
    between access to those bands and the bands under consideration here. 
    First, we note that the 2 GHz bands have not yet been allocated for MSS 
    in the United States. Therefore, these bands will be the subject of 
    another proceeding. In such a proceeding, all matters relevant to the 
    use of 2 GHz bands would be discussed. Nevertheless, we note the 
    increasing demand for access to MSS spectrum worldwide and the 
    potential value of the 2 GHz bands for the provision of MSS. We are 
    also aware of proposals to use the 2 GHz bands for services similar and 
    competitive to those envisaged by the Big LEO applicants.\316\ The 
    United States would like to facilitate access to these bands, as does 
    the EC. We believe that WRC-95 and future multi-lateral consultations 
    would present the appropriate fora to discuss access to and use of 2 
    GHz MSS bands.
    ---------------------------------------------------------------------------
    
        \315\The ``2 GHz'' MSS bands were allocated at WARC-92 as 
    follows: 1970-1980 MHz and 2160-2170 MHz: (Regions 1 and 3)--Fixed, 
    Mobile; (Region 2)--Fixed, Mobile, Mobile-Satellite*. 1980-2010 MHz 
    and 2170-2200 MHz: (Regions 1, 2 and 3)--Fixed, Mobile, Mobile-
    Satellite*. (*=These MSS allocations are available for use after 
    Jan. 1, 2005, except in the U.S., when they will be available after 
    Jan. 1, 1996.)
        \316\For example, the FCC has received two petitions (names) to 
    provide MSS services in this range. In addition, spectrum in this 
    range has been identified for a satellite component of FLMPTS.
    ---------------------------------------------------------------------------
    
    IV. Final Regulatory Flexibility Analysis
    
        225. Need for Rules and Objective. We have codified proposed rules 
    that will permit Big LEO systems to be licensed. Our objectives have 
    been to promote efficiency and innovation in the licensing and use of 
    the electromagnetic spectrum, to develop competitive and innovative 
    communications systems, and to promote effective and adaptive 
    regulations.
        226. Issues Raised by the Public in Response to the Initial 
    Analysis. No comments were received specifically in response to the 
    Initial Regulatory Flexibility Analysis. We have, however, taken into 
    account all issues raised by the public in response to the proposed 
    rules. In certain instances, we have eliminated or modified our 
    proposed rules in response to those comments.
        227. Alternatives that would Lessen Impact. The minimal regulatory 
    burden that we have imposed is necessary in order to carry out our 
    duties under the Communications Act and other Federal statutes. We will 
    continue to examine these requirements in an effort to eliminate 
    unnecessary regulations and to minimize significant economic impact on 
    small businesses.
    
    V. Conclusion and Ordering Clause
    
        228. By our action today, we are adopting regulations that will 
    allow the licensing of competitive voice and data Big LEO systems. This 
    service has the potential to provide the United States public with a 
    wide range of needed mobile voice services and to help stimulate the 
    domestic economy as these multi-billion dollar systems are implemented 
    in the United States and throughout the world.
        229. Accordingly, It Is Ordered that Parts 25 and 94 of the 
    Commission's rules are amended as specified in Appendix B, effective 
    November 21, 1994.
        230. It Is Further Ordered that the applicants will be required to 
    file conforming amendments and all necessary fees no later than 
    November 16, 1994 for continued consideration in this processing group.
    
    List of Subjects
    
    47 CFR Part 25
    
        Communications common carriers, Reporting and recordkeeping 
    requirements, Satellites
    
    47 CFR Part 94
    
        Communications equipment, Radio, Reporting and recordkeeping 
    requirements
        For the reasons set forth in the preamble, Title 47, Parts 25 and 
    94, of the Code of Federal Regulations, is amended as set forth below.
        Title 47 of the Code of Federal Regulations, Parts 25 and 94, are 
    amended as follows:
    
    PART 25--[AMENDED]
    
        1-2. The authority citation for Part 25 continues to read as 
    follows:
    
        Authority: Secs. 25.101 to 25.601 issued under Sec. 4, 48 Stat. 
    1066, as amended; 47 U.S.C. 154. Interprets or apply secs. 101-104, 
    76 Stat. 419-427; 47 U.S.C. 701-744; 47 U.S.C. 554.
    
        3. Section 25.114 is amended by revising paragraphs (c)(6), 
    (c)(18), and (c)(26), and adding new paragraphs (c)(28) and (d), to 
    read as follows:
    
    
    Sec. 25.114  Applications for space station authorizations.
    
    * * * * *
        (c) * * *
        (6)(i) For geostationary satellite orbit satellites, orbital 
    location, or locations if alternatives are proposed, requested for the 
    satellite, the factors which support such an orbital assignment, the 
    range of orbital locations from which adequate service can be provided 
    and the basis for determining that range of orbital locations, and a 
    detailed explanation of all factors that would limit the orbital arc 
    over which the satellite could adequately serve its expected users.
        (ii) For non-geostationary satellite orbit satellites, the number 
    of space stations and applicable information relating to the number of 
    orbital planes, the inclination of the orbital plane(s), the orbital 
    period, the apogee, the perigee, the argument(s) of perigee, active 
    service arc(s), and right ascension of the ascending node(s).
        (iii) For 1.6/2.4 GHz Mobile-Satellite Service space stations, the 
    feeder link frequencies requested for the satellite, together with the 
    demonstration required by Secs. 25.203 (j) and (k).
    * * * * *
        (18) Detailed information demonstrating the financial 
    qualifications of the applicant to construct and launch the proposed 
    satellites. Applications for domestic fixed-satellite systems and 
    mobile-satellite systems shall provide the financial information 
    required by Sec. 25.140(b)-(e), Sec. 25.142(a)(4), or 
    Sec. 25.143(b)(3), as appropriate. Applications for international 
    satellite systems authorized pursuant to Establishing of Satellite 
    Systems Providing International Communications, 50 FR 42266 (October 
    18, 1985), 101 FCC 2d 1046 (1985), recon. 61 RR 2d 649 (1986), further 
    recon. 1 FCC Rcd 439 (1986), shall provide the information required by 
    that decision.
    * * * * *
        (26) Applications for authorizations in the Mobile-Satellite 
    Service in the 1545-1559/1646.5-1660.5 MHz frequency bands shall also 
    provide all information necessary to comply with the policies and 
    procedures set forth in Rules and Policies Pertaining to the Use of 
    Radio Frequencies in a Land Mobile Satellite Service, 52 FR 4017 (Feb. 
    9, 1987), 2 FCC Rcd 485 (1987).
    * * * * *
        (28) Applications for authorizations in the 1.6/2.4 GHz Mobile-
    Satellite Service shall also provide all information specified in 
    Sec. 25.143.
        (d) Applicants requesting authority to construct and/or launch a 
    system comprised of technically identical, non-geostationary satellite 
    orbit mobile-satellite service space stations may file a single 
    ``blanket'' application containing the information specified in 
    paragraph (c) of this section for each representative space station.
        4. Section 25.115 is amended by revising paragraph (d) to read as 
    follows:
    
    
    Sec. 25.115  Applications for earth station authorizations.
    
    * * * * *
        (d) User transceivers in the NVNG and 1.6/2.4 GHz Mobile-Satellite 
    Service need not be individually licensed. Service vendors may file 
    blanket applications for transceiver units using FCC Form 493 and 
    specifying the number of units to be covered by the blanket license. 
    Each application for a blanket license under this section shall include 
    the following:
        (1) A general narrative section describing the applicant and the 
    overall system operation,
        (2) A Form 430 (Licensee Qualification Report), if not already on 
    file in conjunction with other facilities licensed under this subpart,
        (3) A Form 493 for each representative type of user transceiver 
    terminal unit,
        (4) A designation of a point of contact where records of individual 
    users will be maintained.
    
    In addition, applicants in the NVNG MSS service shall provide the 
    information described in Sec. 25.135. Applicants in the 1.6/2.4 GHz 
    Mobile-Satellite Service shall demonstrate that the stations comply 
    with the technical requirements specified in Sec. 25.213.
    
        5. Section 25.120 is amended by revising paragraphs (d) and (e) to 
    read as follows:
    
    
    Sec. 25.120  License term and renewals.
    
    * * * * *
        (d) Space stations.
        (1) For geostationary satellite orbit satellites, the license term 
    will begin at 3 a.m. EST on the date the licensee certifies to the 
    Commission that the satellite has been successfully placed into orbit 
    and that the operations of the satellite fully conform to the terms and 
    conditions of the space station radio authorization.
        (2) For non-geostationary satellite orbit satellites, the license 
    term will begin at 3 a.m. EST on the date that the licensee certifies 
    to the Commission that its initial space station has been successfully 
    placed into orbit and that the operations of that satellite fully 
    conform to the terms and conditions of the space station system 
    authorization. All space stations launched and brought into service 
    during the ten-year license term shall operate pursuant to the system 
    authorization, and the operating authority for all space stations will 
    terminate upon the expiration of the system license.
        (e) Renewal of licenses. Applications for renewals of earth station 
    licenses must be submitted on FCC Form 405 (Application for Renewal of 
    Radio Station License in Specified Services) no earlier than 90 days, 
    and no later than 30 days, before the expiration date of the license. 
    Applications for space station system replacement authorization for 
    non-geostationary orbit satellites shall be filed no earlier than 90 
    days, and no later than 30 days, prior to the end of the seventh year 
    of the existing license term.
        6. Section 25.130 is amended by revising paragraph (b) to read as 
    follows:
    
    
    Sec. 25.130  Filing requirements for transmitting earth stations.
    
    * * * * *
        (b) A frequency coordination analysis in accordance with 
    Sec. 25.203 shall be provided for earth stations transmitting in the 
    frequency bands shared with equal rights between terrestrial and space 
    services, except that applications for user transceiver units 
    associated with the NVNG mobile-satellite service shall instead provide 
    the information required by Sec. 25.135 and applications for user 
    transceiver units associated with the 1.6/2.4 GHz Mobile-Satellite 
    Service shall demonstrate that user transceiver operations comply with 
    the requirements set forth in Sec. 25.213.
        7. Section 25.133 is amended by revising paragraph (b) to read as 
    follows:
    
    
    Sec. 25.133  period of construction; certification of commencement of 
    operation.
    
    * * * * *
        (b) Each license for a transmitting earth station included in this 
    part shall also specify as a condition therein that upon the completion 
    of construction, each licensee must file with the Commission a 
    certification containing the following information: The name of the 
    licensee; file number of the application; call sign of the antenna; 
    date of the license; a certification that the facility as authorized 
    has been completed and that each antenna facility has been tested and 
    is within 2 dB of the pattern specified in Sec. 25.209, Sec. 25.135 
    (NVNG MSS earth stations), or Sec. 25.213 (1.6/2.4 GHz Mobile-Satellite 
    Service earth stations); the date on which the station became 
    operational; and a statement that the station will remain operational 
    during the license period unless the license is submitted for 
    cancellation. For stations authorized under Sec. 25.115(c) of this part 
    (Large Networks of Small Antennas operating in the 12/14 GHz bands) and 
    Sec. 25.115(d) of this part (User Transceivers in the Mobile-Satellite 
    Service), a certificate must be filed when the network is put into 
    operation.
        8. A new Sec. 25.136 is added to read as follows:
    
    
    Sec. 25.136  Operating provisions for earth station networks in the 
    1.6/2.4 GHz mobile-satellite service.
    
        In addition to the technical requirements specified in Sec. 25.213, 
    earth stations operating in the 1.6/2.4 GHz Mobile-Satellite Service 
    are subject to the following operating conditions:
        (a) User transceiver units associated with the 1.6/2.4 Mobil-
    Satellite service may not be operated on civil aircraft unless the 
    earth station has a direct physical connection to the aircraft Cabin 
    Communication system.
        (b) User transceiver units in this service are authorized to 
    communicate with and through U.S. authorized space stations only. No 
    person shall transmit to a space station unless the specific 
    transmission is first authorized by the space station licensee or by a 
    service vendor authorized by that licensee.
        (c) Any user transceiver unit associated with this service will be 
    deemed, when communicating with a particular 1.6/2.4 GHz Mobile-
    Satellite Service system pursuant to paragraph (b) of this section, to 
    be temporarily associated with and licensed to the system operator or 
    service vendor holding the blanket earth station license awarded 
    pursuant to Section 25.115(d). The domestic earth station licensee 
    shall, for this temporary period, assume the same licensee 
    responsibility for the user transceiver as if the user transceiver were 
    regularly licensed to it.
        9. Section 25.141 is amended by revising paragraphs (a) and (f) to 
    read as follows:
    
    
    Sec. 25.141  Licensing provisions for the radio-determination satellite 
    service.
    
        (a) Space station application requirements. Each application for a 
    space station license in the radiodetermination satellite service shall 
    describe in detail the proposed radiodetermination satellite system, 
    setting forth all pertinent technical and operational aspects of the 
    system, including its capability for providing and controlling 
    radiodetermination service on a geographic basis, and the technical, 
    legal and financial qualifications of the applicant. In particular, 
    each application shall include the information specified in Appendix B 
    of Space Station Application Filing Procedures, 93 FCC 2d 1260, 1265 
    (1983), except that in lieu of demonstrating compliance with item II.F 
    (two degree spacing), applicants are required to demonstrate 
    compatibility with licensed satellite systems in the same frequency 
    band. Applicants must also file information demonstrating compliance 
    with all requirements of this section, specifically including 
    information demonstrating how the applicant has complied or plans to 
    comply with the requirements of paragraph (f) of this section.
    * * * * *
        (f) Radiodetermination satellite service. Licenses shall coordinate 
    with radiodetermination satellite system licensees to avoid harmful 
    interference to other radiodetermination satellite systems through:
        (1) Power flux density limits;
        (2) Use of pseudorandom-noise codes (for both the satellite-to-user 
    link and for the user-to-satellite link); and
        (3) Random access, time division multiplex techniques.
    
    Licensees shall coordinate with 1.6/2.4 GHz Mobile-Satellite Service 
    system licensees to avoid interference to 1.6/2.4 GHz Mobile-Satellite 
    Service systems.
    
        10. A new Sec. 25.143 is added to read as follows:
    
    
    Sec. 25.143  Licensing provisions for the 1.6/2.4 GHz Mobile-Satellite 
    Service.
    
        (a) System License: Applicants authorized to construct and launch a 
    system of technically identical non-geostationary satellite orbit 
    satellites will be awarded a single ``blanket'' license covering a 
    specified number of space stations to operate in a specified number of 
    orbital planes.
        (b) Qualification Requirements.
        (1) General Requirements: Each application for a space station 
    system authorization in the 1.6/2.4 GHz mobile-satellite service shall 
    describe in detail the proposed satellite system, setting forth all 
    pertinent technical and operational aspects of the system, and the 
    technical, legal, and financial qualifications of the applicant. In 
    particular, each application shall include the information specified in 
    Sec. 25.114.
        (2) Technical Qualifications: In addition to providing the 
    information specified in paragraph (b)(1) of this section, each 
    applicant shall demonstrate the following:
        (i) That the proposed system employs a non-geostationary 
    constellation or constellations of satellites;
        (ii) That the proposed system be capable of providing mobile 
    satellite services to all locations as far north as 70 deg. latitude 
    and as far south as 55 deg. latitude for at least 75% of every 24-hour 
    period, i.e., that at least one satellite will be visible above the 
    horizon at an elevation angle of at least 5 deg. for at least 18 hours 
    each day within the described geographic area;
        (iii) That the proposed system is capable of providing mobile 
    satellite services on a continuous basis throughout the fifty states, 
    Puerto Rico and the U.S. Virgin Islands, U.S., i.e., that at least one 
    satellite will be visible above the horizon at an elevation angle of at 
    least 5 deg. at all times within the described geographic areas;
        (iv) That operations will not cause unacceptable interference to 
    other authorized users of the spectrum. In particular, each application 
    shall demonstrate that the space station(s) comply with the 
    requirements specified in Sec. 25.213.
        (3) Financial Qualifications: Each applicant for a space station 
    system authorization in the 1.6/2.4 GHz mobile-satellite service must 
    demonstrate, on the basis of the documentation contained in its 
    application, that it is financially qualified to meet the estimated 
    costs of the construction and launch of all proposed space stations in 
    the system and the estimated operating expenses for one year after the 
    launch of the initial space station. Financial qualifications must be 
    demonstrated in the form specified in Secs. 25.140(c) and (d). In 
    addition, applicants relying on current assets or operating income must 
    submit evidence of a management commitment to the proposed satellite 
    system. Failure to make such a showing will result in the dismissal of 
    the application.
        (c) Replacement of Space Stations Within the System License Term. 
    Licensees of 1.6/2.4 GHz mobile-satellite systems authorized through a 
    blanket license pursuant to paragraph (a) of this section need not file 
    separate applications to construct, launch and operate technically 
    identical replacement satellites within the term of the system 
    authorization. However, the licensee shall certify to the Commission, 
    at least thirty days prior to launch of such replacement(s) that:
        (1) The licensee intends to launch a space station that is 
    technically identical to those authorized in its system authorization, 
    and
        (2) Launch of this space station will not cause the licensee to 
    exceed the total number of operating space stations authorized by the 
    Commission.
        (d) In-Orbit Spares. Licensees need not file separate applications 
    to operate technically identical in-orbit spares authorized as part of 
    the blanket license pursuant to paragraph (a) of this section. However, 
    the licensee shall certify to the Commission, within 10 days of 
    bringing the in-orbit spare into operation, that operation of this 
    space station did not cause the licensee to exceed the total number of 
    operating space stations authorized by the Commission.
        (e) Reporting requirements.
        (1) All operators of 1.6/2.4 GHz mobile-satellite systems shall, on 
    June 30 of each year, file with the International Bureau and the Field 
    Office in Laurel, Maryland a report containing the following 
    information:
        (i) Status of satellite construction and anticipated launch dates, 
    including any major problems or delays encountered;
        (ii) A listing of any non-scheduled space station outages for more 
    than 30 minutes and the cause or causes of the outage;
        (iii) A detailed description of the utilization made of the in-
    orbit satellite system. That description should identify the percentage 
    of time that the system is actually used for U.S. domestic or 
    transborder transmission, the amount of capacity (if any) sold but not 
    in service within U.S. territorial geographic areas, and the amount of 
    unused system capacity; and
        (iv) Identification of any space stations not available for service 
    or otherwise not performing to specifications, the cause or causes of 
    these difficulties, and the date any space station was taken out of 
    service or the malfunction identified.
        (2) All operators of 1.6/2.4 GHz mobile-satellite systems shall, 
    within 10 days after a required implementation milestone as specified 
    in the system authorization, certify to the Commission by affidavit 
    that the milestone has been met or notify the Commission by letter that 
    it has not been met. At its discretion, the Commission may require the 
    submission of additional information (supported by affidavit of a 
    person or persons with knowledge thereof) to demonstrate that the 
    milestone has been met.
        (f) Safety and distress communications.
        (1) Stations operating in the 1.6/2.4 GHz Mobile-Satellite Service 
    that are voluntarily installed on a U.S. ship or are used to comply 
    with any statute or regulatory equipment carriage requirements may also 
    be subject to the requirements of sections 321(b) and 359 of the 
    Communications Act of 1934. Licensees are advised that these provisions 
    give priority to radio communications or signals relating to ships in 
    distress and prohibits a charge for the transmission of maritime 
    distress calls and related traffic.
        (2) Licensees offering distress and safety services should 
    coordinate with the appropriate search and rescue organizations 
    responsible for the licensees service area.
        (g) Considerations involving transfer or assignment applications.
        (1) ``Trafficking'' in bare licenses issued pursuant to paragraph 
    (a) of this section is prohibited, except with respect to licenses 
    obtained through a competitive bidding procedure.
        (2) The Commission will review a proposed transaction to determine 
    if the circumstances indicate trafficking in licenses whenever 
    applications (except those involving pro forma assignment or transfer 
    of control) for consent to assignment of a license, or for transfer of 
    control of a licensee, involve facilities licensed pursuant to 
    paragraph (a) of this section. At its discretion, the Commission may 
    require the submission of an affirmative, factual showing (supported by 
    affidavits of a person or persons with personal knowledge thereof) to 
    demonstrate that no trafficking has occurred.
        (3) If a proposed transfer of radio facilities is incidental to a 
    sale of other facilities or merger of interests, any showing requested 
    under paragraph (g)(2) of this section shall include an additional 
    exhibit which:
        (i) Discloses complete details as to the sale of facilities or 
    merger of interests;
        (ii) Segregates clearly by an itemized accounting, the amount of 
    consideration involved in the sale of facilities or merger of interest; 
    and
        (iii) Demonstrates that the amount of consideration assignable to 
    the facilities or business interests involved represents their fair 
    market value at the time of the transaction.
        11. Section 25.201 is amended by adding new paragraphs, in 
    alphabetical order, to read as follows:
    
    
    Sec. 25.201  Definitions.
    
    * * * * *
        Mobile-Satellite Service. A radiocommunication service:
        (1) Between mobile earth stations and one or more space stations, 
    or between space stations used by this service; or
        (2) Between mobile earth stations, by means of one or more space 
    stations.
    
        This service may also include feeder links necessary for its 
    operation. (RR)
    * * * * *
        1.6/2.4 GHz Mobile-Satellite Service. A mobile-satellite service 
    that operates in the 1610-1626.5 MHz and 2483.5-2500 MHz frequency 
    bands, or in any portion thereof.
    * * * * *
        12. Section 25.202 is amended by adding new paragraphs (a)(4) and 
    (a)(5) to read as follows:
    
    
    Sec. 25.202  Frequencies, frequency tolerance and emission limitations.
    
    * * * * *
        (a) * * *
        (4) The following frequencies are available for use by the 1.6/2.4 
    GHz Mobile-Satellite Service:
    
    1610-1626.5 MHz: User-to-Satellite Link
    1613.8-1626.5 MHz: Satellite-to-User Link (secondary)
    2483.5-2500 MHz: Satellite-to-User Link
    
        (5) The following frequencies are available for use by the inter-
    satellite service:
    
    22.55-23.00 GHz
    23.00-23.55 GHz
    24.45-24.65 GHz
    24.65-24.75 GHz
    
        13. Section 25.203 is amended by revising paragraph (c)(2)(vii) and 
    adding new paragraphs (j) and (k) to read as follows:
    
    
    Sec. 25.203  Choice of sites and frequencies.
    
    * * * * *
        (c) * * *
        (2) * * *
        (vii) Antenna horizon gain plot(s) determined in accordance with 
    Sec. 25.253(b) for satellite longitude range specified in paragraph 
    (c)(2)(v) of this section, taking into account the provisions of 
    Sec. 25.253(a)(2) for earth stations operating with non-geostationary 
    satellites.
    * * * * *
        (j) Applicants for non-geostationary 1.6/2.4 GHz Mobile-Satellite 
    Service/radiodetermination satellite service feeder links shall 
    indicate the frequencies and spacecraft antenna gain contours towards 
    each feeder-link earth station location and will coordinate with 
    licensees of other fixed-satellite service and terrestrial-service 
    systems sharing the band to determine geographic protection areas 
    around each non-geostationary mobile-satellite service/
    radiodetermination satellite service feeder link earth station.
        (k) An applicant for a non-geostationary 1.6/2.4 GHz Mobile-
    Satellite Service space station or earth station that will operate with 
    a geostationary satellite or non-geostationary satellite in a shared 
    frequency band in which the non-geostationary system is (or is proposed 
    to be) licensed for feeder links, shall demonstrate in its application 
    that its proposed space or earth station will not cause unacceptable 
    interference to any other satellite network that is authorized to 
    operate in the same frequency band, or certify that the operations of 
    its space or earth station shall conform to established coordination 
    agreements between the operator(s) of the space station(s) with which 
    the earth station is to communicate and the operator(s) of any other 
    U.S. space station licensed to use the band.
        14. Section 25.208 is amended by revising paragraph (c) to read as 
    follows:
    
    
    Sec. 25.208  Power flux density limits.
    
    * * * * *
        (c) In the 17.7-19.7 GHz, 22.55-23.00 GHz, 23.00-23.55 GHz, and 
    24.45-24.75 GHz frequency bands, the power flux density at the Earth's 
    surface produced by emissions from a space station for all conditions 
    and for all methods of modulation shall not exceed the following 
    values:
        (1) 115 dB (W/m\2\) in any 1 MHz band for angles of arrival between 
    0 and 5 degrees above the horizontal plane.
        (2) 115+0.5 (d-5) dB (W/m\2\) in any 1 MHz band for angles of 
    arrival d (in degrees) between 5 and 25 degrees above the horizontal 
    plane.
        (3) 105 dB (W/m\2\) in any 1 MHz band for angles of arrival between 
    25 and 90 degrees above the horizontal plane.
        15. A new Sec. 25.213 is added to read as follows:
    
    
    Sec. 25.213  Inter-Service coordination requirements for the 1.6/2.4 
    GHz Mobile-Satellite Service.
    
        (a) Protection of the radio astronomy service in the 1610.6-1613.8 
    MHz band against interference from 1.6/2.4 GHz Mobile-Satellite Service 
    systems.
        (1) Protection zones. All 1.6/2.4 GHz Mobile Satellite Service 
    systems shall be capable of determining the position of the user 
    transceivers accessing the space segment through either internal 
    radiodetermination calculations or external sources such as LORAN-C or 
    the Global Positioning System. During periods of radio astronomy 
    observations, land mobile earth stations shall not operate when located 
    within geographic protection zones defined by the radio observatory 
    coordinates and separation distances as follows:
        (i) In the band 1610.6-1613.8 MHz, within a 160 km radius of the 
    following radio astronomy sites:
    
    ------------------------------------------------------------------------
                                                       Latitude    Longitude
                      Observatory                       (DMS)        (DMS)  
    ------------------------------------------------------------------------
    Arecibo, PR.....................................    18 20 46    66 45 11
    Green Bank Telescope, WV........................    38 25 59    79 50 24
                                                        38 26 09    79 49 42
    Very Large Array, NM............................    34 04 43   107 37 04
    Owens Valley, CA................................    37 13 54   118 17 36
    Ohio State, OH..................................    40 15 06    83 02 54
    ------------------------------------------------------------------------
    
        (ii) In the band 1610.6-1613.8 MHz, within a 50 km radius of the 
    following sites:
    
    ------------------------------------------------------------------------
                                                       Latitude    Longitude
                       Observatory                      (DMS)        (DMS)  
    ------------------------------------------------------------------------
    Pile Town, NM...................................    34 18 04   108 07 07
    Los Alamos, NM..................................    35 46 30   106 14 42
    Kitt Peak, AZ...................................    31 57 22   111 36 42
    Ft. Davis, TX...................................    30 38 06   103 56 39
    N. Liberty, IA..................................    41 46 17    91 34 26
    Brewster, WA....................................    48 07 53   119 40 55
    Owens Valley, CA................................    37 13 54   118 16 34
    St. Croix, VI...................................    17 45 31    64 35 03
    Mauna Kea, HI...................................    19 48 16   155 27 29
    Hancock, NH.....................................    42 56 01   71 59 12 
    ------------------------------------------------------------------------
    
        (iii) Out-of-band emissions of a mobile earth station licensed to 
    operate within the 1610.0-1626.5 MHz band shall be attenuated so that 
    the power flux density it produces in the 1610.6-1613.8 MHz band at any 
    radio astronomy site listed in paragraph (a)(1) (i) or (ii) of this 
    section shall not exceed the emissions of a mobile earth station 
    operating within the 1610.6-1613.8 MHz band at the edge of the 
    protection zone applicable for that site. As an alternative, a mobile 
    earth station shall not operate during radio astronomy observations 
    within the 1613.8-1615.8 MHz band within 100 km of the radio astronomy 
    sites listed in paragraph (a)(1)(i) of this section, and within 30 km 
    of the sites listed in paragraph (a)(1)(ii) of this section, there 
    being no restriction on a mobile earth station operating within the 
    1615.8-1626.5 MHz band.
        (iv) For airborne mobile earth stations operating in the 1610.0-
    1626.5 MHz band, the separation distance shall be the larger of the 
    distances specified in paragraph (a)(1) (i), (ii) or (iii) of this 
    section, as applicable, or the distance, d, as given by the formula:
    
      d (km) = 4.1 square root of (h)
    
    where h is the altitude of the aircraft in meters above ground level.
        (v) Smaller geographic protection zones may be used in lieu of the 
    areas specified in paragraphs (a)(1) (i), (ii), (iii), and (iv) of this 
    section if agreed to by the Mobile-Satellite Service licensee and the 
    Electromagnetic Spectrum Management Unit (ESMU), National Science 
    Foundation, Washington, D.C. upon a showing by the Mobile-Satellite 
    Service licensee that the operation of a mobile earth station will not 
    cause harmful interference to a radio astronomy observatory during 
    periods of observation.
        (vi) The ESMU shall notify Mobile-Satellite Service space station 
    licensees authorized to operate mobile earth terminals in the 1610.0-
    1626.5 MHz band of periods of radio astronomy observations. The mobile-
    satellite systems shall be capable of terminating operations within the 
    frequency bands and protection zones specified in paragraphs (a)(1)(i) 
    through (iv) of this section, as applicable, after the first position 
    fix of the mobile earth terminal either prior to transmission or, based 
    upon its location within the protection zone at the time of initial 
    transmission of the mobile earth terminal. Once the mobile-satellite 
    system determines that a mobile earth terminal is located within an RAS 
    protection zone, the mobile-satellite system shall immediately initiate 
    procedures to relocate the mobile earth terminal operations to a non-
    RAS frequency.
        (vii) A beacon-actuated protection zone may be used in lieu of 
    fixed protection zones in the 1610.6-1613.8 MHz band if a coordination 
    agreement is reached between a mobile-satellite system licensee and the 
    ESMU on the specifics of beacon operations.
        (viii) Additional radio astronomy sites, not located within 100 
    miles of the 100 most populous urbanized areas as defined by the United 
    States Census Bureau at the time, may be afforded similar protection 
    one year after notice to the mobile-satellite system licensees by 
    issuance of a public notice by the Commission.
        (2) Mobile-Satellite Service space stations transmitting in the 
    1613.8-1626.5 MHz band shall take whatever steps necessary to avoid 
    causing harmful interference to the radio astronomy facilities listed 
    in paragraphs (a)(1)(i) and (ii) of this section during periods of 
    observation.
        (3) Mobile-Satellite Service space stations operating in the 
    2483.5-2500 MHz frequency band shall limit spurious emission levels in 
    the 4990-5000 MHz band so as not to exceed -241 dB (W/m2/Hz) at 
    the surface of the Earth.
        (4) The Radioastronomy Service shall avoid scheduling radio 
    astronomy observations during peak MSS/RDSS traffic periods to the 
    greatest extent practicable.
        (b) Protection of the radionavigation-satellite service. Mobile 
    earth stations operating in the 1610-1626.5 MHz band shall limit out-
    of-band emissions in the 1574.397-1576.443 MHz band so as not to exceed 
    an e.i.r.p. density level of -70 dB (W/MHz) averaged over any 20 ms 
    period. The e.i.r.p. of any discrete spurious emission (i.e., bandwidth 
    less than 600 Hz) in the 1574.397-1576.443 MHz band shall not exceed 
    -80 dBW.
        (c) Protection of aeronautical radionavigation systems. Mobile-
    satellite earth stations transmitting in the 1610-1626.5 MHz band shall 
    limit e.i.r.p. levels to no greater than -15 dB (W/4kHz) on frequencies 
    being used by systems operating in accordance with international Radio 
    Regulation RR 732, and to no greater than -3 dB (W/4kHz) on frequencies 
    that are not so being used. Pursuant to international RR 731F, 
    respectively, all mobile-satellite Earth-to-space operations in the 
    1610-1626.5 MHz band and mobile-satellite space-to-Earth operations in 
    the 1613.8-1626.5 MHz band must be coordinated and notified under the 
    procedures set forth in Resolution 46 (WARC-92). Such mobile-satellite 
    stations shall not cause harmful interference to, or claim protection 
    from, stations in the aeronautical radionavigation service and stations 
    operating pursuant to international RR 732.
        (d) Fixed stations operating pursuant to international Radio 
    Regulation RR 730. Pursuant to international Radio Regulations RR 731E 
    and RR 731F, all mobile-satellite operations in the 1610-1626.5 MHz 
    band (Earth-to-space transmissions) and all operations in the 1613.8-
    1626.5 MHz band (space-to-Earth transmissions), respectively, must be 
    coordinated with systems operating pursuant to international RR 730 
    according to the coordination and notification procedures set forth in 
    Resolution 46 (WARC-92). All such mobile-satellite stations shall not 
    cause harmful interference to, or claim protection from, stations in 
    the fixed service operating pursuant to international RR 730.
        16. A new Sec. 25.278 is added to subpart D to read as follows:
    
    
    Sec. 25.278  Additional Coordination Obligation for Non-Geostationary 
    and Geostationary Satellite Systems In Frequencies Allocated to the 
    Fixed-Satellite Service.
    
        Licensees of non-geostationary satellite systems that use frequency 
    bands allocated to the fixed-satellite service for their feeder link 
    operations shall coordinate their operations with licensees of 
    geostationary fixed-satellite service systems licensed by the 
    Commission for operation in the same frequency bands. Licensees of 
    geostationary fixed-satellite service systems in the frequency bands 
    that are licensed to non-geostationary satellite systems for feeder 
    link operations shall coordinate their operations with the licensees of 
    such non-geostationary satellite systems.
        17. A new Sec. 25.279 is added to subpart D to read as follows:
    
    
    Sec. 25.279  Inter-satellite service.
    
        (a) Any non-geostationary satellite communicating with other space 
    stations may use frequencies in the inter-satellite service as 
    indicated in Sec. 2.106. This does not preclude the use of other 
    frequencies for such purposes as provided for in several service 
    definitions, e.g., FSS. The technical details of the proposed inter-
    satellite link shall be provided in accordance with Sec. 25.114(c).
        (b) Operating conditions. In order to ensure compatible operations 
    with authorized users in the frequency bands to be utilized for 
    operations in the inter-satellite service, these inter-satellite 
    service systems must operate in accordance with the conditions 
    specified in this section.
        (1) Coordination requirements with federal government users. (i) In 
    frequency bands allocated for use by the inter-satellite service that 
    are also authorized for use by agencies of the federal government, the 
    federal use of frequencies in the inter-satellite service frequency 
    bands is under the regulatory jurisdiction of the National 
    Telecommunications and Information Administration (NTIA).
        (ii) The Commission will use its existing procedures to reach 
    agreement with NTIA to achieve compatible operations between federal 
    government users under the jurisdiction of NTIA and inter-satellite 
    service systems through frequency assignment and coordination practice 
    established by NTIA and the Interdepartment Radio Advisory Committee 
    (IRAC). In order to facilitate such frequency assignment and 
    coordination, applicants shall provide the Commission with sufficient 
    information to evaluate electromagnetic compatibility with the federal 
    government users of the spectrum, and any additional information 
    requested by the Commission. As part of the coordination process, 
    applicants shall show that they will not cause interference to 
    authorized federal government users, based upon existing system 
    information provided by the government. The frequency assignment and 
    coordination of the satellite system shall be completed prior to grant 
    of construction authorization.
        (2) Coordination among inter-satellite service systems. Applicants 
    for authority to establish inter-satellite service are encouraged to 
    coordinate their proposed frequency usage with existing permittees and 
    licensees in the inter-satellite service whose facilities could be 
    affected by the new proposal in terms of frequency interference or 
    restricted system capacity. All affected applicants, permittees, and 
    licensees, shall at the direction of the Commission, cooperate fully 
    and make every reasonable effort to resolve technical problems and 
    conflicts that may inhibit effective and efficient use of the radio 
    spectrum; however, the permittee or licensee being coordinated with is 
    not obligated to suggest changes or re-engineer an applicant's proposal 
    in cases involving conflicts.
    
    PART 94--[AMENDED]
    
        18. The authority citation for Part 94 continues to read as 
    follows:
    
        Authority: Secs. 4, 303, 48 Stat., as amended, 1066, 1082; 47 
    U.S.C. 154, 303, unless otherwise noted.
    
        19. The table in paragraph (b) of Sec. 94.61 is amended by revising 
    footnote 4 to read as follows:
    
    
    Sec. 94.61  Applicability.
    
    * * * * *
        (b) * * *
    
        Frequencies in this band are shared with mobile and 
    radiolocation stations in other services, and must accept harmful 
    interference that may be experienced from operations of industrial, 
    scientific, or medical (ISM) equipment operating at 2450 MHz. In the 
    2483.5-2500 MHz band, no applications for new stations or 
    modifications to existing stations to increase the number of 
    transmitters will be accepted. Existing licensees as of July 25, 
    1985, are grandfathered and their operation is co-primary with the 
    Radiodetermination Satellite Service and Mobile-Satellite Service. 
    However, all grandfathered temporary fixed licensees are required to 
    notify directly each Radiodetermination Satellite Service and 
    Mobile-Satellite Service licenses concerning present and proposed 
    locations of operations.
    
    Federal Communications Commission.
    William F. Caton,
    Acting Secretary.
    [FR Doc. 94-26090 Filed 10-19-94; 8:45 am]
    BILLING CODE 6712-01-M
    
    
    

Document Information

Published:
10/21/1994
Entry Type:
Uncategorized Document
Action:
Final Rule.
Document Number:
94-26090
Dates:
November 21, 1994.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: October 21, 1994
CFR: (20)
47 CFR 25.253(a)(2)
47 CFR 25.143(b)(3)
47 CFR 25.253(b)
47 CFR 25.115(d)
47 CFR 25.114
More ...