[Federal Register Volume 59, Number 203 (Friday, October 21, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-26144]
[[Page Unknown]]
[Federal Register: October 21, 1994]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-4716-4]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 260-5076 OR (202) 260-5075. Weekly receipt of
Environmental Impact Statements Filed October 10, 1994 Through October
14, 1994 Pursuant to 40 CFR 1506.9.
EIS No. 940422, Final Supplement, COE, WI, Wisconsin River Flood
Protection, Updated Information concerning the Portage Canal Lock,
General Design Memorandum and Flood Control Study, St. Paul District,
Columbia County, WI, Due: November 21, 1994, Contact: Robert Whiting
(612) 290-5264.
EIS No. 940423, Final EIS, AFS, CA, North Fork Kern/South Fork Kern
Wild and Scenic Rivers Management Plan, Implementation, Sequoia and
Inyo National Forests, Tulare and Kern Counties, CA, Due: November 21,
1994, Contact: Beverly Bauges (619) 376-3781.
EIS No. 940424, Final EIS, COE, ND, Lake Oahe Bridge Construction,
midway between Bismarck and Mobridge, SD, Funding, Emmons and Sioux
Counties, ND, Due: November 21, 1994, Contact: Richard E. Gorton (402)
221-4598.
EIS No. 940425, Final EIS, BLM, NV, Tonopah Resource Area, Resource
Management Plan, Implementation, Battle Mountain District, Nye and
Esmeralda Counties, NV, Due: November 21, 1994, Contact: Neil Talbot
(702) 785-6485.
EIS No. 940426, Final Supplement, NPS, AZ, NV, Lake Mead National
Recreation Area, General Management Plan, Updated Information on Willow
Beach Development Concept Plan Amendment, AZ and NV, Due: November 21,
1994, Contact: Jim Holland (702) 293-8986.
EIS No. 940427, Draft EIS, COE, IL, Sugar Creek Municipal Water Supply
Reservoir, COE Section 404 Permit Issuance, City of Marion, Williamson
and Johnson Counties, IL, Due: December 31, 1994, Contact: Terry S.
Siemsen (502) 582-5550.
EIS No. 940428, Draft EIS, COE, PR, Rio Fajardo Flood Control
Feasibility Study, Flood Protection, Implementation, PR, Due: December
5, 1994, Contact: Barbara Cintron (904) 232-1692.
EIS No. 940429, Final EIS, COE, LA, Port Fourchon Navigation Channel
Project, Channel Deepening, Implementation, Lafourche Parish, LA, Due:
November 21, 1994, Contact: Richard E. Boe (504) 862-1505.
EIS No. 940430, Draft EIS, NAS, Cassini Spacecraft Exploration Mission,
Explore the Planet Saturn, Implementation, Due: December 5, 1994,
Contact: Peter B. Ulrich (202) 358-0290.
EIS No. 940431, Final EIS, USN, FL, Pensacola Naval Air Station
Realignment, Relocation of Memphis Naval Air Station and Closure of San
Diego Naval Training Center, Implementation, Pensacola Bay, FL, Due:
November 21, 1994, Contact: Ronnie Lattimore (803) 743-0888.
EIS No. 940432, Draft EIS, NPS, WA, Elwha River Ecosystem Restoration,
Implementation, Olympic National Park, Clallam County, WA, Due:
December 20, 1994, Contact: Brian Winter (206) 452-0321.
EIS No. 940433, Draft EIS, BLM, CA, Rand Open Pit Heap Leach Gold Mine
Project, Construction, Expansion and Operation, Conditional-Use-Permit
Issuance and Plan of Operations and Reclamation Plan Approval,
Randburg, Kern County, CA, Due: December 20,1994, Contact: Ahmend
Mohsen (619) 375-7125.
Dated: October 18, 1994.
William D. Dickerson,
Director, Federal Agency Liaison Division.
[FR Doc. 94-26144 Filed 10-20-94; 8:45 am]
BILLING CODE 6560-50-U