[Federal Register Volume 59, Number 203 (Friday, October 21, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-26145]
[[Page Unknown]]
[Federal Register: October 21, 1994]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-4716-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared October 03, 1994 Through
October 07, 1994 pursuant to the Environmental Review Process (ERP),
under Section 309 of the Clean Air Act and Section 102(2)(C) of the
National Environmental Policy Act as amended. Requests for copies of
EPA comments can be directed to the Office of Federal Activities at
(202) 260-5076.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 08, 1994 (59
FR 16807).
Draft EISs
ERP No. D-AFS-J65200-CO Rating EO2, Telluride Ski Area Expansion
Project, Implementation, Special-Use-Permit and COE Section 404 Permit,
Grand Mesa, Uncompahgre and Gunnion National Forests, Norwood Ranger
District, San Miguel County, CO.
Summary
EPA expressed environmental objections due to potential impacts to
air quality (carbon monoxide and PM-10) in the project area. EPA also
requested additional discussion concerning the potential for
degradation of air quality in an existing Class I airshed.
ERP No. D-AFS-J65219-WY Rating LO1, Shoshone National Forest
Allowable Timber Sale Quantity, Implementation, Fremont, Hot Springs,
Park, Sublette and Teton Counties, WY.
Summary
EPA had no objection to the proposed alternative.
ERP No. D-BLM-J60015-WY Rating LO1, Creston/Blue Gap Natural Gas
and Oil Development Project, Construction and Operation, Special-Use-
Permit, Right-of-Way and COE Section 404 Permit, Carbon and Sweetwater
Counties, WY.
Summary
EPA had no objection to the project as proposed.
ERP No. DS-DOE-A22088-SC Rating EC2, Savannah River Site,
Construction and Operation of Defense Waste Processing Facility,
Updated Information, Aiken and Barnwell Counties, SC.
Summary
EPA had environmental concerns about the project due to the lack of
detail on cumulative impacts as it relates to other pending EISs. EPA
recommended that information from these EISs' be included in the final
EIS.
Final EISs
ERP No. F-AFS-J02028-00. North Slope Oil and Gas Leasing,
Application for Permit to Drill, High Uinta Mountain, Evanston and
Mountain View Ranger District, Wasatch-Cache National Forest and
Flaming Gorge District, Ashley National Forest, Intermountain Region,
Summit and Daggett Counties, UT and Uinta County, WY.
Summary
EPA expressed environmental concerns regarding the lack of full
discussion of air and water quality studies and monitoring requirement
that should be provided in the leasing analysis documents.
ERP No. F-AFS-J65195-WY. Grand Targhee Ski Area Expansion Master
Development Plan, Implementation, Targhee National Forest, Teton
County, WY.
Summary
EPA had no objection to the project as proposed. Initial concerns
regarding air quality have been adequately addressed in the final EIS.
ERP No. F-AFS-J65209-MT. Middle Fork Ecosystem Management Project,
Implementation, Flathead National Forest, Hungry Horse Ranger District,
Flathead River, Flathead County, MT.
Summary
EPA expressed environmental concerns regarding potential effects of
proposed prescribed burning and protection of air quality in nearby
Class I areas and nearby PM-10 nonattainment areas. EPA also indicated
that some level of water quality monitoring would be appropriate to
document effectiveness of BMPs and to assess actual sediment increases
and aquatic biological effects.
ERP No. F-AFS-L65210-ID.West Fork Papoose Timber Sale,
Implementation, Clearwater National Forest, Powell Ranger District,
Idaho County, ID.
Summary
EPA continued to have environmental concerns regarding the sediment
levels that currently exist in the Papoose Creek and Parachute Creek
Watershed.
ERP No. F-BLM-J02029-WY.Enron Burly Field Oil and Gas Leasing,
Permit to Drill, Temporary Use Permits, COE Section 404 Permit and
Right-of-Way Grants, Pinedale Resource Area, Sublette County, WY.
Summary
EPA had no objection to the project as proposed. The Final EIS has
adequately addressed groundwater quality issues and other concerns.
ERP No. F-COE-D39025-00.Anacostia River and Tributaries Feasibility
Study relating to Restoration of Fish and Wild Habitat, Implementation,
Prince George's and Montgomery Cos., MD, and DC.
Summary
EPA had no objection to the project as proposed.
ERP No. F-FHW-E40132-FL.North Suncoast Corridor, Transportation
Improvement and Construction, Northwest Expressway Zone 1 in
Hillsborough Co. to US 98 in Hernando Co. to Zone 2 FL-52 in Pasco Co.,
Funding, COE Section 404 Permit, Hillsborough, Hernando and Pasco
Counties, FL.
Summary
EPA expressed environmental objections to the project due to
significant wetland and upland resources impacts. EPA expressed concern
that the proposed wetland mitigation relies too heavily on creation of
new wetlands that have a low probability for success. EPA recommended
that the alignment be reexamined during the final design stage to
further reduce wetland upland losses.
ERP No. F-FHW-L40182-WA.Twin Bridges Replacement Project, Grosscup
Road over the Yakima River, Funding and COE Section 10/404 Permit,
Benton County, WA.
Summary
EPA provided no formal written comments. EPA had no objection to
the preferred alternative as described in the EIS.
ERP No. F-SFW-G64011-LA.Bayou Sauvage National Wildlife Refuge
Master Plan, Implementation, Orleans Parish, LA.
Summary
EPA had no objection to the action as proposed.
ERP No. F-SFW-J61090-SD.Conata Basin/Badlands Area Black-Footed
Ferret Reintroduction, Implementation, Badlands National Park and
Buffalo Gap National Grassland, Conata Basin, several counties, SD.
Summary
EPA had no objection to the action as proposed.
ERP No. FS-AFS-J82005-MT.Lewis and Clark National Forest Noxious
Weed Control Program, Updated Information, Implementation, several
counties, MT.
Summary
Review of the Final Supplemental EIS has been completed and the
project found to be satisfactory. No formal comment letter was sent to
the preparing agency.
Dated: October 18, 1994.
William D. Dickerson,
Director, Federal Agency Liaison Division.
[FR Doc. 94-26145 Filed 10-20-94; 8:45 am]
BILLING CODE 6560-50-U