[Federal Register Volume 64, Number 203 (Thursday, October 21, 1999)]
[Notices]
[Pages 56778-56783]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-27448]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC99-96-000, et al.]
Commonwealth Edison Company, et al., Electric Rate and Corporate
Regulation Filings
October 13, 1999.
Take notice that the following filings have been made with the
Commission:
[[Page 56779]]
1. Commonwealth Edison Company; Unicom Investment Inc. and Edison
Mission Energy
[Docket No. EC99-96-000]
Take notice that on October 7, 1999, Commonwealth Edison Company
(ComEd) and Unicom Investment Inc.(UII) supplemented the Application
that they filed jointly with Edison Mission Energy (Mission) on July
22, 1999, under Section 203 of the Federal Power Act for authorization
for the sale by ComEd of its fossil generating facilities to a special
purpose subsidiary of Mission. The supplement describes a possible
alternative transaction structure, which would involve a bank or other
financial institution that would act as a ``Qualified Intermediary''
for federal tax purposes, to facilitate a ``like kind exchange'' that
would enable ComEd to defer recognition of gain from the sale to
Mission.
The supplement requests the Commission to approve the alternative
structure, as well as the structure described in the Application as
initially filed, to allow a closing of the transaction with Mission on
or about November 4, 1999.
Comment date: October 25, 1999, in accordance with Standard
Paragraph E at the end of this notice.
2. Rocky Road Power, LLC and NRG Rocky Road LLC
[Docket Nos. EC00-4-000 and ER00-55-000]
Take notice that on October 7, 1999, Rocky Road Power, LLC (Rocky
Road) and NRG Rocky Road LLC (NRG Rocky Road) tendered for filing a
joint application pursuant to Section 203 of the Federal Power Act
requesting that the Commission approve the transfer of an undivided
portion of the ownership interest in Rocky Road to NRG Rocky Road.
In addition, Rocky Road tendered for filing, pursuant to Section
205 of the Federal Power Act, an amendment to its market-based rate
schedule to include a Code of Conduct.
Comment date: November 8, 1999, in accordance with Standard
Paragraph E at the end of this notice.
3. El Paso Energy Corporation, et al.
[Docket No. EC00-5-000]
Take notice that on October 7, 1999, pursuant to Section 203 of the
Federal Power Act (FPA), 16 U.S.C. 824b (1998) and Part 33 of the
Regulations of the Federal Energy Regulatory Commission (Commission),
18 CFR 33 et seq., El Paso Energy Corporation, El Paso Power Holding
Company, El Paso Chaparral Holding Company, El Paso Chaparral Investor,
L.L.C., Limestone Investors, L.L.C., Chaparral Investors, L.L.C., and
Mesquite Investors, L.L.C. (collectively, Applicants) filed an
Application for Commission approval for the transfer of certain
upstream interests in the following indirect subsidiaries of El Paso
Energy Corporation in connection with a refinancing transaction: BIV
Generation Company, L.L.C., Brush Generation Company, L.L.C., Morgan
Generation Company, L.L.C., and Colorado Power Partners. Applicants
have also requested that the Commission find that no passive investor
involved in the proposed transfers of interests will be deemed a
``public utility'' as such term is defined under Section 201 of the FPA
by virtue of its participation therein.
Applicants have requested a shortened notice period and expedited
consideration of the Application.
Comment date: November 8, 1999, in accordance with Standard
Paragraph E at the end of this notice.
4. El Paso Energy Corporation, et al.
[Docket No. EC00-6-000]
Take notice that on October 7, 1999, pursuant to Section 203 of the
Federal Power Act, 16 U.S.C. 824b (1998) and Part 33 of the Regulations
of the Federal Energy Regulatory Commission (Commission), 18 CFR 33 et
seq., El Paso Energy Corporation, El Paso Power Services Company, El
Paso Power Holding Company, El Paso Chaparral Holding Company, El Paso
Chaparral Investor, L.L.C., Chaparral Investors, L.L.C., Mesquite
Investors, L.L.C. and Limestone Investors, L.L.C., (collectively,
Applicants) filed an Application for Commission approval for the
transfer of certain upstream interests in the following indirect
subsidiaries of El Paso Energy Corporation in connection with a
refinancing transaction: El Paso Berkshire Power I Company and El Paso
Berkshire Power II Company. Applicants have requested that the
Commission find that no passive investor involved in the proposed
transfers of interests will be deemed a ``public utility'' as such term
is defined under Section 201 of the FPA by virtue of its participation
therein.
Applicants have also requested a shortened notice period and
expedited consideration of the Application.
Comment date: November 8, 1999, in accordance with Standard
Paragraph E at the end of this notice.
5. El Paso Energy Corporation, et al.
[Docket No. EC00-7-000]
Take notice that on October 7, 1999, pursuant to Section 203 of the
Federal Power Act, 16 U.S.C. 824b (1998) and Part 33 of the Regulations
of the Federal Energy Regulatory Commission (Commission), 18 CFR 33 et
seq., El Paso Energy Corporation, El Paso Power Services Company, El
Paso Power Holding Company, El Paso Chaparral Holding Company, El Paso
Chaparral Investor, L.L.C., Chaparral Investors, L.L.C., Mesquite
Investors, L.L.C. and Limestone Investors, L.L.C., (collectively,
Applicants) filed an Application for Commission approval for the
transfer of certain upstream interests in the following indirect
subsidiaries of El Paso Energy Corporation in connection with a
refinancing transaction El Paso Milford Power I Company and El Paso
Milford Power II Company. Applicants have requested that the Commission
find that no passive investor involved in the proposed transfers of
interests will be deemed a ``public utility'' as such term is defined
under Section 201 of the FPA by virtue of its participation therein.
Applicants have also requested a shortened notice period and expedited
consideration of the Application.
Comment date: November 8, 1999, in accordance with Standard
Paragraph E at the end of this notice.
6. South Glens Falls Energy, LLC
[Docket No. EC00-8-000]
Take notice that on October 7, 1999, South Glens Falls Energy, LLC
filed an application for an order authorizing the transfer of a 15%
interest in South Glens Falls Energy, LLC to General Electric Capital
Corporation.
Comment date: November 8, 1999, in accordance with Standard
Paragraph E at the end of this notice.
7. FPL Energy Wisconsin Wind, LLC
[Docket No. EG00-4-000]
Take notice that on October 7, 1999, FPL Energy Wisconsin Wind, LLC
(``FPL Wind'') filed with the Federal Energy Regulatory Commission an
Application for Determination of Exempt Wholesale Generator Status
pursuant to Part 365 of the Commission's regulations.
FPL Wind is developing a wind-powered eligible facility with a
capacity of approximately 29.7 megawatts, powered by approximately
thirty-three (33) wind turbine generators, which will be located near
Allenton, Wisconsin.
Comment date: November 3, 1999, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
[[Page 56780]]
8. CoGen Lyondell, Inc.
[Docket No. QF83-355-002]
Take notice that on October 5, 1999, CoGen Lyondell, Inc., 1000
Louisiana, Suite 5800, Houston, Texas 77002, filed with the Federal
Energy Regulatory Commission an application for recertification of a
facility as a qualifying cogeneration facility pursuant to Sections
292.207(b) and (d)(2) (1998) of the Commission's regulations. No
determination has been made that the submittal constitutes a complete
filing.
The Commission previously certified the facility as a qualifying
cogeneration facility on October 7, 1983, in Docket No. QF83-355-000.
The Facility was self-recertified in Docket No. QF83-355-001.
Recertification is sought to reflect the divestiture of half of the
ownership interest in the facility held by an upstream owner and a
change in status of such owner.
Comment date: November 4, 1999, in accordance with Standard
Paragraph E at the end of this notice.
9. Badger Creek Limited
[Docket No. QF87-120-003]
Take notice that on October 6, 1999, Badger Creek Limited, 1000
Louisiana, Suite 5800, Houston, Texas 77002, filed with the Federal
Energy Regulatory Commission an application for recertification of a
facility as a qualifying cogeneration facility pursuant to Sections
292.207(b) and (d)(2) (1998) of the Commission's regulations. No
determination has been made that the submittal constitutes a complete
filing.
The Commission previously certified the facility as a qualifying
cogeneration facility on March 23, 1987 in Docket No. QF87-120-000. By
letter dated November 20, 1990, in Docket No. QF87-120-001, Badger
Creek notified the FERC of a change in ownership, a name change for the
steam host, and revised performance data. The Facility was self-
recertified in Docket No. QF87-120-002. Recertification is sought to
reflect the divestiture of certain ownership interests in the facility
held by an upstream owner and a change in status of such owner.
Comment date: November 5, 1999, in accordance with Standard
Paragraph E at the end of this notice.
10. Chalk Cliff Limited
[Docket No. QF87-132-005]
Take notice that on October 7, 1999, Chalk Cliff Limited, 1000
Louisiana, Suite 5800, Houston, Texas 77002, filed with the Federal
Energy Regulatory Commission an application for recertification of a
facility as a qualifying cogeneration facility pursuant to Sections
292.207(b) and (d)(2) (1998) of the Commission's regulations. No
determination has been made that the submittal constitutes a complete
filing.
The Commission previously certified the facility as a qualifying
cogeneration facility on March 23, 1987 in Docket No. QF87-132-000. The
Commission granted recertification of the facility on February 2, 1989
in Docket No. QF87-132-001. The Facility was self-recertified in Docket
Nos. QF87-132-002, QF87-132-003, and QF87-132-004. Recertification is
sought to reflect the divestiture of certain upstream ownership
interests in the facility and a change in status of such owners.
Comment date: November 8, 1999, in accordance with Standard
Paragraph E at the end of this notice.
11. Illinois Municipal Electric Agency v. Illinois Power Company
[Docket No. EL00-4-000]
Take notice that on October 8, 1999, the Illinois Municipal
Electric Agency tendered for filing a complaint against Illinois Power
Company in order to seek the establishment by the Commission of an
effective refund date in connection with rate reductions expected as a
result of Illinois Power's transmission rate filing in Docket No. ER99-
4415.
Comment date: October 28, 1999, in accordance with Standard
Paragraph E at the end of this notice.
12. Southern California Edison Company; California Independent
System; Operator Corp.; El Segundo Power, LLC; Pacific Gas and
Electric Company; Duke Energy Moss Landing LLC; Duke Energy Oakland
LLC; San Diego Gas and Electric Company; Southern California Edison
Company; Pacific Gas and Electric Company; San Diego Gas & Electric
Company; Duke Energy Moss Landing LLC; Duke Energy Oakland LLC;
Duke Energy Moss Landing LLC; Duke Energy Oakland LLC
[Docket Nos. ER98-441-011 ER98-2550-000 ER98-495-000 ER98-1614-000
ER98-2145-000 ER98-2668-000 ER98-2669-000 ER98-4296-000 ER98-4300-000
ER98-496-000 ER98-2160-000 ER98-441-001 ER98-495-001 ER98-496-001 ER98-
4300-001 ER98-2668-001 ER98-2669-001 ER98-4296-001 ER98-2668-000 ER98-
2669-000 ER99-1127-000 ER99-1128-000 ER98-4296-000 and ER98-4300-000]
Take notice that on October 5, 1999, Williams Energy Marketing &
Trading Company (Williams), tendered for filing a refund report as
required by the Stipulation and Agreement filed in the above-captioned
proceedings on April 2, 1999 and approved by the Commission in an Order
issued May 28, 1999.
Comment date: October 25, 1999, in accordance with Standard
Paragraph E at the end of this notice.
13. MidAmerican Energy Company
[Docket No. ER00-47-000]
Take notice that on October 6, 1999, MidAmerican Energy Company
(MidAmerican), 666 Grand Avenue, Des Moines, Iowa 50309, filed with the
Commission a Firm Transmission Service Agreement with Basin Electric
Power Cooperative (Basin), dated September 14, 1999, and a Non-Firm
Transmission Service Agreement with Basin, dated September 14, 1999,
entered into pursuant to MidAmerican's Open Access Transmission Tariff.
MidAmerican requests an effective date of September 14, 1999, for
the Agreements with Basin, and accordingly seeks a waiver of the
Commission's notice requirement.
MidAmerican has served a copy of the filing on Basin, the Iowa
Utilities Board, the Illinois Commerce Commission and the South Dakota
Public Utilities Commission.
Comment date: October 26, 1999, in accordance with Standard
Paragraph E at the end of this notice.
14. Nevada Power Company
[Docket No. ER00-48-000]
Take notice that on October 6, 1999, Nevada Power Company (NPC),
tended for filing Service Agreement to provide Non-Firm Point-to-Point
Transmission Service under NPC's (Transmission Provider) Open Access
Transmission Tariff with MIECO, Inc. (Transmission Customer).
A copy of this filing has been served on MIECO, Inc, (Transmission
Customer) and the Nevada Public Service Commission.
Comment date: October 26, 1999, in accordance with Standard
Paragraph E at the end of this notice.
15. Nevada Power Company
[Docket No. ER00-49-000]
Take notice that on October 6, 1999, Nevada Power Company (Nevada
Power), tended for filing Service Agreement with El Dorado Energy,
L.L.C., pursuant to Nevada Power's Coordination Sales Tariff.
Nevada Power requests an effective date of November 1, 1999.
A copy of this filing has been served on El Dorado Energy, L.L.C.,
the Nevada Public Service Commission and the Bureau of Consumer
Protection.
[[Page 56781]]
Comment date: October 26, 1999, in accordance with Standard
Paragraph E at the end of this notice.
16. Nevada Power Company
[Docket No. ER00-50-000]
Take notice that on October 6, 1999, Nevada Power Company (NPC),
tendered for filing a Service Agreement to provide Non-Firm Point-to-
Point Transmission Service under NPC's (Transmission Provider) Open
Access Transmission Tariff with the Public Service Company of Colorado
(Transmission Customer).
A copy of this filing has been served on the Public Service Company
of Colorado (Transmission Customer) and the Nevada Public Service
Commission.
Comment date: October 26, 1999, in accordance with Standard
Paragraph E at the end of this notice.
17. Entergy Services, Inc.
[Docket No. ER00-52-000]
Take notice that on October 6, 1999, Entergy Services, Inc., on
behalf of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy
Louisiana, Inc., Entergy Mississippi, Inc., and Entergy New Orleans,
Inc., (collectively, the Entergy Operating Companies) tendered for
filing a Short-Term Firm Point-to-Point Transmission Service Agreement
between Entergy Services, Inc., as agent for the Entergy Operating
Companies, and Western Resources, Inc.
Comment date: October 26, 1999, in accordance with Standard
Paragraph E at the end of this notice.
18. Deseret Generation & Transmission Co-operative, Inc.
[Docket No. ER00-53-000]
Take notice that on October 6, 1999, Deseret Generation &
Transmission Co-operative, Inc. (Deseret), tendered for filing a
proposed amendment to its FERC Electric Tariff, Volume No. 1, Service
Agreement Nos. 1 through 6. The proposed changes would provide a rate
rebate to each of Deseret's six Member Cooperatives.
Deseret requests an effective date of December 6, 1999.
Copies of this filing were served upon Deseret's six Member
Cooperatives.
Comment date: October 26, 1999, in accordance with Standard
Paragraph E at the end of this notice.
19. Tampa Electric Company
[Docket No. ER00-54-000]
Take notice that on October 6, 1999, Tampa Electric Company (Tampa
Electric), tendered for filing a service agreement with Florida Power
Corporation (FPC) under Tampa Electric's market-based sales tariff.
Tampa Electric proposes that the service agreement be made
effective on October 6, 1999.
Copies of the filing have been served on FPC and the Florida Public
Service Commission.
Comment date: October 26, 1999, in accordance with Standard
Paragraph E at the end of this notice.
20. FPL Energy Wisconsin Wind, LLC
[Docket No. ER00-56-000]
Take notice that on October 7, 1999, FPL Energy Wisconsin Wind, LLC
(FPL Wind), petitioned the Commission for acceptance of the power
purchase agreement between FPL Wind and Alliant Energy--Wisconsin Power
and Light Company, Inc., and the power purchase agreement between FPL
Wind and Wisconsin Electric Power Company, and to accept the rates
under these respective agreements as just and reasonable under Section
205(a) of the Federal Power Act, 16 U.S.C. Sec. 824d(a); for the
granting of certain blanket approvals, including the authority to sell
electricity at market-based rates; and for the waiver of certain
Commission regulations. FPL Wind is a limited liability company that
proposes to engage in the wholesale sale of electric power in the state
of Wisconsin and is headquartered in Florida.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
21. Cinergy Services, Inc.
[Docket No. ER00-57-000]
Take notice that on October 6, 1999, Cinergy Services, Inc.
(Services), tendered for filing on behalf of its operating companies,
The Cincinnati Gas & Electric Company and PSI Energy, Inc.
(collectively Cinergy Operating Companies) Notices of Cancellation,
dated September 1, 1999, for the Original Service Agreement, dated
March 17, 1997, between Edgar Electric Cooperative Association (Edgar)
and the Cinergy Operating Companies under the COC FERC Electric Cost-
Based Power Sales Tariff, Original Volume No. 6--CB and COC FERC
Electric Market-Based Power Sales Tariff, Original Volume No. 7--MB.
The Notices of Cancellation to the Original Service Agreement,
dated March 17, 1997, are necessary to eliminate duplicate contractual
arrangements between Edgar and the Cinergy Operating Companies under
the above referenced Power Sales Tariffs. Transactions will continue to
be arranged under the Revised Service Agreement, dated March 17, 1997,
as supplemented.
Copies of the filing were served on Edgar and the State Regulatory
Commissions of Illinois, Ohio, Kentucky and Indiana.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
22. New England Power Pool
[Docket No. ER00-58-000]
Take notice that on October 7, 1999, the New England Power Pool
Participants Committee filed notification that the effective date of
membership in the New England Power Pool (NEPOOL) of Entergy Nuclear
Generation Company (Entergy) was July 13, 1999.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
23. Southern California Edison Company
[Docket No. ER00-60-000]
Take notice that on October 6, 1999, Southern California Edison
Company (SCE), tendered for filing the amendments to the existing firm
transmission service agreements between SCE and the City of Riverside,
California.
The Amendments serve to implement Riverside's election to convert
transmission loss provisions in the existing agreements to the
California Independent System Operator's Tariff loss provisions,
pursuant to Section 6.4.3 of the Edison-Riverside Restructuring
Agreement.
SCE requests an effective date of October 3, 1999, and seeks waiver
of the Commission's notice requirements to permit the requested
effective date.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
24. Illinois Power Company
[Docket No. ER00-61-000]
Take notice that on October 1, 1999, Illinois Power Company
(Illinois Power), 500 South 27th Street, Decatur, Illinois 62526,
tendered for filing firm and non-firm transmission agreements under
which Illinova Power Marketing, Inc., will take transmission service
pursuant to its open access transmission tariff. The agreements are
based on the Form of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of October 1, 1999.
[[Page 56782]]
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
25. PECO Energy Company
[Docket No. ER00-62-000]
Take notice that on October 7, 1999, PECO Energy Company (PECO),
tendered for filing a Service Agreement dated September 23, 1999 with
WISVEST-CONNECTICUT, LLC. (WVCT) under PECO's FERC Electric Tariff
Original Volume No. 1 (Tariff). The Service Agreement adds WVCT as a
Wisvest-Connecticut, LLC under the Tariff.
PECO requests an effective date of September 23, 1999, for the
Service Agreement.
PECO states that copies of this filing have been supplied to WVCT
and to the Pennsylvania Public Utility Commission.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
26. PECO Energy Company
[Docket No. ER00-63-000]
Take notice that on October 7, 1999, PECO Energy Company (PECO),
tendered for filing a Service Agreement dated September 23, 1999 with
MICHIGAN PUBLIC POWER AGENCY. (MPPA) under PECO's FERC Electric Tariff
Original Volume No. 1 (Tariff). The Service Agreement adds MPPA as a
Michigan Public Power Agency under the Tariff.
PECO requests an effective date of September 23, 1999, for the
Service Agreement.
PECO states that copies of this filing have been supplied to MPPA
and to the Pennsylvania Public Utility Commission.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
27. Florida Power & Light Company
[Docket No. ER00-64-000]
Take notice that on October 7, 1999, Florida Power & Light Company
(FPL), tendered for filing proposed service agreements with Carolina
Power & Light Company for Short-Term Firm and Non-Firm transmission
service under FPL's Open Access Transmission Tariff.
FPL requests that the proposed service agreements are permitted to
become effective on October 1, 1999.
FPL states that this filing is in accordance with Part 35 of the
Commission's Regulations.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
28. Public Service Company of Colorado
[Docket No. ER00-65-000]
Take notice that on October 7, 1999, Public Service Company of
Colorado tendered for filing an agreement adding a new delivery point
with Yampa Valley Electric Association, Inc.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
29. Commonwealth Edison Company
[Docket No. ER00-66-000]
Take notice that on October 7, 1999, Commonwealth Edison Company
(ComEd), tendered for filing Firm Service Agreements with Wisconsin
Electric Power Company (WEPCO) and with Commonwealth Edison Company, in
the wholesale merchant function (CEWMD) under the terms of ComEd's Open
Access Transmission Tariff (OATT).
ComEd requests an effective date of October 1, 1999, for the
Service Agreements with WEPCO and January 1, 2000 for the Service
Agreements with CEWMD, and therefore requests waiver of the
Commission's notice requirements.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
30. New York Independent System Operator, Inc.; Central Hudson Gas
& Electric Corporation; Consolidated Edison Company of New York,
Inc.; Long Island Lighting Company; New York State Electric & Gas
Corporation; Niagara Mohawk Power Corporation; Orange & Rockland
Utilities, Inc.; Rochester Gas & Electric Corp.; Power Authority of
the State of New York; and New York Power Pool
[Docket No. ER00-67-000]
Take notice that on October 7, 1999, the Member Systems of the New
York Power Pool (Member Systems) and the New York Independent System
Operator, Inc. (NYISO), tendered for filing revised sheets for the ISO
Open Access Transmission Tariff and the New York Independent System
Operator Market Administration and Control Area Service Tariff.
The Member Systems and the NYISO request an effective date as the
date on which the NYISO commences operations and request waiver of the
Commission's notice requirements.
A copy of this filing was served upon all persons on the
Commission's official service list in Docket No. ER97-1523-000 and the
respective electric utility regulatory agencies in New York, New Jersey
and Pennsylvania.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
31. Alliant Services, Inc.
[Docket No. ER00-68-000]
Take notice that on October 7, 1999, Alliant Services, Inc., on its
own behalf and on behalf of Wisconsin Power & Light Company, tendered
for filing a DLM Service Agreement with Wisconsin Public Power Inc.,
two W-4 Service Agreements, as amended, with Sheboygan Falls Utilities,
and one W-4 Service Agreement, as amended, with Adams-Columbia Electric
Cooperative.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
32. New England Power Pool and ISO New England Inc.
[Docket No. ER00-69-000]
Take notice that on October 7, 1999, the New England Power Pool
Participants Committee (NEPOOL) and ISO New England Inc. (the ISO)
jointly tendered for filing changes to Market Rule and Procedure
Appendix 6-A (Appendix 6-A) in the above-captioned dockets.
Additionally, NEPOOL and the ISO have requested a waiver of the
Commission's notice requirements to permit the revisions to Appendix 6-
A to become effective as of June 1, 1999.
NEPOOL and the ISO state that copies of these materials were sent
to the New England state governors and regulatory commissions and the
Participants in the New England Power Pool.
Comment date: October 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
33. Illinois Municipal Electric Agency v. Commonwealth Edison
Company Commonwealth Edison Company of Indiana
[Docket No. EL00-3-000]
Take notice that on October 8, 1999, the Illinois Municipal
Electric Agency tendered for filing a complaint against Commonwealth
Edison Company in order to seek the establishment by the Commission of
an effective refund date in connection with rate reductions expected as
a result of Commonwealth Edison's transmission rate filing in Docket
No. ER99-4470.
Comment date: October 28, 1999, in accordance with Standard
Paragraph E at the end of this notice. Answers to the compliant are
also due on or before October 28, 1999.
Standard Paragraphs
E. Any person desiring to be heard or to protest such filing should
file a
[[Page 56783]]
motion to intervene or protest with the Federal Energy Regulatory
Commission, 888 First Street, NE, Washington, DC 20426, in accordance
with rules 211 and 214 of the Commission's rules of practice and
procedure (18 CFR 385.211 and 385.214). All such motions or protests
should be filed on or before the comment date. Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of these filings are on file with the Commission and
are available for public inspection. This filing may also be viewed on
the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208-
2222 for assistance).
David P. Boergers,
Secretary.
[FR Doc. 99-27448 Filed 10-20-99; 8:45 am]
BILLING CODE 6717-01-P