99-27486. Notice of Application Tendered for Filing With the Commission, Establishing a Deadline for Final Amendment, and Soliciting Additional Study Requests  

  • [Federal Register Volume 64, Number 203 (Thursday, October 21, 1999)]
    [Notices]
    [Page 56784]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-27486]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Tendered for Filing With the Commission, 
    Establishing a Deadline for Final Amendment, and Soliciting Additional 
    Study Requests
    
    October 15, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the commission and is available for public inspection:
        a. Type of application: New Major License
        b. Project No.: 2416-009
        c. Date filed: October 5, 1999
        d. Applicant: Aquenergy Systems Inc.
        e. Name of project: Ware Shoals Project.
        f. Location: On Saluda River in the Town of Ware Shoals, within the 
    counties of Laurens, Greenwood and Abbeville, South Carolina. No 
    Federal Lands used in this project.
        g. Filed pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant contact: Beth Harris, P.E., CHI Energy, Inc., P.O. 
    5897, Greenville, SC 29604, (864) 281-9630 Ext. 105.
        i. FERC contact: Any questions on this notice should be addressed 
    to Timothy Looney, E-mail address, timothy.looney@ferc.fed.us, or 
    telephone 202-219-2852.
        j. Deadline for filing final amendments: February 5, 2000.
        k. Deadline for filing additional study requests: December 6, 1999.
        All documents (original and eight copies) should be filed with: 
    David P. Boergers, Secretary Federal Energy Regulatory Commission, 888 
    First Street, NE, Washington, DC 20426.
        The Commission's rules of practice and procedure require all 
    intervenors filing documents with the commission to deserve a copy of 
    that document on each person whose name appears on the official service 
    list for the project. Further, if an intervenor files comments or 
    documents with the Commission relating to the merits of an issue that 
    may affect the responsibilities of a particular resource agency, they 
    must also serve a copy of the document on that resource agency.
        l. Status of environmental analysis: This application is not ready 
    for environmental analysis at this time.
        m. The existing project consists of a dam and reservoir, a power 
    canal and two turbine generating units with a total nameplate rating of 
    6,200-kilowatts, and appurtenant facilities. The project would have an 
    annual generation of 23,500,000 kilowatt hours. The applicant does not 
    propose any modifications to the project features or operation.
        n. A copy of the application is available for inspection and 
    reproduction at the Commission's Public Reference Room, located at 888 
    First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 
    208-1371. This filing may be viewed on the web to http://
    www.ferc.fed.us/online/rims.htm call 202-208-2222 for assistance). A 
    copy is also available for inspection and reproduction at the address 
    in item h above.
        o. With this notice we are initiating consultation with the South 
    Carolina State Historic Preservation Officer as required by Sec. 106, 
    National Historic Preservation Act, and the regulations of the Advisory 
    Council on Historic Preservation, 36 CFR 800.4.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-27486 Filed 10-20-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/21/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-27486
Pages:
56784-56784 (1 pages)
PDF File:
99-27486.pdf